Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance AT NABA KAJORA COLLIERY P O KAJORA GRAM DIST PASCHIM BARDHAMAN WEST BENGAL 713338 | KAJORA GRAM | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 LAdmitted-Finance | ₹3.8 L | L2 | Admitted-Finance |
| 3 | L3₹3.9 LAdmitted-Finance | ₹3.9 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BINOY KUMAR MISHRA L3 | LAXMI ENTERPRISE L2 | RITA ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Debris cleaning | 138.12 | cum | 550.75 ₹76,069.59 | 530 ₹73,203.6 | 520 ₹71,822.4 |
| 2.00 | Recess cutting at floor in hard stone by hand | 0.96 | cum | 5,640 ₹5,414.4 | 5,500 ₹5,280 | 5,400 ₹5,184 |
| 3.00 | Recess cutting at roof and both side in coal by hand | 2.9 | cum | 1,611.44 ₹4,673.18 | 1,550 ₹4,495 | 1,450 ₹4,205 |
| 4.00 | K.B. brick work with cement mortor (1:6) | 13.98 | cum | 7,346.74 ₹1,02,707.43 | 7,200 ₹1,00,656 | 7,000 ₹97,860 |
| 5.00 | 12 mm thick plastering with cement mortor (1:6) | 156.13 | sqm | 450 ₹70,258.5 | 450 ₹70,258.5 | 430 ₹67,135.9 |
| 6.00 | 20 mm thick plastering with cement mortor (1:6) | 98.38 | sqm | 465 ₹45,746.7 | 450 ₹44,271 | 440 ₹43,287.2 |
| 7.00 | No of Tubs required for loading of materials at surface | 43 | Tubs | 165 ₹7,095 | 160 ₹6,880 | 155 ₹6,665 |
| 8.00 | No of Tubs required for unloading of materials at underground | 43 | Tubs | 179 ₹7,697 | 170 ₹7,310 | 165 ₹7,095 |
| 9.00 | Extra Carriage of materials manually in UG for item no 4 (Avg 451-500 ft) | 13.98 | Cum | 540 ₹7,549.2 | 510 ₹7,129.8 | 500 ₹6,990 |
Tender Value
₹3.4 L
EMD Value
₹4,300
Closing Date
22 Dec 2025, 5:00 pmClosed
General Manager, Kajora Area
OFFICE OF THE GENERAL MANAGER KAJORA AREA PIN 713338
Const. of one no. Ventilation stoppings and repairing of 06 no. Ventilation stoppings at Lower Kajora (R-VIIIA) Seam, No.10 pit of Khas Kajora Colliery.
2025_ECL_349100_1
GM/KAJ/PCD/25-26/5052 Date 05.12.2025
Open Tender
Civil Works - Others
90 days
Kajora
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,300
Yes
2 Feb 2026
11 Dec 2025
23 Dec 2025
11 Dec 2025
22 Dec 2025
11 Dec 2025
11 Dec 2025 - 18 Dec 2025
Item Description/ Heading
Debris cleaning
Recess cutting at floor in hard stone by hand
Recess cutting at roof and both side in coal by hand
K.B. brick work with cement mortor (1:6)
12 mm thick plastering with cement mortor (1:6)
20 mm thick plastering with cement mortor (1:6)
No of Tubs required for loading of materials at surface
No of Tubs required for unloading of materials at underground
Extra Carriage of materials manually in UG for item no 4 (Avg 451-500 ft)
Extra Carriage of materials manually in UG for item no 5 (Avg 451-500 ft)
Extra Carriage of materials manually in UG for item no 6 (Avg 451-500 ft)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 1.20 MB
Tendernotice_3.pdf
PDF • 0.10 MB
Tendernotice_4.pdf
PDF • 0.11 MB
BOQ_361910.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid