| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC CCroad Veeran kovil street, Akkadavalli | |
| 2 | Rejected-Technical | - | Rejected-Technical Responsive |
| Sl No | Description | Qty | Unit | AQUA PURE DROPS L1 | DHANAPAL L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 7.28 | cum | 123.2 ₹896.9 Lowest | 123.2 ₹896.9 Lowest |
| 1.02 | Filling with M sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete. | 15.42 | sqm | 1,865.2 ₹28,761.38 Lowest | 1,865.2 ₹28,761.38 Lowest |
| 1.03 | CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 19.06 | cum | 5,569.7 ₹1,06,158.48 Lowest | 5,569.7 ₹1,06,158.48 Lowest |
| 1.04 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai | 57.67 | cum | 516.5 ₹29,786.56 Lowest | 516.5 ₹29,786.56 Lowest |
| 1.05 | CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete. | 5.58 | sqm | 6,965.1 ₹38,865.26 Lowest | 6,965.1 ₹38,865.26 Lowest |
| 1.06 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 13.66 | Nos | 9,389.1 ₹1,28,255.11 Lowest | 9,389.1 ₹1,28,255.11 Lowest |
| 1.07 | Supply and fixing of Tar Pad, including all cost and conveyance of materials and labour charges etc, complete. | 12 | Nos | 150 ₹1,800 Lowest | 150 ₹1,800 Lowest |
| 1.08 | Name Board | 1 | Nos | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 1.90 | Provision for Photo charges | 1 | Nos | 500 ₹500 Lowest | 1,000 ₹1,000 |
Tender Value
₹4.1 L
EMD Value
₹4,500
Closing Date
4 Sept 2025, 3:00 pmClosed
BDO Annagramam
Panchayat Union Annagramam
Providing Cement Concrete pavement (61 m 3.00 m ) at Veeran kovil street, Akkadavalli in Akkadavalli Panchayat
2025_RDTN_599218_5
b4/495/2025 AGAMT Annagramam
Open Tender
Civil Works
Works
Panchayat Union Annagramam
as per tender
4 documents required · 4 mandatory
₹0
₹4,500
Yes
8 Sept 2025
1 Sept 2025
4 Sept 2025
1 Sept 2025
4 Sept 2025
1 Sept 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Filling with M sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply and fixing of Tar Pad, including all cost and conveyance of materials and labour charges etc, complete.
Name Board
Provision for Photo charges
DHANAPAL (BID ID -1445078)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_716299.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .