Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | -38.99% | ₹4.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 LAdmitted-Finance | -33.33% | ₹4.7 L | L2 | Admitted-Finance |
| 3 | L3₹4.7 LAdmitted-Finance | -32.69% | ₹4.7 L | L3 | Admitted-Finance |
Updated dates
Tender Value
₹7.0 L
EMD Value
₹14,040
Closing Date
19 Jan 2026, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Improvement Restoration of Panjtilla I and Panjtilla II of D16 of MRC at places
2026_IFC_300040_1
e-NIT No. 13 of 2025-26
Open Tender
Civil Works - Canal
30 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹14,040
Executive Engineer RCC Lower Division Hiranagar
22 Jan 2026
7 Jan 2026
20 Jan 2026
7 Jan 2026
19 Jan 2026
7 Jan 2026
7 Jan 2026 - 10 Jan 2026
10 Jan 2026
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
Dismantling concrete grouted stone pitching in aprons drains etc. including stacking of serviceable material and disposal of unserviceable material, stacking /disposal lead upto 100 meters.
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal
Dry stone pitching (any thickness) excluding cost of stones. On Slopes
Supply of Stone
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.
Carriage of Materials from Source to site of work a) Carriage of sand and Bajri av. 10 Kms by Mechincal Transport and 150M by Head Load
Carriage of Materials from Source to site of work b) Carriage of Stone av. 10 Kms by Mechincal Transport and 150M by Head Load
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_973474.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid