| 1 | L1₹82.5 LAccepted-AOC | ₹82.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹82.8 L+₹30,364 (0.37%)Rejected-Finance | ₹82.8 L+₹30,364 (0.37%) | L2 | Rejected-Finance Highest Value Quoted |
Tender Value
₹85.9 L
EMD Value
₹1.7 L
Closing Date
8 Aug 2023, 3:00 pmClosed
Additional Collector,
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Periodic Renewal and 5 years maintenance of L024-Arni - Vandavasi road to Chengalvarayapuram road via Erumbur in Peranamalur Block Package No.TN2478 Tiruvannamalai District
2023_RDTN_126757_1
Roc.No.A11/2863/2023 Date.12.07.2023 78
Open Tender
Civil Works - Roads
Item Rate
120 days
Peranamallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.7 L
30 Jan 2024
27 Jul 2023
8 Aug 2023
27 Jul 2023
8 Aug 2023
27 Jul 2023
Amount
Periodic Renewal and 5 years maintenance of L024-Arni - Vandavasi road to Chengalvarayapuram road via Erumbur Km 0/0-4/752 (R25, R94) in Peranamalur Block
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 Kg per Sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous concrete 25 mm thick Providing and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass Beads on Bituminous surface
Providing HM Stone
Providing KM Stone
Repainting of Existing Name board
Repainting of Existing Maintenance board
Towards the charges for routine maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, desilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Kothanya Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .