| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.4 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹25.7 L+₹1.3 L (5.42%)Rejected-Finance | 2 | Rejected-Finance L-2 | |
| 3 | 3₹26.1 L+₹1.8 L (7.25%)Rejected-Finance NUAPATANA P O BANGUARI P S BALIANTA KHURDA 751032 | KHORDHA | ODISHA | 751032 | 3 | Rejected-Finance L-3 |
Tender Value
₹28.6 L
EMD Value
₹57,295
Closing Date
12 May 2023, 6:00 pmClosed
AGM ENGG.(C)
O/o. Airport Director, B.P.I.Airport, Bhubaneswar
Sepcial repair to Hangar and its Link taxi up to Apron (AAI Hangar allotted to M/s.OSL)
2023_AAI_151983_1
AAI/BS/ENGG(C)/NIT-02/2023-24
Open Tender
Civil Works
Works
90 days
B.P.I.AIRPORT, BHUBANESWAR
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,180
₹57,295
6 Jun 2023
19 Apr 2023
15 May 2023
20 Apr 2023
12 May 2023
20 Apr 2023
20 Apr 2023 - 27 Apr 2023
Amount
Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity.
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge.
Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion On W.B.M / W.M.M. @ 0.4kg/sqm
Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion On bituminous surface @ 0.25kg/sqm
4 cm thick bitumastic sheet with hot bitumen of approved quality,using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 2.60 cum per 100 sqm and coarse sand @ 2.60 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately) :With paving asphalt grade VG - 30 with no solvent
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished welded type tubes
Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer- in -charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
AJAY KUMAR LENKA
PRASANTA KUMAR BEURIA
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .