Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹17.7 LAccepted-AOC | ₹17.7 L | l1 | Accepted-AOC L1 |
| 2 | l2₹17.7 L+₹176 (<0.01%)Rejected-Finance | ₹17.7 L+₹176 (<0.01%) | l2 | Rejected-Finance L2 |
Tender Value
₹17.7 L
EMD Value
₹36,000
Closing Date
23 Mar 2026, 2:00 pmClosed
E.E.RED VIKASH BHAVAN HAPUR
E.E.RED VIKASH BHAVAN HAPUR
Vikaskhand garhmukteshwar mein uchch prathmik Vidyalay gadh mein 02 kaksha kaksh ka Nirman karya
2026_REDUP_1126602_1
42/EE/RED/Hapur/2025-26/Dt. 21/02/2026
Open Tender
Civil Works
Percentage
120 days
Vikaskhand garhmukteshwar mein uchch prathmik Vidy
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹36,000
Yes
18 Jul 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per DSR-2023 S.I No. 2.8.1 | 46.33 | cum | 188.95 | ₹8,754.05 |
| 2 | concrete with 40 mm gauge b/ballast, fine sand and cement in 10:5:1 in foundation and under floor as per PWD SOR si no 274 | 17.7 | cum | 3,990 | ₹70,623 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) as per DSR-2023 S.I No. 5.1.2 | 6.18 | cum | 6,566.05 | ₹40,578.19 |
| 4 | Centering and shuttering including stutting, propping etc. and removal of form. Foundation as per DSR-2023 S.I No. 5.9.1 | 10.95 | sqm | 284.65 | ₹3,116.92 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Above Plinth Lvl as per DSR-2023 S.I No. 5.2.2 | 2.97 | cum | 7,877.85 | ₹23,397.21 |
| 6 | Centering and shuttering including stutting, propping etc. and removal of form. Column as per DSR-2023 S.I No. 5.9.6 | 51.61 | sqm | 697.78 | ₹36,012.43 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) as per DSR-2023 S.I No. 6.1.2 | 16.18 | cum | 5,177.09 | ₹83,765.32 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering , shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) cum 10185.05 as per DSR 5.2.2 | 3.8 | cum | 7,877.85 | ₹29,935.83 |
| 9 | Earth filling in plinth in ordinary soil including with earth cartage upto 2 Km & all as per SI. No. 253, 261(b), 231(a). | 66.92 | cum | 200.45 | ₹13,414.11 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in super structure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:6 ( 1 cement : 6 coarse sand ) as per DSR-2023 S.I No. 6.4.2 | 28.1 | cum | 6,609.75 | ₹1,85,733.98 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
TWO.pdf
Tender Documents • 1.61 MB
BOQ_2100971.xls
BOQ • 0.27 MB
RAMNOME.pdf
PDF • 0.54 MB
CORRIGENDUM.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .