Tender Value
₹2.9 Cr
EMD Value
₹16.5 L
Closing Date
2 Jul 2026, 12:00 pmDue tomorrow
Similar tender results from the same govt authority in the past 3 years.
CHIEF ENGINEER CIVIL
NAGAR NIGAM AGRA
jon-1 chhatta ke antargat kuberpur sthit khattaaghar plant ki paschim disha mein vayu pradushan niyantran, paryavarniy sanrshan evam parisar suraksha sutt dhikaran hetu sudridh surakshatmak bounndriwal nirman karya .
2026_DOLBU_1163158_1
03-06-2026/NAGAR NIGAM AGRA/02-07-2026/18
Open Tender
Construction Works
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹23,600
NAGAR NIGAM
₹16.5 L
25 Jun 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
2 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) | 2,268 | Cum | 150 | ₹3,40,200 |
| 2 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) | 1,814.4 | Cum | 230.1 | ₹4,17,493.44 |
| 3 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) | 141.75 | Cum | 5,325 | ₹7,54,818.75 |
| 4 | RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth leuel:1:2:4 in raft foundation (1cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size) | 878.85 | Cum | 7,750 | ₹68,11,087.5 |
| 5 | Reinforced cement concrete work in walls/columns (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abulments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand ;3 graded stone aggregate 20 mm nominal size) | 756 | Cum | 8,350 | ₹63,12,600 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including the cost of centering, shuttering, finishing exlcuding reinforcement, with 1:1.5:3 in heavier beam (1 cement: 1.5 coarse sand(zone-lll) : 3 graded stone). | 60.75 | Cum | 8,900 | ₹5,40,675 |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level.
(b) 10mm to 12mm tor.
(Chapter No. 10 S.I. No. 504(B)) | 1,635.61 | Qtl | 8,500 | ₹1,39,02,685 |
| 8 | Sub Total | 1 | Rs | 1 | ₹1 |
| 9 | Add/Deduction Rs. For Estimate Figure Amount Match | 1 | Rs | -5.69 | - |
| 10 | Grand Total | 1 | Rs | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
BOQ_2182149.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid