| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -0.01% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹9,750.83 (2.01%)Admitted-Finance | +2.00% | ₹4.9 L+₹9,750.83 (2.01%) | L2 | Admitted-Finance |
| 3 | L3₹5.0 L+₹14,601.99 (3.01%)Admitted-Finance | +3.00% | ₹5.0 L+₹14,601.99 (3.01%) | L3 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,702
Closing Date
20 Aug 2026, 2:00 pmClosed
Assistant Engineer, Gazole Highway Sub Division
Gazole, Malda
Estimate for repairing of Adina - Chakli Road (VR) (From ch. 0.00 km to 2.00 km in stretches) of Gazole Highway Sub-Division under Malda Highway Division in the District of Malda during the year 2026-2027.
2026_WBPWD_5018656_1
eNIT-05/2026-27/AE/GHSD/PW(R)D
Open Tender
CIVIL WORKS
Percentage
10 days
Gazole
Please refer Tender documents.
3 documents required · 3 mandatory
₹9,702
Yes
8 Sept 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairing Pot-holes with Bituminous Macadam (Grading - II, for compacted thickness of upto 75mm) Filling Pot Holes with Bituminous Macadam using Mobile Hot Mix plant (6-10 TPH) with approved crushed aggregates of specified grading premixed with bituminous binder @3.4% by wt. of the total mix, transported to site and laid in the pot hole prepared before hand by cutting the edges to get a firm vertical face and by removing all the failed and loose materials including dust and applying tack coat evenly on the sides and on the surface as per specification, rolling the filled depression with 8-10 tonne smooth wheeled roller to achieve the desired compaction, including the cost and carriage of stone aggregates and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of all operational staff, quality control except the cost of tack coat complete as per direction of Engineer-in-charge. Payment to be made on the basis of the loose net volume of the stone aggregates used in the work. | 7.41 | Cum | 8,652.82 | ₹64,117.4 |
| 2 | Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density (Reference to MoRT&H's specification 404). | 8.36 | Cum | 3,944.34 | ₹32,974.68 |
| 3 | Providing and applying primer coat with cationic bitumen emulsion SS1 grade conforming to IS:8887 on prepared porous granular surface including clearing of road surface and spraying primer using mechanical means (Reference to MORT&H's specification clause 502). | 76 | Sqm | 143.84 | ₹10,931.84 |
| 4 | Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503).
(i) On Granula Surface treated with primer: (with cationic bitumen emulsion RS-1 @ 0.275 Kg / Sq.m | 76 | Sqm | 30.42 | ₹2,311.92 |
| 5 | Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503).
On Bituminous Surface : (with cationic RS-1 @ 0.250 /Sqm) | 152 | Sqm | 27.82 | ₹4,228.64 |
| 6 | Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm.
Removal of all failed material,in the pavement courses and if necessary below the pavement,until the root causes of the failure is removed, the trimming of completed excavation to provide firm vertical faces; specified for the pavement layer; application of tack coat conforming to cl. 503 of MORT&H's specification ,on to the sides and base ofexcavation prior to placing hot bituminous material as per clause 510 and the compaction,trimming and finishing of the surfaces of all patches to form a smooth continuous surface, level with the surrounding road as per the requirement of clause 3004.2 of MORT&H's specification. | 760 | Sqm | 266.55 | ₹2,02,578 |
| 7 | Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). By Manual Means With Hot Bitumen Binder @ 6.80 kg / 10 sqm. Bitumen Own Supply | 874 | Sqm | 90.14 | ₹78,782.36 |
| 8 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201). (II) By mechanical means (A) In area of light jungle. | 0.3 | Hec | 50,633.31 | ₹15,189.99 |
| 9 | Add GST @18 % | 18 | Percentage | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
OID.pdf
Other Document • 0.01 MB
BOQ_5089885.xls
BOQ • 0.34 MB
Form2911.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .