GEMC-511687794647024
Awarded to S K ENGINEERING WORKS
₹8.4 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Repl of main rails and raising of rails | - | HSN not specified by seller | 55 Meter | 160.43 | 8,823.65 |
| Tightening, repl. of all bolts, clits | - | HSN not specified by seller | 189 Meter | 40.11 | 7,580.79 |
| Repl,Re fixing of bushes | - | HSN not specified by seller | 9 Job | 5,797.46 | 52,177.14 |
| Repl of rack pinion | - | HSN not specified by seller | 1 No | 3,450.52 | 3,450.52 |
| OH of reduction gear box | - | HSN not specified by seller | 1 Job | 9,250.41 | 9,250.41 |
| Replacement of sector gear | - | HSN not specified by seller | 1 Job | 13,961.3 | 13,961.3 |
| Alignment, grouting of tippling base rollers | - | HSN not specified by seller | 3 Job | 4,701.17 | 14,103.51 |
| Repl,repairing of hopper grill | - | HSN not specified by seller | 6 Nos | 2,795.42 | 16,772.52 |
| Repl,repairing of Outboard Stool | - | HSN not specified by seller | 1 Job | 13,467.85 | 13,467.85 |
| Repl of Wooden block | - | HSN not specified by seller | 16 Nos | 474.01 | 7,584.16 |
| Matching of teeth of sector gear | - | HSN not specified by seller | 4 Job | 3,866.19 | 15,464.76 |
| Repl of top stop locking gears assly | - | HSN not specified by seller | 1 Job | 21,516.23 | 21,516.23 |
| Side beam fixing of tippler | - | HSN not specified by seller | 1 Job | 13,340.23 | 13,340.23 |
| Alignment of motors of wagon tippler | - | HSN not specified by seller | 3 Job | 1,440.25 | 4,320.75 |
| Servicing of spray line valve Size 4 Inch | - | HSN not specified by seller | 3 Job | 487.38 | 1,462.14 |
| Servicing of spray line valve size 3 Inch | - | HSN not specified by seller | 4 Job | 377.99 | 1,511.96 |
| Servicing of spray line valve Size 2 Inch | - | HSN not specified by seller | 1 Job | 256.45 | 256.45 |
| OH of overhead spray pumps | - | HSN not specified by seller | 1 Job | 4,301.3 | 4,301.3 |
| Servicing of spray nozzles | - | HSN not specified by seller | 3 Job | 3,009.33 | 9,027.99 |
| Lifting, proper fixing of VF tray | - | HSN not specified by seller | 3 Job | 3,871.05 | 11,613.15 |
| Changing, fixing of side packing | - | HSN not specified by seller | 2 Job | 1,463.34 | 2,926.68 |
| To provide the patches | - | HSN not specified by seller | 30 Job | 213.91 | 6,417.3 |
| Removal of foreign | - | HSN not specified by seller | 3 Job | 1,074.41 | 3,223.23 |
| Fillings oil in gear box | - | HSN not specified by seller | 6 Job | 1,509.53 | 9,057.18 |
| Servocoating,Tightening, repl of damaged bolts | - | HSN not specified by seller | 24 Job | 1,806.08 | 43,345.92 |
| Greasing of all the nipple point | - | HSN not specified by seller | 25 Job | 407.16 | 10,179 |
| Repl of break shoe liner | - | HSN not specified by seller | 4 Job | 922.49 | 3,689.96 |
| Repl of main Rail Beam of wagon Tippler | - | HSN not specified by seller | 1 Job | 50,358.88 | 50,358.88 |
| Work on central platform | - | HSN not specified by seller | 1 Job | 75,919.96 | 75,919.96 |
| Repairing of Rollers of coal spill plates | - | HSN not specified by seller | 1 Job | 13,493.37 | 13,493.37 |
| Fab, erection of back support of VF mouth chute | - | HSN not specified by seller | 1 Job | 15,203.44 | 15,203.44 |
| Fab., Installing of VF tray supports | - | HSN not specified by seller | 1 Job | 9,305.1 | 9,305.1 |
| Repl of coal spill plate | - | HSN not specified by seller | 1 Job | 12,045.83 | 12,045.83 |
| Repairing of pit platform of main rail beam | - | HSN not specified by seller | 1 Job | 12,045.83 | 12,045.83 |
| Repl of damaged beam of VF | - | HSN not specified by seller | 1 Job | 17,154.16 | 17,154.16 |
| Repairing of counter balance beam | - | HSN not specified by seller | 1 Job | 24,637.37 | 24,637.37 |
| Repairing of damaged split spur gear | - | HSN not specified by seller | 1 Job | 11,825.84 | 11,825.84 |
| Fab., of mouth piece of VF | - | HSN not specified by seller | 1 Job | 11,038.26 | 11,038.26 |
| Erection of new fabricated mouth piece of VF | - | HSN not specified by seller | 1 Job | 9,657.57 | 9,657.57 |
| OH of hoisting system | - | HSN not specified by seller | 1 Job | 6,368.7 | 6,368.7 |
| Provision of hopper liners, in coal hopper of VF | - | HSN not specified by seller | 1 MT | 9,471.61 | 9,471.61 |
| Fab. erection of coal hopper partition stool | - | HSN not specified by seller | 1 Job | 4,928.45 | 4,928.45 |
| Raising and re-fixing of mouth piece of coal liner chute of VF | - | HSN not specified by seller | 6 Job | 5,925.08 | 35,550.48 |
| Repl of back,side plate of mouth piece | - | HSN not specified by seller | 2 Job | 5,221.36 | 10,442.72 |
| To attend the coal leakage from top mouth piece | - | HSN not specified by seller | 9 Job | 527.48 | 4,747.32 |
| Re-fixing,repositioning of side and back supports | - | HSN not specified by seller | 6 Job | 465.5 | 2,793 |
| Repairing,reposition of side guards of mouth piece | - | HSN not specified by seller | 4 Job | 986.9 | 3,947.6 |
| Repl of buffer block and buffer pads of counter balance beam | - | HSN not specified by seller | 2 Job | 3,111.42 | 6,222.84 |
| Repl of brake drum of thruster brake assly | - | HSN not specified by seller | 2 Job | 10,644.47 | 21,288.94 |
| Repl of input,output,intermediate pinion of gear box | - | HSN not specified by seller | 1 Job | 5,911.71 | 5,911.71 |
| Repairing of wagon tippler plate form by cutting and welding | - | HSN not specified by seller | 6 Running Meter | 1,406.22 | 8,437.32 |
| Inserting the side beam pins in bracket | - | HSN not specified by seller | 1 Job | 49,557.24 | 49,557.24 |
| Cutting, fabricated and installation of resting outer rail beam bottom plate | - | HSN not specified by seller | 1 Job | 95,545.02 | 95,545.02 |