Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | -3.11% | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.6 LAdmitted-Finance | +1.00% | ₹4.6 L | L2 | Admitted-Finance |
| 3 | L2₹4.6 LAdmitted-Finance | +1.00% | ₹4.6 L | L2 | Admitted-Finance |
Tender Value
₹4.6 L
EMD Value
₹9,200
Closing Date
28 Mar 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_306589_2
e-NIT No.200 of 2025-26 Dated 23-03-2026
Open Tender
Civil Works
30 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹9,200
11 Apr 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | |||||
| 2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | |||||
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 4Filling of stone in Horizental on level including the cost of stone complete job. | |||||
| 5Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | |||||
| 6Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | |||||
| 7Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | |||||
| 8Carriage of material by M.T including loading and unloading and stacking on site complete | |||||
| 8.01 | Carriage of Sand/Bajree by an average distance of 15 km by MT | - | Cum | - | - |
| 8.02 | Carriage of stone by an average distance of 08 km by MT | - | Cum | - | - |
stage.html
html • 0.03 MB
techsummary_995413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_995413.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid