Tender Value
₹14.5 L
EMD Value
₹28,953
Closing Date
31 Aug 2026, 9:00 am7d left
DSCO Gurdaspur
Room no 401 402 third Floor Block B District Administrative Complex Gurdaspur
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of RCC Pipe from Mogha
2026_DOA_173911_1
DSWC/GUR/2026-2027/13
Open Tender
Civil Works
Item Rate
180 days
Kahnuwan Batala District Gurdaspur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹28,953
19 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
CSR 29.70 CSR29.71
Pipe Dia Excavation Lowering TC Jointing Cutting Cutting AVP Fixing AAV Fixing AVP
435 0.4 1.2 mat lab
with 850 bajri & 850 sand
Cement sand bajri lab Total
198.13 Cement sand bajri lab Total
calculation for 800 mm cement 245,sand 1200,bajri 1400
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village DASKA (C/o 11180/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1344 /m3 53 71232
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 700 /Mtrs 54.46 38122
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 221.52702886247877 62027.56808149406
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 47.25 283.5
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 13.049999999999999 26.099999999999998
Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 733.9434069043576 4403.660441426146
Fixing of Air vent Pipes with C.C 1:2:4 2 /Air pipe 226.3786078098472 452.7572156196944
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 2 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 59800
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 283 Per joint 24 Rupees Twenty Four Only 6792
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 26424 Rupees Twenty Six Thousand Four Hundred Twenty Four Only 26424
Grand Total 269563.5857385399
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village KALBANJARA (C/o 69500/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1840 /m3 53 97520
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 920 /Mtrs 54.46 50103.200000000004
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 368 /Joints 221.52702886247877 81521.94662139218
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 8 /Cut hole 47.25 378
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 13.049999999999999 52.199999999999996
Fixing of Risers & Alfa valves with C.C 1:2:4 8 /Riser & Valve 733.9434069043576 5871.547255234861
Fixing of Air vent Pipes with C.C 1:2:4 4 /Air pipe 226.3786078098472 905.5144312393888
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 5 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 149500
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 368 Per joint 24 Rupees Twenty Four Only 8832
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 34733 Rupees Thirty Four Thousand Seven Hundred Thirty Three Only 34733
Grand Total 429417.4083078664
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GUR/2026-27/13
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
:- Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 350 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Moga No 12030/R Vill. Awan, Batala & Distt. Gurdaspur, and Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Moga No 10565/L Vill. Awan, Batala & Distt. Gurdaspur and Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 500 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Mogha no. 24500/R Village -Hambowal, Tehsil Kahnuwan, Distt. Gurdaspur.
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs 1447666
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%) 0
WORK-1 :-Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 350 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Moga No 12030/R Vill. Awan, Batala & Distt. Gurdaspur
Estimate Sanction No. 13236/D.B. Dated 07/08/26, Amount 1513600/-
Abstract of Cost
Sr. No. Particulars Amount
1 Cost of Labour 355850.49
2 Cost of Material 54095.86
3 Cost of Labour and Material (01Houdi) 35062
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1855.04 /m3 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1359 /Mtrs 76 Rupees Seventy six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 ½ Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 543 /Joints 94 ninty four Only
Pipe line Hole 350 mm 15 /number 95 ninty five Only
Pipe line Hole 150 mm 5 /number 41 Forty One Only
350 mm Providing Risers 15 Riser & Valve 83 eighty three Only
350 mm Fixing of Alfa Alfa Valve 15 /number 73 seventy three Only
350 mm Applying End Closer 0 /number 132 Rupees One Hundred Thiry Two Only
150 mm Fixing of Air vent Pipes 5 /Air pipe 73 Seventy Three Only
350 mm slating Pipe 0 /number 73 Rupees seventy three Only
1000 mm Fixing of Pump Stand 0 /number 1040 One Thousand and Forty Only
Pipe line 350 mm LT Joints 0 /Joints 116 One Hundred Sixteen Only
Transportation of Pipes 119 /Tone 172.94 Rupees One Hundred Seventy two and ninty four Paisa Only
Applying Gate Valve 350 mm 2 /number 1321.99 One Thousand Six Hundred Twenty Six and Thiry Nine Paisa Only
Cost of Other Material
Cement 101 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 306.8 /Cum Foot 34 Rupees Thirty four only
Haudi jal 1 /No. 4000 Four thausand
sign board 1 /No. 5000 Five thausand
Bajri 52.5 /Cum Foot 26 Rupees Twenty six Only
Nimar 50.01 / Kg 60 Rupees sixty Only
Amount of soil excavation and filling
Sr. no. Description Length (In Meters) Breath (In Meters) Depth (In Meters) Quantity (Cube Meter)
1 350 mm. Trench digging and filling for pipe 1359 1.05 1.3
Sr.no. Description Quantity Rate Units Amount
1 Excavation of soil, filling in voids and laying surplus soil 93.78 Per Cube Meters
Cost of Material for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Cement 12 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 66.74 /Cum Foot 34 Rupees thrity four only
Bajri 10.59 /Cum Foot 26 Rupees Twenty six Only
Bricks 2280 / Thousand 7500 Rupees Seventy five hundred Only
Bar (Steel) 17.95 /Kg 66.2 Rupees Sixty six and two Paisa Only
Brick Bread 0 /Joint 39.6 Rupees Thiry Nine Paisa Six Only
Cost of Labour for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earthwork in excavation 8 cum 93.78 Rupee Ninety Three and Seventy Eight Paisa
Laying of stone aggregate in foundation 0.6 /Cum 1269.4675 One Thosand Two hundred Sixy nine and Forty Seven paisa 761.68
Cement Concrete 0.14 /Cum 1269.4675 One Thosand Two hundred Sixy nine and Forty Seven paisa 177.73
Bricks Work 4.75 /Cum 1397.99 One Thosand Three hundred Ninety nine and Forty Seven paisa 6640.47
Cement Plaster 15.32 /Cum 132.741 one hundred thirty two pint seven four 2033.59
RCC Slab 0.21 /Cum 1269.4675 tewlve hunder sixty nine and fourty seven paisa only 266.59
Total Cost of Houdi
Sr. No. Cost of One Houdi No. of Houdi Amount
WORK-2 :-Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Moga No 10565/L Vill. Awan, Batala & Distt. Gurdaspur.
Estimate Sanction No. 13253/D.B. Dated 7.8.26, Amount 1773700/-
Abstract of Cost
Sr. No. Particulars Amount
1 Cost of Labour 368114.07
2 Cost of Material 65601
3 Cost of Labour and Material (02 Houdi) 70124
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1915.65 /m3 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1290 /Mtrs 71 Rupees Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 ½ Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 516 /Joints 122 Rupees One Hundred Twenty Two Only
Pipe line Hole 400 mm 16 /number 105 One Hundred and five Only
Pipe line Hole 150 mm 5 /number 41 Forty One Only
400 mm Providing Risers 16 Riser & Valve 125 One Hundred Twenty Five Only
400 mm Fixing of Alfa Alfa Valve 16 /number 94 Ninety Four Only
400 mm Applying End Closer 15 /number 91 Rupees ninty one Only
150 mm Fixing of Air vent Pipes 5 /Air pipe 73 Seventy Three Only
400 mm slating Pipe 0 /number 132 Rupees One Hundred Thiry Two Only
1000 mm Fixing of Pump Stand 0 /number 1040 One Thousand and Forty Only
Pipe line 400 mm LT Joints 0 /Joints 116 One Hundred Sixteen Only
Transportation of Pipes 127.856 /Tone 172.94 Rupees One Hundred Seventy two and ninty four Paisa Only
Applying Gate Valve 400 mm 3 /number 1564 One Thousand five Hundred sixty four Only
Cost of Other Material
Cement 124 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 412.45 /Cum Foot 34 Rupees Thirty four only
sign board 1 /No. 4000 four thausand only
Haudi jal 1 /No. 4000 four thausand only
Bajri 81 /Cum Foot 26 Rupees Twenty six Only
Nimar 71.208 / Kg 60 Rupees One Hundred Thirty Four Paisa Four Only
Amount of soil excavation and filling
Sr. no. Description Length (In Meters) Breath (In Meters) Depth (In Meters) Quantity (Cube Meter)
1 400 mm. Trench digging and filling for pipe 1290 1.1 1.35
Sr.no. Description Quantity Rate Units Amount
1 Excavation of soil, filling in voids and laying surplus soil 93.78 Per Cube Meters
Cost of Material for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Cement 12 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 66.74 /Cum Foot 34 Rupees thrity four only
Bajri 10.59 /Cum Foot 26 Rupees Twenty six Only
Bricks 2280 / Thousand 7500 Rupees Seventy five hundred Only
Bar (Steel) 17.95 /Kg 66.2 Rupees Sixty six and two Paisa Only
Brick Bread 0 /Joint 39.6 Rupees Thiry Nine Paisa Six Only
Cost of Labour for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earthwork in excavation 8 cum 93.78 Rupee Ninety Three and Seventy Eight Paisa
Laying of stone aggregate in foundation 0.6 /Cum 1269.4675 One Thosand Two hundred Sixy nine and Forty Seven paisa 761.68
Cement Concrete 0.14 /Cum 1269.4675 One Thosand Two hundred Sixy nine and Forty Seven paisa 177.73
Bricks Work 4.75 /Cum 1397.99 One Thosand Three hundred Ninety nine and Forty Seven paisa 6640.47
Cement Plaster 15.32 /Cum 132.741 - 2033.59
Total Cost of Houdi
Sr. No. Cost of One Houdi No. of Houdi Amount
WORK-3 :-Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of 500 mm Dia RCC Pipes, providing and fixing of AVP, construction of haudie, Mogha no. 24500/R Village - Hambowal, Tehsil Kahnuwan, Distt. Gurdaspur.
Estimate Sanction No. 13265/D.B. Dated 07.08.2026, Amount 1953500/-
Abstract of Cost
Sr. No. Particulars Amount
1 Cost of Labour 379163.93
2 Cost of Material 77862
3 Cost of Labour and Material (04 Houdi) 36792
4 Sign Board 5000
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2040.97 /m3 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1158 /Mtrs 71 Rupees Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:1 ½ Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 463 /Joints 150 Rupees One Hundred Thiry Two Only
Pipe line Hole 500 mm 9 /number 127 One Hundred Sixteen Only
Pipe line Hole 150 mm 5 /number 41 Forty One Only
500 mm Providing Risers 9 Riser & Valve 146 One Hundred Twenty Five Only
500 mm Fixing of Alfa Alfa Valve 9 /number 146 Ninety Four Only
500 mm Applying End Closer 2 /number 150 Rupees One Hundred Thiry Two Only
150 mm Fixing of Air vent Pipes 5 /Air pipe 73 Seventy Three Only
500 mm slating Pipe 0 /number 132 Rupees One Hundred Thiry Two Only
1000 mm Fixing of Pump Stand 0 /number 1040 One Thousand and Forty Only
Pipe line 500 mm LT Joints 1 /Joints 150 One Hundred Sixteen Only
Transportation of Pipes 139 /Tone 213.14 Rupees One Hundred Sixty and Thity Paisa Only
Applying Gate Valve 500 mm 1 /number 1675.37 One Thousand Six Hundred Twenty Six and Thiry Nine Paisa Only
Cost of Other Material
Cement 181 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 543.1 /Cum Foot 32 Rupees Thirty Two only
Bajri 56.1 /Cum Foot 24 Rupees Twenty Four Only
Nimar 36 / Kg 134.4 Rupees One Hundred Thirty Four Paisa Four Only
Amount of soil excavation and filling
Sr. no. Description Length (In Meters) Breath (In Meters) Depth (In Meters) Quantity (Cube Meter)
1 500 mm. Trench digging and filling for pipe 1158 1.175 1.5
Sr.no. Description Quantity Rate Units Amount
1 Excavation of soil, filling in voids and laying surplus soil 2040.975 93.78 Per Cube Meters
Cost of Material for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Cement 13 /bag 299.99 Rupees Two Hundred Ninety Nine Paisa Ninety Nine Only
Sand 68.51 /Cum Foot 32 Rupees Thirty Two only
Bajri 11 /Cum Foot 24 Rupees Twenty Four Only
Bricks 2583 / Thousand 6600 Rupees Seven Thousand Only
Bar (Steel) 18 /Kg 51.33 Rupees Sixty Twoe and Eighty Four Paisa Only
Brick Bread 0 /Joint 39.6 Rupees Thiry Nine Paisa Six Only
Cost of Labour for One Houdi
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earthwork in excavation 8 cum 93.78 Rupee Ninety Three and Seventy Eight Paisa
Laying of stone aggregate in foundation 0.6 /Cum 1269.4675 One Thosand Two hundred Sixy nine and Forty Seven paisa 761.68
Cement Concrete 0.14 /Cum 1305.71 One Thosand Two hundred Sixy nine and Forty Seven paisa 182.79
Bricks Work 5.61 /Cum 1397.91 One Thosand Three hundred Ninety nine and Forty Seven paisa 7842.27
Cement Plaster 20.12 /Cum 132.741 - 2670.74
Total Cost of Houdi
Sr. No. Cost of One Houdi No. of Houdi Amount
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
DNIT13.pdf
Tender Documents • 1.22 MB
1313.xls
Tender Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].