Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.7 LRejected-Finance | ₹6.7 L | L2 | Rejected-Finance Reject |
| 3 | L3₹6.8 LRejected-Finance | ₹6.8 L | L3 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | M/S.RIYA ENTERPRISES L1 | simla cool makers L3 | Lakshmipathy L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soil except sand and rock such as hard stiff clay black cotton shales murrums hard red earth etc with all lead and lift and depositing on banks asper SS20 B etc complete | 4.94 | M3 | 205.5 ₹1,015.99 | 250 ₹1,236 | 160 ₹791.04 |
| 2.00 | Plain cement concrete 1;4;8 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour charges etc complete | 0.53 | M3 | 5,083 ₹2,671.62 | 5,083 ₹2,671.62 | 5,500 ₹2,890.80 |
| 3.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 195.73 | Kg | 91.9 ₹17,987.97 | 100 ₹19,573.42 | 90 ₹17,616.08 |
| 4.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 2.54 | M3 | 8,078.5 ₹20,527.06 | 8,078.5 ₹20,527.06 | 8,200 ₹20,835.79 |
| 5.00 | Centering and shuttering chsrages for All PCC and RCC works using MS steel Moulds and soffits strutting with casurina props 10-13 cm dia including cost and conveyance of all materials and including all labour charges etc complete | 15.74 | M2 | 868.25 ₹13,666.26 | 868.25 ₹13,666.26 | 1,050 ₹16,527 |
| 6.00 | Brick work in CM 1:3 (one cement & Three Crushed Stone Sand (M- Sand) using ground moulded chamber bricks of size 9"X4 3/8"X 2 3/4" standard specification including finishing, curing, etc., complete complying with standard specification - 100cft | 1 | M3 | 7,194.5 ₹7,194.50 | 7,194.5 ₹7,194.50 | 6,935 ₹6,935 |
| 7.00 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 5.1 | M2 | 267.5 ₹1,363.18 | 267.5 ₹1,363.18 | 275 ₹1,401.40 |
| 8.00 | Painting two coats using Emulsion paint with including cost and conveyance of all materials and including all labour charges etc complete as per specification | 1,101.09 | M2 | 148.5 ₹1.6 L | 148.5 ₹1.6 L | 171 ₹1.9 L |
| 9.00 | Paver Blocks | 337.5 | M2 | 1,051.5 ₹3.5 L | 1,051.5 ₹3.5 L | 997 ₹3.4 L |
| 11.00 | Grill Painting | 472 | M2 | 157 ₹74,104 | 157 ₹74,104 | 152 ₹71,744 |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
23 Jan 2026, 3:00 pmClosed
TCMC Zone V
Erikarai Street,East Tambaram
TCMC-painting Gandhipark Compound Wall West Ward No.48 Zone V in Tambaram City Municipal Corporation
2026_DMA_645532_8
003/2025/E1
Open Tender
Civil Works
TCMC Zone V
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
29 May 2026
22 Jan 2026
23 Jan 2026
22 Jan 2026
23 Jan 2026
22 Jan 2026
Earth work excavation in all classes of soil except sand and rock such as hard stiff clay black cotton shales murrums hard red earth etc with all lead and lift and depositing on banks asper SS20 B etc complete
Plain cement concrete 1;4;8 mix using 40 mm HBG ISS metal including cost and conveyance of all materials and including all labour charges etc complete
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Centering and shuttering chsrages for All PCC and RCC works using MS steel Moulds and soffits strutting with casurina props 10-13 cm dia including cost and conveyance of all materials and including all labour charges etc complete
Brick work in CM 1:3 (one cement & Three Crushed Stone Sand (M- Sand) using ground moulded chamber bricks of size 9"X4 3/8"X 2 3/4" standard specification including finishing, curing, etc., complete complying with standard specification - 100cft
Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete
Painting two coats using Emulsion paint with including cost and conveyance of all materials and including all labour charges etc complete as per specification
Paver Blocks
Grill Painting
New Grill
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_773686.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid