Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Fee/PreQual/Technical/Finance DHARNIDHAR KA PURA ATRAMPUR PRAYAGRAJ | -0.07% | ₹8.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.4 L+₹337.67 (0.04%)Admitted-Fee/PreQual/Technical/Finance 5 361 AWAS VIKAS MAINPURI | MAINPURI | UTTAR PRADESH | 205001 | -0.03% | ₹8.4 L+₹337.67 (0.04%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.4 L+₹506.51 (0.06%)Admitted-Fee/PreQual/Technical/Finance | -0.01% | ₹8.4 L+₹506.51 (0.06%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.0 L
EMD Value
₹19,920
Closing Date
14 Jul 2026, 12:00 pmClosed
B.D.O. DEOKALI GHAZIPUR
OFFICE B.D.O. DEOKALI GHAZIPUR
DEOKALI BLOCK PARISAR ME SABHAGAR KAKSH KE AWASHESH BHAG KA NIRMAN KARY
2026_RDUP_1165761_36
376 date 30.06.2026
Open Tender
Civil Works
Percentage
90 days
DEOKALI GHAZIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
B.D.O. DEOKALI GHAZIPUR
₹19,920
Yes
14 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil including lift upto 1.50M and lead upto 30M including watering ramming and dressing etc. SI no. 251 | - | cum | - | - |
| 2 | Concrete with 4cm gauge brick ballast coarse sand of 2.25 FM and cement in proportion of 1:4:8 in foundation and under floor including supply of all materials labour T&P etc required for proper completion of the work. SI No. 275 | 1 | cum | - | - |
| 3 | M-150 brick work in 1:6 cement and f sand in foundation and plinth including supply of all materials labour and T&P etc. required for proper completion of the work. SI No. 303 | - | cum | - | - |
| 4 | M-150 b/w with 1:6 cement and c.sand morter in super structure for one brick thickness i/c all labour material T&P as per SI No. 303+309+310 | - | cum | - | - |
| 5 | RCC work in 1:2:4 cement c.sand and 20mm dalla grit in lintel of door and window as per SI No. 284 | 1 | cum | - | - |
| 6 | RCC work in lintel band with cement c.sand and 20mm dalla grite in proporton of 1:1.:3 for RCC T beam and slab exluding its supply of reinforcement i/c all labour material T&P as per SI No. 288b | - | cum | - | - |
| 7 | Mild steel in RCC work cutting bending and binding i/c all complete work SI No. 504 | 1 | qtl | - | - |
| 8 | 12mm thick plaster with cement mortar consisting of 1 part cement and 6 part of sand of 1.25 fineness modulus mortar minimum thickness not be less than 10mm including supply of all materials. SI No. 586+596 | 1 | sqm | - | - |
| 9 | 12mm thick plaster with cement mortar consisting of 1 part cement and 6 part of sand of 1.25 fineness modulus mortar minimum thickness not be less than 10mm including supply of all materials. SI No. 586 | - | sqm | - | - |
| 10 | Putty work i/c material and labour charge as per LMR | 1 | cum | - | - |
stage.html
html • 0.02 MB
finance_2187063.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_2187063.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .