| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.3 LAccepted-AOC | ₹48.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹48.7 LRejected-AOC | ₹48.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MD. IMDAD HUSSAIN L1 | Kishor Kalita L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and driving timber piles of 25cm to 30cm diameter, dressed to heart wood including making length in every 30 cm interval, coal tarring two (2) coats with best tar applied hot (Rate inclusive of the cost of the required quantity of tar.) Using Sal Timber a) Mechanically with Rod monkey and crab winch i) Portion of pile actually driven underground. | 204 | RM | 8,504.38 ₹17.3 L | 8,650 ₹17.6 L |
| 2.00 | Supplying and driving timber piles of 25cm to 30cm diameter, dressed to heart wood including making length in every 30 cm interval, coal tarring two (2) coats with best tar applied hot (Rate inclusive of the cost of the required quantity of tar.) Using Sal Timber a) Mechanically with Rod monkey and crab winch ii) Portion of pile remaining above rground. | 131.2 | RM | 8,388.22 ₹11.0 L | 8,400 ₹11.0 L |
| 3.00 | Supplying, fitting and fixing timber beam and bearing beam rectangular in size fitted with M.S. etc. supplying spikes etc. as necessary and coal tarring two (2) coats with best tar applied hot as directed (Rate inclusive of cost of the required quantity of tar) Using Sal Timber | 1.3 | Cum | 39,313.27 ₹51,185.88 | 39,413.27 ₹51,316.08 |
| 4.00 | Labour for fitting and fixing RSJ beam, CI saddle etc. in position including necessary scaffolding, cutting them to required size, drilling holes and supplying and fixing ncessary bolts and nuts, painting two coats complete (Tar-Steel paints to be supplied by the contractor at his own costs) including all lead and lifts from PWD Godown. | 103.43 | Qntl | 896.09 ₹92,682.59 | 896.09 ₹92,682.59 |
| 5.00 | Wood work including supplying , fitting and fixing complete with necessary M.S. bolts, nuts, nails, screw etc. and coal tarring two (2) coats with best tar applied hot (Rate is inclusive of the cost of the required quantity of tar.) Using Sal Wood a) Underssed in floor planks, collars, bracing, standards, wheel guards,
struts and railings, runner belts, rail, posts etc. | 28.4 | Cum | 39,433.61 ₹11.2 L | 39,433.61 ₹11.2 L |
| 6.00 | Wood work including supplying , fitting and fixing complete with necessary M.S. bolts, nuts, nails, screw etc. and coal tarring two (2) coats with best tar applied hot (Rate is inclusive of the cost of the required quantity of tar.) Using Sal Wood b) In track way planks (alternate nailing to be done with decking in a
seggragate way.) | 3.71 | Cum | 46,477.35 ₹1.7 L | 46,477.35 ₹1.7 L |
| 7.00 | Wood work including supplying , fitting and fixing complete with necessary M.S. bolts, nuts, nails, screw etc. and coal tarring two (2) coats with best tar applied hot (Rate is inclusive of the cost of the required quantity of tar.) Using Azar/ Nahar/ Nageswar/ Zarul Wood b) Underssed in floor planks, collars, bracing, standards, wheel guards, struts and railings, runner belts, rail, posts etc. | 3.08 | Cum | 32,308.62 ₹99,510.55 | 32,308.62 ₹99,510.55 |
| 8.00 | Supplying fitting and fixing "U" shaped flat iron strap making 0.5m x 0.3m size from 150mm x 12mm size MS flat including providing 10 bolts holes and fitting with 0.35m long 20mm dia MS bolts including fitting tightly with bearing beam, pile and RSJ beams etc. complete as directed. | 28 | Each | 1,797.04 ₹50,317.12 | 1,797.04 ₹50,317.12 |
| 9.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Private Land | 1,034.75 | Cum | 258.21 ₹2.7 L | 265 ₹2.7 L |
| 10.00 | Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or Bethua) 75mm dia and closely packed & driven including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing brush wood as per drawing and technical specifications Clause 1302.5
Driven at least 900 mm below ground and 1800 mm above ground | 50 | RM | 1,048.75 ₹52,437.50 | 1,048.75 ₹52,437.50 |
Tender Value
₹48.3 L
EMD Value
₹96,600
Closing Date
6 Sept 2025, 2:00 pmClosed
Executive Engineer
O/o the EE, PWRD, NKTRD
Construction of SPT Bridge No 2/2 on Akadi to Dakhin Singra Road over river Borolia under SOPD-G for the year 2024-25 Pkg No NKTRD(R)/ SOPD(G)/ 2025-26/18
2025_PWD_47045_1
Tech/2083 dated 18/08/2025
Open Tender
Civil Works - Bridges
Rangia LAC
please refer tender
6 documents required · 6 mandatory
₹970
₹96,600
Rangia
13 Apr 2026
28 Aug 2025
8 Sept 2025
28 Aug 2025
6 Sept 2025
28 Aug 2025
28 Aug 2025 - 6 Sept 2025
28 Aug 2025
stage.html
html • 0.04 MB
technical_75008.pdf
techsummary_75008.pdf
finance_75008.pdf
BOQ Comparative Chart
xlsx
finsummary_75008.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
SBD_SOPD_G_2025_26_18.pdf
Tender Documents • 6.57 MB
FOB_SOPD_G_2025_26_18.pdf
Tender Documents • 0.12 MB
BOQ_75008.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid