| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹15.1 L+₹59,437.50 (4.11%)Rejected-AOC 1551 CHIRANJEEV COLONY AMBALA ROAD KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹16.9 L+₹2.4 L (16.9%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder | |
| 4 | Rejected-Technical 78 PARASI NEAR PRIMARY SCHOOL PARASI RENUSAGAR RENUSAGAR RENUSAGAR SONBHADRA UTTAR PRADESH 231218 | SONBHADRA | UTTAR PRADESH | 231218 | - | Rejected-Technical EXPERIENCE NOT AS PER PQC |
Tender Value
₹15.7 L
EMD Value
₹31,000
Closing Date
20 Nov 2020, 6:00 pmClosed
SE OMC-I DTPS ANPARA
Office of SE OMC-I DTPS ANPARA
aintenance work of WTP and Misc pumps CW Chlorination PT Chlorination and Chemical House Raw Water Pumps chiller water pumps and condensate water pumps installed in Service Water Pump House and AC Plant1 and AC Plant2 of 2X500 MW DTPS Anpara
2020_RVUNL_514286_1
13/DTPS /OMC-I/CAD / 2020-21
Open Tender
Miscellaneous Works
Item Rate
365 days
DTPS Anpara Sonebhadra UP
As per PQC
3 documents required · 3 mandatory
₹590
Dy GM (F) Construction Unit CFA BO DTPS
₹31,000
2 Jan 2021
23 Sept 2020
21 Nov 2020
23 Sept 2020
20 Nov 2020
23 Sept 2020
Amount
Maintenance/servicing of CW Chlorinator
Maintenance/servicing of PT Chlorinator
Maintenance/servicing of CW evaporator / PT evaporator
Maintenance/servicing/cleaning of Cl2 absorption tower of CW Chlorination system / PT Chlorination System
Maintenance/servicing of CW Ejector Assembly with associated NRV & valves
Maintenance/servicing of PT Ejector Assembly with associated NRV & valves
Maintenance/servicing of complete tonner manifold of CW Chlorination with associated valves &expansion cylinders
Maintenance/servicing of complete tonner manifold of PT Chlorination with associated valves &expansion cylinders
Maintenance /servicing of CW Chlorine dispenser lines of one chlorinator & evaporator with all associated valves & filters
Maintenance /servicing of PT Chlorine dispenser lines of one chlorinator & evaporator with all associated valves & filters
Maintenance/servicing of Chlorine suction duct network at CW Chlorination/PT Chlorination
Maintenance of CW Booster pumps
Maintenance of PT Booster pumps
Maintenance of Caustic recirculation pump at CW Chlorination/ PT Chlorination
Maintenance/servicing of valves SIZE-200 mm
Maintenance/servicing of valves SIZE-150 mm
Maintenance/servicing of valves SIZE-100 mm
Maintenance/servicing of valves SIZE-80 mm
Maintenance/servicing of valves SIZE-65 mm
Maintenance/servicing of valves SIZE-50 mm
Maintenance/servicing of NRV size-200 mm
Maintenance/servicing of NRV size-150 mm
Maintenance/servicing of NRV size-100 mm
Maintenance/servicing of NRV size-80 mm
Maintenance/servicing of NRV size-65 mm
Maintenance/servicing of NRV size-50 mm
Repair of MS pipeline work to arrest leakages of water
Repair of underground HDPE CW pipe line to arrest leakage of chlorine solution
Repair of underground HDPE PT pipe line to arrest leakage of chlorine solution
Maintenance /servicing of CW forebay chlorine solution diffuser with associated valves
Maintenance /servicing of PT chlorine solution diffuser with associated valves
Replacement of CW chlorinator PVC vacuum pipeline with associated bends, tees ,unions ,flanges etc
Replacement of PT chlorinator PVC vacuum pipeline with associated bends, tees ,unions ,flanges etc
Fabrication of lead gaskets size- 3 inch
Fabrication of lead gaskets size- 2 inch
Fabrication of lead gaskets size- 1 inch
Repairing of dispenser pipeline / flanges using appropriate filler material
Refilling with maintenance/servicing of BA set
Painting of dispenser pipeline with associated valves, flanges etc
Painting of absorption tower with associated valves, pumps, blowers etc. at CW Chlorination/ PT Chlorination
Painting of water lines with associated pumps, valves etc.
Maintenance of Emergency shower with associated pipe line & valve connected to the source at CW Chlorination/ PT Chlorination
Maintenance of Respiratory Air supply lines with associated valves and connection
Complete Overhauling/Servicing of Acid unloading pumps
Complete Overhauling/Servicing of Acid Dosing pumps
Complete Overhauling/Servicing of Dispersant Dosing pumps
Complete Overhauling/Servicing of Scale inhibitor Dosing pumps
Complete Overhauling/Servicing of Acid dilution pumps
Complete Overhauling/Servicing of CMB pumps
Complete Overhauling/Servicing of Coal settling pumps
Complete Overhauling/Servicing of Filter back washed water recirculation pumps
Complete Overhauling/Servicing of Sludge pumps
Complete Overhauling/Servicing of Waste service water pumps
Complete Overhauling/Servicing of Lime Dosing pumps( Cap- 15 cum/hr @ 8 MWC)
Complete Overhauling/Servicing of Lime Dosing pumps( Cap- 36 cum/hr@ 15 MWC)
Complete Overhauling/Servicing of Alum Dosing pumps([email protected]/Cm2)
Complete Overhauling/Servicing of Alum Dosing pumps([email protected]/Cm2)
Complete Overhauling/Servicing of Potable water pumps
Blower (Cap- 1500 cum/hr , 0.4Kg/cm2) for filter bed.
Blower (Cap- 400 cum/hr, 0.4Kg/cm2) for sludge pit.
Complete Overhauling/Servicing of Agitator for acid measuring tank with reduction gear
Complete Overhauling/Servicing of Agitator for dispersant measuring tank with reduction gear
Complete Overhauling/Servicing of Agitator for Scale inhibitor measuring tank with reduction gear
Complete Overhauling/Servicing of Agitator for lime preparation tank with reduction gear
Complete Overhauling/Servicing of Agitator for alum tank with reduction gear
Complete Overhauling/Servicing of Agitator for lime slaking tank with reduction gear
Complete Overhauling/Servicing of Agitator for Flash mixture with reduction gear
Complete Overhauling/Servicing of Agitator for Flocculator with reduction gear
Complete Overhauling/Servicing of Agitator for Coagulation tank with reduction gear
Complete Overhauling/Servicing of Clariflocculator oil pump drive
Complete Overhauling/Servicing of Clarifier Scrapper and turbine drive
Replacement of ratchet plate
Replacement of worn out gland cover of stuffing box holding bolts
Replacement of worn out rubber spacer of coupling
Replacement of worn out bearing
Replacement of sealing ring of stuffing box
Removal of jamming of impeller because of ingress of foreign materials
Replacement of damaged bearing of pumps
Replacement of worn-out pump casing gasket/ O-ring.
Replacement of pump Diaphragm
Replacement of Venire pump
Arresting of pump leakage either from pump oil side or from chemical side
Replacement of pump coupling hubs & associated works
Replacement of damaged bearings
Replacement of damaged / worn Out Parts
Replacement of damaged bearings
Replacement of damaged / worn Out Parts
Replacement of oil pump drive bearings of Clariflocculator
Replacement of damaged / worn Out Parts of turbine drive or oil drive pumps
Providing new foundation bolts, casing bolts/studs etc. of equipment after taking out broken studs/ bolts by way of drilling tapping etc. on channel foundation.
Replacement of following valves with new/repaired valves by dismantling and of old valves from system and fitting of new/repaired Butterfly valves( 50mm to 800 mm)
Replacement of following valves with new/repaired valves by dismantling and of old valves from system and fitting of new/repaired Gate valve ( 25 mm to 450 mm)
Replacement of following valves with new/repaired valves by dismantling and of old valves from system and fitting of new/repaired Check valves( 25 mm to 450 mm)
Replacement of following valves with new/repaired valves by dismantling and of old valves from system and fitting of new/repaired Diaphragm valves( 25 mm to 80 mm)
Re- visioning/ overhauling /servicing of Butterfly valves( 50mm to 800 mm)
Re- visioning/ overhauling /servicing of Gate valve ( 25 mm to 450 mm)
Re- visioning/ overhauling /servicing of Check valves( 25 mm to 450 mm)
Re- visioning/ overhauling /servicing of Diaphragm valves( 25 mm to 80 mm)
Re- visioning/ overhauling /servicing of gates SIZE-1050X1050
Re- visioning/ overhauling /servicing of gates SIZE-900X900
Re- visioning/ overhauling /servicing of gates SIZE-600X600
Re- visioning/ overhauling /servicing of gates SIZE-300X300
Re- visioning/ overhauling /servicing of gates SIZE-200X200
Attending the leakage from acid/lime/ alum/ dispersant/scale inhibitor/ chlorine transfer pipe line joints
Removal of filter media by collection, lifting from bed of filter stacking at ground floor on clean surface, cleaning by water, sieving with different size of sieves, separation of filter media in different size, refilling as per instruction of Engineer of contract in filter in different thickness after repairing of filter’s internal, replacement of damaged parts & necessary repair if any complete in all respect.
Solid chemicals
Liquid chemicals
Complete overhauling/ servicing of the Raw Water pumps(AHP)
Complete overhauling/ servicing of the Raw Water pumps(PT)
Complete overhauling/ servicing of the DM- Make pumps
Complete overhauling/ servicing of the Boiler fill Pumps
Complete overhauling/ servicing of the Service Water Pumps
Complete overhauling/ servicing of the APH Wash Water Pump
Complete overhauling/ servicing of the Lubricating Water Pump for Raw Water Pump (PT & AHP)
Complete overhauling/ servicing of the Condensate Transfer Pump
Complete overhauling/ servicing of the DM Transfer Pumps
Complete overhauling/ servicing of the Chilled Water pumps
Complete overhauling/ servicing of the Condensate water pumps
Overhauling of Raw Water pumps(AHP)( fitted with butterfly discharge valve)
Overhauling of Raw Water pumps(PT)( fitted with butterfly discharge valve)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Raw Water pumps(AHP)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Raw Water pumps(PT)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM- Make pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Boiler fill Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Service Water Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of APH Wash Water Pump
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Condensate Transfer Pump
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM Transfer Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Chilled Water pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Condensate water pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of the Raw Water pumps(AHP)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of the Raw Water pumps(PT)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM- Make pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Boiler fill Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Service Water Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of APH Wash Water Pump
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Condensate Transfer Pump
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM Transfer Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Chilled Water pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Condensate water pumps
M/s KAVERI CONSTRUCTION CO.
M/S S N ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .