Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 3₹36.2 L+₹3.4 L (10.3%)Accepted-AOC | 3 | Accepted-AOC Bonafide as lowest bidder | |
| 2 | 1₹32.8 LRejected-Finance | 1 | Rejected-Finance Non-bonafide | |
| 3 | 2₹35.2 L+₹2.4 L (7.19%)Rejected-Finance | 2 | Rejected-Finance Non-bonafide | |
| 4 | Rejected-Technical CHANDPURA TIKAMGARH DIST TIKAMGARH MP | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | - | Rejected-Technical Not enlisted in tender cat |
Tender Value
₹36.1 L
EMD Value
₹72,000
Closing Date
5 Apr 2021, 6:00 pmClosed
Garrison Engineer Abohar
Garrison Engineer Abohar Pin-152116
Outsourcing for Manning and Operation including routine maint of E/M Installation at Mil Stn Fazilka
2021_MES_421167_2
GE ABH-54/20-21
Open Tender
Civil Works
Item Rate
330 days
Fazilka Mil Stn
MES Registered Contractor enlisted in class E Category d (v) having deposited standing security of Rs 50000 with departments. Contractors not registered in MES should meet the MES enlistment criteria corresponding to appropriate class and category
5 documents required · 5 mandatory
₹500
Garrison Engineer Abohar
₹72,000
Yes
19 Jul 2021
22 Mar 2021
7 Apr 2021
22 Mar 2021
5 Apr 2021
23 Mar 2021
Amount
Outsourcing for Manning, operation and maintenance of borewell No. 4 (MAP Location Fazilka) + RO Plant 3000 ltr / Hr capacity + DG Set 30 KVA + sewage installation, round the clock, in three shifts, each shift of 8 hours duration by employing 01 No. FGM (Semi Skilled) in each shift etc alongwith upkeeping of installed machinery & other assets, maintenance of documents, also keeping clean of the surrounding area of bore well No. 04 complete all as specified and directed by Engineer-in-Charge.
Outsourcing for Manning, operation and maintenance of pump house No. 5 (Bde HQ Location Fazilka) + RO Plant 1500 ltr / Hr capacity + DG Set 30 KVA + sewage installation, in two shifts, each shift of 8 hours duration by employing 01 No. FGM (Semi Skilled) in each shift etc alongwith upkeeping of installed machinery & other assets, maintenance of documents, also keeping clean of the surrounding area of pump house No. 5 complete all as specified and directed by Engineer-in-Charge.
Outsourcing for Manning, operation and maintenance of water supply installation (Odianwali Location) + RO Plant 500 ltr / Hr capacity + DG Set 100 KVA in two shifts, each shift of 8 hours duration by employing 01 No. FGM (Semi Skilled) in each shift etc alongwith upkeeping of installed machinery & other assets, maintenance of documents, also keeping clean of the surrounding area of water supply & DG Set at Odianwali complete all as specified and directed by Engineer-in-Charge.
Outsourcing of Manning, operation and maintenance of Over Head Tank at different location of Fazilka Mil Stn in Two Shift, each shift of 8 hours duration by employing 01 Valve Man (Unskilled) in each shift etc alongwith upkeep of OHT, also keeping clean of the surroundings area of OHT at different location, complete all as specified and directed by Engineer-In-Charge.
Outsourcing for Manning, operation and maintenance of HT indoor and outdoor Sub station connected 11 KV UG cable 2/4 poles structures, LT UG cable, Main receiving station to transformer yard in different locations from capacity 100 KVA to 400 KVA and routine maintenance of different locations of Sub Stations at Fazilka Mil Stn complete round the clock in three shifts, each shift of 8 hours duration by employing 01 No. Electrician (Semi Skilled) in each shift etc alongwith upkeep of installed machinery & other assets, maintenance of documents, also keeping clean of the surrounding area of the main receiving station & sub station complete all as specified and directed by Engineer-in-Charge.
Outsourcing for Manning, operation and maintenance of HT indoor and outdoor Sub station, connected 11 KV UG cable 2/4 poles structures, LT UG cable, Main receiving station to transformer yard in different locations of capacity 160 KVA -01 Nos, 100 KVA - 02 Nos and routine complaints at different locations at Odianwali complete round the clock in three shifts, each shift of 8 hours duration by employing 01 No. Electrician (Semi Skilled) in each shift etc alongwith upkeep of installed machinery & other assets, maintenance of documents, also keeping clean of the surroundings area of the main receiving station & sub station, complete all as specified and directed by Engineer-in-Charge.
EAGAL CONSTRUCTION COMPANY
HARSH CONSTRUCTION CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .