Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC FRIENDS COLONY STREET A DHANGU ROAD PATHANKOT 145001 PB | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L1 | Accepted-AOC Being a lowest | |
| 2 | L2₹17.2 L+₹5.2 L (43.1%)Rejected-Finance 99 MODEL TOWN PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L2 | Rejected-Finance Being not a lowest | |
| 3 | L3₹20.4 L+₹8.5 L (70.5%)Rejected-Finance | L3 | Rejected-Finance Being not a lowest | |
| 4 | L4₹22.4 L+₹10.4 L (87.2%)Rejected-Finance BALSUA P O JHAKOLARI PATHANKOT PATHANKOT PUNJAB 145001 | PATHANKOT | PUNJAB | 145001 | L4 | Rejected-Finance Being not a lowest | |
| 5 | L5₹25.9 L+₹13.9 L (115.6%)Rejected-Finance | L5 | Rejected-Finance Being not a lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
17 Jun 2020, 6:00 pmClosed
GE (WEST) PATHANKOT
GE (WEST) PATHANKOT
MANNING AND OPERATION THROUGH OUT SOURCING OF 121/10 DIV SUB STATION, RHPD DG SET INSTALLATION, 121 SIGNAL UNIT, 5471 ASC BN, NCSD, MANEKSHAW COLONY DG SET INSTALLATIONS UNDER GE (WEST) PATHANKOT
2020_MES_346457_1
GE/PKT-06/2020-21
Open Tender
Miscellaneous Works
Item Rate
335 days
GE (WEST) PATHANKOT
Please refer tender documents
9 documents required · 9 mandatory
₹500
GE (WEST) PATHANKOT
₹60,000
Yes
23 Jun 2020
21 May 2020
19 Jun 2020
21 May 2020
17 Jun 2020
5 Jun 2020
22 May 2020 - 30 May 2020
Amount
Maintenance & operation and routine maintenance/ day to day complaints under HT 11KV installation including control room and switch yard at 121/10 Div area sub station round the clock having accessories in sub stn as under:- (Note:- Contractor shall employ one qualified operator (diploma holder /ITI holder) and one helper to run and maintain the installation round the clock in two shifts starting from 0800 hrs with one operator and one helper in each shifts of 8 hrs durations of shifts is as under: (a) 1st shift - 1600 hrs to 2400 hrs. (b) IInd shift - 2400 hrs to 0800 hrs.)
(a) HT panel VCBs of 11 KV ,3 phase ,50 HZ ,630 amps ,25 KA incoming feeder -01 nos make: Kirloskar.
(b) All as per 1(a) but Outgoing feeder -03 nos.
( c ) All as per 1 but Local distribution transformers -07 nos.
(d) All as per 1 but HT OH Lines and UG cables.
(e) All as per 1 but LT OH Lines and UG cables.
(f) All as per 1 but LT panels, MCCBs and other Maintenance works.
Maintenance & operation of DG Set Installation including checking of oil level, cleaning of all types of filters, maint of control room and switch yard at RHPD oil filling area for one Shift (General) having accessories in installation as under:- (Note:- Contractor shall employ one qualified operator (diploma holder /ITI holder) and one helper to run and maintain the installation for one shift starting from 0800 hrs to 1600 hrs with one operator and one helper of 8 hrs durations of shift.)
(a) DG Set 200 KVA 01 No and DG Set 100 KVA 02 Nos
(b) All as per 2 but connected LT Panels
Maintenance & operation of DG Set Installation including checking of oil level, cleaning of all types of filters, maint of control room and switch yard at 121 signal unit for three Shifts having accessories in installation as under:- (Note:- Contractor shall employ one qualified operator (diploma holder /ITI holder) and one helper to run and maintain the installation for three shifts round the clock with one operator and one helper for general shifts of 8 hrs durations of shifts is as under: (a) Ist shift - 0000 hrs to 0800 hrs. (b) IInd shift - 0800 hrs to 1600 hrs. (c) III rd shift - 1600 hrs to 2400 hrs . (d) one helper (General shift) - 0800 hrs to 1600 hrs .
(a) DG Set 125 KVA 01 No
(b) All as per 3 but connected LT Panels
Maintenance & operation of DG Set Installation including checking of oil level, cleaning of all types of filters, maint of control room and switch yard at 5471 ASC tpt coy, NCSD and manekshaw colony areas for two Shifts having accessories in installation as under:- (Note:- Contractor shall employ one qualified operator (diploma holder /ITI holder) and one helper to run and maintain the installation for two shifts with one helper for night shifts of 8 hrs durations of shifts is as under: (a) Ist shift - 1600 hrs to 2400 hrs. (b) IInd shift - 0000 hrs to 0800 hrs.
(a) DG Set 105 KVA -01 No and DG set 7.5 KVA -02 Nos
(b) All as per 4 but connected LT Panels
Notes for ser item no 1 to 4 of sch 'A' Part -I (A) Item rate quoted by contractor for serial item no 1 to 3 schedule 'A' shall be include for following provisions:-
(i) The rate quoted by the contractor includes for providing 25 % of reliever for 3 shifts and 10 % of reliever for One /two shifts.
(ii) Employment of qualified operators with helpers for operating and maintaining the installation including daily examining the eqpts for its servicing /defects and minor repair for its smooth and trouble free functioning .
(iv) The qualified operator to be employed by the contractor shall have qualification certificate of Govt recongnised ITI/NCVT in trade of electrician. The operator having diploma in electrical engineering with two year experience or ITI in electrical trade with minimum experience of 03 years in operating and maintening HT panels and eqpts of 66 KV sub stn .Contractor shall submit attested copy certificate of technical qualification and experience certificate of staff employed and the original certificate shall be produced for verification on demand to the Engr-in-charge within 15 days of the commencement of work.
(v) Contractor should adhere all the labour laws and rates are deemed to be included in the quoted rates.
(vi) The contractor shall provide and maintain all installation charts displayed, daily records /log sheets and communication system (mobile phone etc) ,are deemed to be included in the quoted rates.
(vii) Contractor shall provide uniform to each operator/electrican and helper to maintain identiy of operating staff employed by the contractor.
(viii) Before commencement of work,the contractor has to take over all the panels/machineries along with signed inventory stating the conditon the same has to be return back to department without damage the equipment.
(ix) During currency of the contract ,if any machinery becomes UNSV due to normal circumstances, the contractor shall intimate the same within 02 hrs to the department.
(B) Provision of penality for non compliance of contract agreement listed here in before:-
(i) In case of non submission of original doucments of qualification of staff employed by contractor to engr-in-charge of verfication with in 15 days of commencement of work,recovery at the rate of 1/30th of the quoted amount per month /shift for operator shall be made accounting from the 16th day from the date of commencement mentioned in work order No: 1 Engr-in-charge /JE shall make requiste entries on daily basis in daily record register for non compliance of contract provisions.
(ii) In case of absence of electrican and helper from duty in any shift ,recovery shall be made as given below:
(a) Rs 300/- per shift for electrican/operators .
(b) Rs 250 per shift per helper .
(iii) It is also made clear that in case of any loss /damages to the Govt property occurs due to negligence /non performance of contractual obligations by the contractor ,or his operating staff employed ,it will be the responsibility of the contractor to make good loss/damages at his own cost.
(iv) In case of non wearing of the uniform by the operating staff lumpusum recovery of Rs 50 per person per shift shall be made.
(v) The contractor and staff employed shall have an authentic /valid license to operate and maintain plants of 66 KV capacity .
(vi) In case of contractor's failure in maintaining the installations clean and tidy ,a lump sum recovery of Rs 500/- per month per installation shall be made from the contractor.
PERFORMANCE SECURITY :- (Refer condition 19 of IAFW-2249) The performance security for an amount equivalent to 5% (Five percent) of the accepted contract sum shall be delivered by the successful bidder within 28 days from the date of intimation letter of acceptance and all provisions shall be applicable as per condition 19 of IAFW 2249
satpal and brothers
TRIVENI CONSTRUCTIONS
GANDOTRA CONSTRUCTION CO
M/S SALARIA BUILDERS
RD BUILDERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .