Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-Finance | ₹1.8 L | 1 | Accepted-Finance FINANCIALLY QUALIFIED |
| Sl No | Description | Qty | Unit | SRI VENKATESWARA POWER SYSTEMS L1 |
|---|---|---|---|---|
| 1.01 | Lump-sum Total Price for entire Scope of Work as detailed in
Tender Specification Number: BHE/PW/BTPS/ELE/SPGT/TE | 1 | Lumpsum | 1,80,000 ₹1.8 L |
Tender Value
Refer Docs
Closing Date
20 Jan 2026, 3:00 pmClosed
D. RAUDE (SDGM)
BHEL, BTPS SITE OFFICE 4X270MW BTPS MANUGURU- 57117
Spare Generator Transformer Nitrogen Filling, 50 NB Valve Replacement, and Conducting FRA Test at 4x270 MW BTPS, Manuguru Project.
2026_BHEL_56998_1
BHE/PW/BTPS/ELE/SPGT/TE
Single
Miscellaneous Works
10 days
BTPS, Manuguru
AS PER NITTCC
4 documents required · 4 mandatory
₹0
Exempted
22 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
13 Jan 2026 - 20 Jan 2026
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid