| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC accept |
| 2 | L2₹2.1 LRejected-Finance | ₹2.1 L | L2 | Rejected-Finance reject |
| Sl No | Description | Qty | Unit | M.Kumarasamy L2 | S.Maheshwaran L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 2.83 | Cum | 250 ₹707.50 | 246.5 ₹697.60 |
| 2.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 3.25 | Cum | 6,500 ₹21,125 | 6,314 ₹20,520.50 |
| 3.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete | 3.96 | Cum | 6,500 ₹25,740 | 6,155 ₹24,373.80 |
| 4.00 | Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum | 23.61 | Sqm | 250 ₹5,902.50 | 185.2 ₹4,372.57 |
| 5.00 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 32.33 | Sqm | 325 ₹10,507.25 | 318.2 ₹10,287.41 |
| 6.00 | Painting two coats of newly plastered wall surface with ready mixed Plastic Emulsion Paint of First quality of approved colour over a Priming Coat including cost and conveyance of all materials to site and all labour charges etc complete | 32.01 | Sqm | 300 ₹9,603 | 249 ₹7,970.49 |
| 7.00 | Supply of Truss Materials GI post 65 mm dia | 25.6 | Rm | 300 ₹7,680 | 244.5 ₹6,259.20 |
| 8.00 | Roof purlin, Roof Rafter | 291.86 | Kg | 60 ₹17,511.60 | 58.5 ₹17,073.81 |
| 9.00 | store room Horizontal, Vertical | 108.24 | Kg | 60 ₹6,494.40 | 58.5 ₹6,332.04 |
| 10.00 | Labour Charge for Pipes & Trusses | 400.1 | Rm | 50 ₹20,005 | 44 ₹17,604.40 |
Tender Value
₹1.9 L
EMD Value
₹1,950
Closing Date
22 Aug 2025, 2:00 pmClosed
Block Development Officer(BP),Vedaranyam
Block Development Officer(BP),Vedaranyam
Construction of Segregation shed in Kuravapulam Panchayat SBM(G) -GF-2025-2026
2025_RDTN_593172_4
RD-NGP/498/2025-A2
Open Tender
Civil Works
Works
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1,950
2 Feb 2026
14 Aug 2025
22 Aug 2025
14 Aug 2025
22 Aug 2025
14 Aug 2025
14 Aug 2025 - 22 Aug 2025
Amount
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed Plastic Emulsion Paint of First quality of approved colour over a Priming Coat including cost and conveyance of all materials to site and all labour charges etc complete
Supply of Truss Materials GI post 65 mm dia
Roof purlin, Roof Rafter
store room Horizontal, Vertical
Labour Charge for Pipes & Trusses
Supplying and fixing colour coated galvanised sheet for roofing including all cost etc
Provision For Door Including all cost
Provision for Name Board & Photography Charges
Provision for Fencing arrangements for Sides including all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity
M.Kumarasamy (BID ID -1436499)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid