Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.2 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹62.7 Cr+₹1.0 Cr (1.70%)Rejected-Finance | L2 | Rejected-Finance Second Lowest |
Tender Value
₹58.2 Cr
EMD Value
₹1.2 Cr
Closing Date
27 Sept 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL CHIEF ENGINEER
OFFICE OF THE ACE, WR ZONE, UDAIPUR
Rehabilitation work of distribution system including strengthening of structures of shri Hari Dev Joshi Canal RD 26 Km to tail of Mahi Project, Banswara. (CMBA 22-23/Package-III)
2022_WRDAS_291810_1
ACE E-NIT No. 02 of 2022-23 Item No 3
Open Tender
Civil Works
Percentage
913 days
BANSWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
EXECUTIVE ENGINEER
₹1.2 Cr
Yes
OFFICE OF THE ACE, WR ZONE, UDAIPUR
4 Oct 2023
12 Aug 2022
28 Sept 2022
12 Aug 2022
27 Sept 2022
12 Aug 2022
22 Aug 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum | 16,745.06 | Cum | 115 | ₹19,25,681.9 |
| 2 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock | 16,745.06 | Cum | 155 | ₹25,95,484.3 |
| 3 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting | 52.64 | Cum | 229 | ₹12,054.56 |
| 4 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite & other hard rock requiring nominal blasting | 52.64 | Cum | 321 | ₹16,897.44 |
| 5 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 477.84 | Cum | 444 | ₹2,12,160.96 |
| 6 | Excavation with line drilling, controlled blasting near structures, populated area (situated within 50m) including dewatering, loading, unloading, disposal & dressing within initial lead of 50m and lift upto 1.5m complete in all respect in dry or moist and also including compensation of damages if any , in : Phylite and other hard rock requiring nominal blasting | 3,816.63 | Cum | 517 | ₹19,73,197.71 |
| 7 | Loading , Unloading and Disposal of land slide soil / earth/ sand/ pebbles / malba/ debris / rubbish / stone pebbles / rock mass including breaking of big boulders (if required) within initial lead of 50 m and lift up to 1.50 m. | 840 | Cum | 180 | ₹1,51,200 |
| 8 | (ii)Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 15 cms but upto 30cms having Lined section | 70,874.58 | Sqm | 28 | ₹19,84,488.24 |
| 9 | Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 30cm. | 5,490.37 | Cum | 90 | ₹4,94,133.3 |
| 10 | Add extra over item No. 1 c for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. | 79.64 | Cum | 28.75 | ₹2,289.65 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_518072.xls
BOQ Document • 0.31 MB
103302835.pdf
Tender Document • 0.60 MB
Technicalbid26totail.pdf
Tender Document • 1.57 MB
Financialbid26totail.pdf
Tender Document • 6.03 MB
103302839.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .