| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC C 9 53 IIND FLOOR SECTOR 08 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | L1 | Accepted-AOC Being lowest and reasonable | |
| 2 | L2₹4.0 Cr+₹41.7 L (11.8%)Rejected-Finance | L2 | Rejected-Finance Not being lowest | |
| 3 | L3₹4.0 Cr+₹50.1 L (14.1%)Rejected-Finance III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | L3 | Rejected-Finance Not being lowest | |
| 4 | L4₹4.1 Cr+₹58.2 L (16.4%)Rejected-Finance WZ 143 A 7A S 4 43 GALI NO 2 OLD MAHAVIR NAGAR NEW DELHI 110018 | WEST DELHI | DELHI | 110018 | L4 | Rejected-Finance Not being lowest | |
| 5 | L5₹4.2 Cr+₹62.3 L (17.6%)Rejected-Finance FARIDABAD | FARIDABAD | HARYANA | 121001 | L5 | Rejected-Finance Not being lowest |
| Sl No | Description | Qty | Unit | MB Enterprises L3 | CREATIVE BUILDERS L9 | M/s Ram Singh Agarwal L8 | L G BUILDERS L1 | M/s Puja Construction Company L2 | MD BUILDER L6 | M/S Sunil Steel Works L4 | ASSOCIATED CONSTRUCTION CO. L5 | Adhunik Builders L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of reinforced cement concrete in roofs, floors (including any type of floor finishing / treatments), beams, staircases, landing, chajjas, Kitchen slabs, shelves, column, parapet wall, chimney and similar suspended work or any type (reinforment cut as required to facilitiate demolition), removal of rubbish beyond MoD land, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 211.4 | Cubic Meter | 350 ₹73,990 | 318 ₹67,225.2 | 317 ₹67,013.8 | 300 ₹63,420 Lowest | 700 ₹1,47,980 | 700 ₹1,47,980 | 327 ₹69,127.8 | 325 ₹68,705 | 315 ₹66,591 |
| 2.00 | Dismantling of brick tiles or terracing tiles single layer on roof, removal of debris beyond MoD lands, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 1,415 | Square Meter | 36 ₹50,940 | 35 ₹49,525 | 37 ₹52,355 | 30 ₹42,450 Lowest | 44 ₹62,260 | 90 ₹1,27,350 | 35 ₹49,525 | 41 ₹58,015 | 35 ₹49,525 |
| 3.00 | Demolition of mud phuska on roof slabs, any thickness including any type of roof treatments and removal of rubbish beyond MoD land, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 293 | Cubic Meter | 250 ₹73,250 | 222 ₹65,046 | 285 ₹83,505 | 215 ₹62,995 Lowest | 679 ₹1,98,947 | 450 ₹1,31,850 | 268 ₹78,524 | 349 ₹1,02,257 | 228 ₹66,804 |
| 4.00 | Demolition of cement concrete (unreinforced) of any description and in any position not other specifically provided for and including sunken portion, removal of rubbish beyond MoD lands, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 129.34 | Cubic Meter | 355 ₹45,915.7 | 315 ₹40,742.1 | 391 ₹50,571.94 | 300 ₹38,802 | 150 ₹19,401 Lowest | 550 ₹71,137 | 378 ₹48,890.52 | 411 ₹53,158.74 | 324 ₹41,906.16 |
| 5.00 | Demolition of brick work or stone/boulder masonry built in cement or cement lime mortar incl all quoins, arches, pillars,roof parapet walls, tiles, including Plaster works of any thickness and half brick works etc but excluding ashlars facings dressed stone work and Precast concrete articles, removal of rubbish beyond MoD lands, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 445 | Cubic Meter | 265 ₹1,17,925 | 218 ₹97,010 | 252 ₹1,12,140 | 200 ₹89,000 | 180 ₹80,100 Lowest | 400 ₹1,78,000 | 238 ₹1,05,910 | 300 ₹1,33,500 | 218 ₹97,010 |
| 6.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tile to store and removal of rubbish beyond MoD land, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 2,044 | Square Meter | 24 ₹49,056 | 221 ₹4,51,724 | 27 ₹55,188 | 20 ₹40,880 | 14 ₹28,616 Lowest | 65 ₹1,32,860 | 24 ₹49,056 | 40 ₹81,760 | 35 ₹71,540 |
| 7.00 | Demolition of stone slabs and tiles laid, bedded and pointed in any mortar of any description or thickness in floors, aprons, staircases, kitchen slabs etc., removal of rubbish beyond MoD lands, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 14.2 | Ten Square Meter | 250 ₹3,550 | 219 ₹3,109.8 | 237 ₹3,365.4 | 200 ₹2,840 Lowest | 320 ₹4,544 | 600 ₹8,520 | 213 ₹3,024.6 | 300 ₹4,260 | 215 ₹3,053 |
| 8.00 | Dismantling of PVC water storage tanks exc 250 & n.exc 500 ltrs capacity and removing from site, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 5 | Each | 125 ₹625 | 119 ₹595 | 109 ₹545 | 100 ₹500 | 250 ₹1,250 | 400 ₹2,000 | 99 ₹495 Lowest | 200 ₹1,000 | 115 ₹575 |
| 9.00 | Taking down Chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each with shutters (without taking off shutters from the frames), iron mongeries or fittings, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 500 | Each | 60 ₹30,000 | 63 ₹31,500 | 57 ₹28,500 | 50 ₹25,000 Lowest | 50 ₹25,000 Lowest | 200 ₹1,00,000 | 51 ₹25,500 | 88 ₹44,000 | 65 ₹32,500 |
| 10.00 | Taking down Chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each, complete all as specified and directed.
Note: Work will be executed upto the height of 18 meter. | 24 | Each | 75 ₹1,800 | 72 ₹1,728 | 69 ₹1,656 | 65 ₹1,560 | 50 ₹1,200 Lowest | 250 ₹6,000 | 67 ₹1,608 | 69 ₹1,656 | 75 ₹1,800 |
Tender Value
₹4.1 Cr
EMD Value
₹4.9 L
Closing Date
2 Sept 2026, 6:00 pmClosed
HQ Chief Engineer Delhi Zone
HQ Chief Engineer Delhi Zone Delhi Cantt-10
ADDN/ALTN and UPGRADATION TO BLDG NEW NPG LINE OR QTRS, JCOs QTRS, JCOs QTRS AT OLD NPG LINE AND CIV QTRS, JCOs QTRS AT HAZIPUR LINE QTRS UNDER GE WEST DELHI CANTT-10
2026_MES_782802_1
CEDZ/TOKEN-21 OF 2026
Open Tender
Civil Works
Item Rate
365 days
Delhi Cantt-10
As per NIT
8 documents required · 8 mandatory
₹2,000
GE West
₹4.9 L
Yes
3 Oct 2026
5 Aug 2026
4 Sept 2026
5 Aug 2026
2 Sept 2026
27 Aug 2026
5 Aug 2026 - 12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of reinforced cement concrete in roofs, floors (including any type of floor finishing / treatments), beams, staircases, landing, chajjas, Kitchen slabs, shelves, column, parapet wall, chimney and similar suspended work or any type (reinforment cut as required to facilitiate demolition), removal of rubbish beyond MoD land, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 211.4 | Cubic Meter | - | - |
| 2 | Dismantling of brick tiles or terracing tiles single layer on roof, removal of debris beyond MoD lands, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 250 | Square Meter | 1 | ₹250 |
| 3 | Demolition of mud phuska on roof slabs, any thickness including any type of roof treatments and removal of rubbish beyond MoD land, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 293 | Cubic Meter | 2 | ₹586 |
| 4 | Demolition of cement concrete (unreinforced) of any description and in any position not other specifically provided for and including sunken portion, removal of rubbish beyond MoD lands, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 129.34 | Cubic Meter | 3 | ₹388.02 |
| 5 | Demolition of brick work or stone/boulder masonry built in cement or cement lime mortar incl all quoins, arches, pillars,roof parapet walls, tiles, including Plaster works of any thickness and half brick works etc but excluding ashlars facings dressed stone work and Precast concrete articles, removal of rubbish beyond MoD lands, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 445 | Cubic Meter | 4 | ₹1,780 |
| 6 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tile to store and removal of rubbish beyond MoD land, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 2,044 | Square Meter | 5 | ₹10,220 |
| 7 | Demolition of stone slabs and tiles laid, bedded and pointed in any mortar of any description or thickness in floors, aprons, staircases, kitchen slabs etc., removal of rubbish beyond MoD lands, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 14.2 | Ten Square Meter | 6 | ₹85.2 |
| 8 | Dismantling of PVC water storage tanks exc 250 & n.exc 500 ltrs capacity and removing from site, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 5 | Each | 7 | ₹35 |
| 9 | Taking down Chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each with shutters (without taking off shutters from the frames), iron mongeries or fittings, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 500 | Each | 8 | ₹4,000 |
| 10 | Taking down Chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each, complete all as specified and directed.
Note: Up to the height of 4 storey building. | 24 | Each | 9 | ₹216 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
5.0 Particular Specification.pdf
Tender Documents • 0.54 MB
6.0 List Of Materials Appendix -'A' & 'B'.pdf
Tender Documents • 0.11 MB
7.0 Appendix -'C'.pdf
Tender Documents • 0.12 MB
8.1 List of Makes Appx D.pdf
Tender Documents • 0.23 MB
8.2 List of Makes Appx E.pdf
Tender Documents • 0.20 MB
9.0 Appendix F.pdf
Tender Documents • 0.04 MB
10.0 Appendix G & H.pdf
Tender Documents • 0.12 MB
2.1 Credit schedule.pdf
Tender Documents • 0.04 MB
2.2 General Summary of Sch.pdf
Tender Documents • 0.01 MB
2.3 Sch. B. C.pdf
Tender Documents • 0.14 MB
3.0 Min Wages.pdf
Tender Documents • 0.11 MB
4.0 Special Condition.pdf
Tender Documents • 0.22 MB
1.1 Common pages.pdf
Tender Documents • 0.51 MB
BOQ_877030.xls
BOQ • 0.66 MB
03Amdt83229.pdf
PDF • 0.90 MB
2amdt83229.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .