Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | ₹1.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | - | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | N.K. ENTERPRISE L2 | K R ENTERPRISE L1 |
|---|---|---|---|---|---|
| 1.00Part A :Heightening of T6 Belt Conveyor along -2XBL in RV seam including necessary fabrication jobs and required alignment at MIC,JPC | |||||
| 1.01 | Transportation of 60 pairs of ISMC 180 channels from surface to installation site at UG with the help of MUV (60 nos. structure of 3 mtr. length each required for heightening) | 1 | WORK | 36,760.7 ₹36,760.70 | 35,690 ₹35,690 |
| 1.02 | Heightening of existing T6 belt conveyor with the help of Chain Pully Block between 6D and 8D(60 pairs of structure of 3 mtr. Length each ) Fabrication of existing structure of T6 belt through gas cutting, adding channels vertically and aligning it | 1 | WORK | 1,44,465.74 ₹1.4 L | 1,40,258 ₹1.4 L |
| 1.03 | Supply of D.A(2 cylinder)(12.4 cu. Mtr) @ 6.2Cu. Mtr/cyl..) | 1 | WORK | 7,107 ₹7,107 | 6,900 ₹6,900 |
| 1.04 | Supply of Oxygen(4 cylinder)(28.4 Cu.mtr)@ 7.1Cu.mtr/cyl.) | 1 | WORK | 1,648 ₹1,648 | 1,600 ₹1,600 |
| 1.05 | M.S. Bolt & Nut 5/8''X2'' | 20 | KG | 128.75 ₹2,575 | 125 ₹2,500 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹2.2 L
EMD Value
₹2,800
Closing Date
6 Mar 2026, 11:00 amClosed
Area Engineer EnM
Office of the General Mnager, Jhanjra Area, ECL
Heightening of T6 Belt Conveyor along -2XBL in RV seam including necessary fabrication jobs and required alignment at MIC,JPC
2026_ECL_354148_1
ECL/GM/JNR/EnM/A2/25-26/128 dated 21.02.2026
Open Tender
Miscellaneous Works
15 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,800
12 Mar 2026
23 Feb 2026
7 Mar 2026
23 Feb 2026
6 Mar 2026
24 Feb 2026
23 Feb 2026 - 2 Mar 2026
Part A :Heightening of T6 Belt Conveyor along -2XBL in RV seam including necessary fabrication jobs and required alignment at MIC,JPC
Transportation of 60 pairs of ISMC 180 channels from surface to installation site at UG with the help of MUV (60 nos. structure of 3 mtr. length each required for heightening)
Heightening of existing T6 belt conveyor with the help of Chain Pully Block between 6D and 8D(60 pairs of structure of 3 mtr. Length each ) Fabrication of existing structure of T6 belt through gas cutting, adding channels vertically and aligning it
Supply of D.A(2 cylinder)(12.4 cu. Mtr) @ 6.2Cu. Mtr/cyl..)
Supply of Oxygen(4 cylinder)(28.4 Cu.mtr)@ 7.1Cu.mtr/cyl.)
M.S. Bolt & Nut 5/8''X2''
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_366971.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid