| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Urvi Construction Co L3 | S M Enterprise L1 | HIR CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and supplying in standard length ISI mark high density Polyethylene H.D.P.E pipes suitable for portable water as per IS specification no 4984/1995 including all local and central taxes ,Transportation,freight charges, octrol,inspection charges loading ,unloading,conveyance to thedept,stores etc. comp. (HDPE PE-100 of 6 Kg/cm2
50 mm HDPE | 15,300 | Rmt. | 170 ₹26,01,000 | 130 ₹19,89,000 | 120 ₹18,36,000 Lowest |
| 2.00 | 63 mm HDPE | 10,000 | Rmt. | 270 ₹27,00,000 | 175 ₹17,50,000 Lowest | 200 ₹20,00,000 |
| 3.00 | 75 mm HDPE | 3,026.96 | Rmt. | 370 ₹11,19,975.2 | 220 ₹6,65,931.2 Lowest | 280 ₹8,47,548.8 |
| 4.00 | 20 mm HDPE | 9,054 | Rmt. | 95 ₹8,60,130 | 85 ₹7,69,590 | 42 ₹3,80,268 Lowest |
| 5.00 | Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with shoring and struting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. complete for all lifts and strata as specified.
0.00 to 1.50 mt.
a) In hard murrum, boulder incl. macadam road. | 6,160.2 | Cu.m | 205 ₹12,62,841 | 250 ₹15,40,050 | 195 ₹12,01,239 Lowest |
| 6.00 | b) In all sorts of soil and soft murrum | 10,267 | Cu.m | 205 ₹21,04,735 | 165 ₹16,94,055 Lowest | 195 ₹20,02,065 |
| 7.00 | c) In Soft rock and/or masonry in CM or LM or Lime concrete etc | 4,106.8 | Cu.m | 205 ₹8,41,894 | 180 ₹7,39,224 Lowest | 195 ₹8,00,826 |
| 8.00 | Lowering, laying and jointing HDPE pipes specials of following class and diameter(by butt fusion welding method)including cost of conveyance from store to site of work at all level including cost of labour,material,giving satisfactory hydraulic testing etc.comp
50 mm HDPE | 15,300 | Rmt. | 16 ₹2,44,800 Lowest | 30 ₹4,59,000 | 60 ₹9,18,000 |
| 9.00 | 63 mm HDPE | 10,000 | Rmt. | 22 ₹2,20,000 Lowest | 36 ₹3,60,000 | 68 ₹6,80,000 |
| 10.00 | 75 mm HDPE | 3,026.96 | Rmt. | 26 ₹78,700.96 Lowest | 40 ₹1,21,078.4 | 92 ₹2,78,480.32 |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
24 Jun 2026, 2:30 pmClosed
Executive Engineer, PWD, Civil Dn.III(DP),DNH,Silv
Executive Engineer, PWD, Civil Dn.III(DP),DNH,Silvassa
Providing Water Supply Connection to household not connected and within Design Network area Part-2 and Connection to Govt. Buildings in South Zone (DNH) (2nd Call)
2026_UTDNH_8115_1
E TENDER NOTICE NUMBER 08 OF 2026-2027 (DP)
Open Tender
Civil Works - Water Works
Item Rate
90 days
UT of DNH
As per NIT refer
3 documents required · 3 mandatory
₹1,000
Executive Engineer, PWD, Civil Dn.III(DP),DNH
₹1.9 L
21 Jul 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and supplying in standard length ISI mark high density Polyethylene H.D.P.E pipes suitable for portable water as per IS specification no 4984/1995 including all local and central taxes ,Transportation,freight charges, octrol,inspection charges loading ,unloading,conveyance to thedept,stores etc. comp. (HDPE PE-100 of 6 Kg/cm2
50 mm HDPE | 15,300 | Rmt. | 1.25 | ₹19,125 |
| 2 | 63 mm HDPE | 10,000 | Rmt. | - | - |
| 3 | 75 mm HDPE | 3,026.96 | Rmt. | -1.25 | - |
| 4 | 20 mm HDPE | 9,054 | Rmt. | -2.5 | - |
| 5 | Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with shoring and struting if required as per required gradient and line including safety provisions using site rails and stacking excavated stuff including up to all required lead cleaning the site etc. complete for all lifts and strata as specified.
0.00 to 1.50 mt.
a) In hard murrum, boulder incl. macadam road. | 6,160.2 | Cu.m | -3.75 | - |
| 6 | b) In all sorts of soil and soft murrum | 10,267 | Cu.m | -5 | - |
| 7 | c) In Soft rock and/or masonry in CM or LM or Lime concrete etc | 4,106.8 | Cu.m | -6.25 | - |
| 8 | Lowering, laying and jointing HDPE pipes specials of following class and diameter(by butt fusion welding method)including cost of conveyance from store to site of work at all level including cost of labour,material,giving satisfactory hydraulic testing etc.comp
50 mm HDPE | 15,300 | Rmt. | -7.5 | - |
| 9 | 63 mm HDPE | 10,000 | Rmt. | -8.75 | - |
| 10 | 75 mm HDPE | 3,026.96 | Rmt. | -10 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_8305.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].