| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹359.1 CrFinancial bid opened 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | ₹359.1 Cr | L1 | Financial bid opened |
| 2 | L2₹398.6 Cr+₹39.5 Cr (11.0%) 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | ₹398.6 Cr+₹39.5 Cr (11.0%) | L2 | - |
| 3 | L3₹437.3 Cr+₹78.3 Cr (21.8%) 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | ₹437.3 Cr+₹78.3 Cr (21.8%) | L3 | - |
| 4 | L4₹456.4 Cr+₹97.3 Cr (27.1%) 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | 1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) | ₹456.4 Cr+₹97.3 Cr (27.1%) | L4 | - |
| 5 | - | - | - | - |
Tender Value
₹486.0 Cr
EMD Value
₹5.0 Cr
Closing Date
25 Apr 2025, 3:00 pmClosed
EE(C)-BFD-II, Amritsar
Nishant Neeraj
EE, BFD-II, CPWD, Amritsar
1 Construction of 2280.30 Km Lateral & Axial Roads in the state of Punjab and Rajasthan along Indo-Pakistan Border. (EPC Mode). (SH Construction of Lateral Road (Length 85.810 Km ) along Indo-Pak Border in Gurdaspur SEctor under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 Replacement of old designe damaged fence with single row new design fence at the locations, where raising of fence is required along the lateral road in various sectors under punjab frontier along Indo-Pak Border (Length 207.1 Km) (EPC Mode). (SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur Sector under Punjab Frontier Pckage-I) Subwork/Packages: 1 SH Construction of lateral Road (Length 85.810 Km) along Indo-pak Border in Gurdaspur Sector under Punjab Frontier including 05 year defect liability period and 05 year maintenance period Package-I (a) 2 SH Replacement of old design damaged fence with single row new design fence at various locations (Length 81.971 Km) along Indo-Pak Border in Gurdaspur sector under Punjab Frontier Package-I)
107923
08/CE/BFLZ/2024-25 and 06/EE/BFD-II/CPWD/ASR/2024-25
OPEN
Civil Works - Roads
NCB
30 months
Gurdaspur, Punjab
16 documents required · 16 mandatory
₹5.0 Cr
CE BFLZ CPWD Vidyut Bhawan New Delhi
25 Apr 2025
28 Mar 2025
25 Apr 2025
25 Apr 2025
8 Apr 2025
9 Apr 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
06NIT+GSP.pdf
document • 6.35 MB
06+L+Section+Gurdaspur+%281%29.pdf
document • 36.89 MB
02+Soil+Investigation+Report+%28Volume+1%29+%28Page+221+-+638%29.pdf
document • 3.67 MB
03+Soil+Investigation+Report+%28Volume+2%29+%28Page+639+-+1143%29.pdf
document • 4.66 MB
04+Soil+Investigation+Report+%28Volume+3%29+%28Page+1144+-+1359%29.pdf
document • 2.32 MB
05+Soil+Investigation+Report+%28Volume+4%29+%28Page+1360+-+1677+%29.pdf
document • 3.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .