Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | Admitted-Finance |
| 2 | Admitted-Finance 612 DIWAN ESTATE AMBEDKAR GALI HARSH VIHAR EAST DELHI DELHI 110093 | NORTH EAST DELHI | DELHI | 110093 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹45.8 L
EMD Value
₹50,000
Closing Date
5 Aug 2020, 3:00 pmClosed
CM ELECTRICAL
CM ELECTRICAL OFFICE TECHNICAL BUILDING NFL BATHINDA
SERVICE AND MAINTENANCE OF HVAC SYSTEM CENTRAL AIR CONDITIONING SYSTEM PACKAGE UNITS PORTABLE ACS WATER COOLERS REFRIGERATORS AND DESERT COOLERS ETC AT NFL BATHINDA
2020_NFL_52143_1
NFB/E-290/AC/2020-21
Open Tender
Electrical Works
Works
365 days
NFL BATHINDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹750
NATIONAL FERTILIZERS LIMITED BATHINDA
₹50,000
3 Nov 2020
3 Jul 2020
6 Aug 2020
3 Jul 2020
5 Aug 2020
3 Jul 2020
3 Jul 2020 - 29 Jul 2020
Amount
PART A - (CENTRAL AIR CONDITIONING PLANT): Service, running/ periodic maintenance of Central Air Conditioning Plants and Package Units etc. of Following capacities and specifications. (The Operational Period of Months for Item No. 1 & 2 of Part-A shall be measured on actual operation basis).
Central AC Plants for CPP C/R (One set consisting of 2x60 T & 1x30T capacity AC unit per month for 12 months)
Package AC System for GTG Plant (One set consisting of 12x11 T & 2x3T capacity AC unit per month for 12 months)
Central HVAC Units in New Ammonia Plant (One set consisting of 129.5T X 3 capacity HVAC unit per month for 12 months)
Package Units for SG Plant C/R (One set consisting of 3 x 11 T capacity AC unit per month for 12 months)
.-do- for Urea Plant C/R (One set consisting of 2x11 T capacity AC unit per month for 12 months)
.-do- for ESP C/R in CPP (One set consisting of 2x11 T capacity AC unit per month for 12 months)
.-do- for VFD room in SGP (One set consisting of 3x11 T capacity AC unit per month for 12 months)
.-do- for VFD room in Ammonia (One set consisting of 2x11T capacity AC unit per month for 12 months)
.-do- for ESP C/R in SGP (One set consisting of 1x11T capacity AC unit per month for 12 months)
Water cooled Air Pressurization unit in CPP (One set consisting of 21000 CFM capacity Air Pressurization unit per month for 08 months)
.-do-, Capacity 35000 CFM
Flame Proof Package AC Units (One set consisting of 2x3T + 1x5T capacity Shelter AC unit per month for 12 months)
Part B-1: Running and periodic maintenance of Portable AC Units, Water Cooler, Desert Cooler etc. of following Capacities and specification. (The Quantities for Part-B-1 shall be measured on actual basis).
Window type AC of capacity 0.75T (3 Numbers per month for 8 Months)
.-do- but 1.0 T (5 Numbers per month for 8 Months)
.-do- but 1.5T (184 Nos. X 8 Months)
Split AC of capacity 1.0 T/1.5 T /2.0 T (142 Numbers per month for 8 Months)
Split AC of capacity 3.0 T (6 Numbers per month for 8 Months)
Split AC of capacity 1.5T/2.0T (10 Numbers per month for 12 Months)
Water cooler of capacity 150 Ltr. (49 Numbers per month for 8 Months)
Water Cooler of capacity 380 Ltr (3 Numbers per month for 8 Months)
Desert cooler with one exhaust fan and one pump (335 Numbers per month for 8 Months)
Refrigerator of capacity 100/165 Ltr. (21 Numbers per month for 12 Months)
Refrigerator of capacity 240/265 Ltr. (3 Numbers per month for 12 Months)
Refrigerator of capacity 300/400 Ltr. (7 Numbers per month for 12 Months)
Biological Oxygen Demand Incubator (2 Numbers per month for 12 Months)
Bottle cooler/Deep Freezer of capacity 100/150 Ltr. (3 Numbers per month for 12 Months)
Part B-2: Shifting of Portable AC Units, Water Coolers/ Refrigerators/ Bottle coolers/ BOD incubators/ Desert Coolers etc. of following capacities and specification. (The Quantities for Part-B-2 shall be measured on actual basis).
Shifting for new installation of AC/ Water coolers/ Refrigerators/ BOD Incubators, Desert cooler with in Factory & Township:
a) Different size of Portable AC of capacity up to 2 T/ Water coolers/ Bottle coolers/ BOD Incubators & Refrigerators.
b) Different size of Desert coolers
Strengthening of frame/stand/ply etc.for old installed AC and desert coolers in Factory and Township
a) Different sizes of portable AC upto 2 T
b) Different sizes of desert coolers
Shifting for new installation of AC, Desert cooler, Water cooler, Refrigerator from Factory to Township & vice versa
a) Different capacity of portable AC up to 2 T
b)Different capacity of water cooler up to 150 Ltr.
c)Different capacity of Refrigerator up to 400 Ltr.
d) Different capacity of Desert Coolers of all sizes
e)Bottle cooler/ Deep freezer/ BOD Incubators of all sizes
Providing & Fixing/ Replacement of Float Valve Assembly complete in all respects,15 mm nominal bore of Desert Coolers installed in factory & township.
Providing fixing/ Replacement of Flexible water line connections pipe 15 mm nominal bore& 30 cm long from the existing water lines to the Desert Coolers/ water coolers of factory & township.
Part B-3(i) REFRIGERATOR
Gas filling capacity upto 180 ltrs. (with new drier)
Gas filling capacity above 180 ltrs. Upto 400 ltrs.
Compressor replacement with reconditioned one capacity upto 180 ltrs.
-do- capacity above 180 ltrs. Upto 400 ltrs.
Replacement of cooling coil with new one upto 180 ltrs.
-do- above 180 ltrs. Upto 400 ltrs.
Replacement of condenser coil with new one upto 180 ltrs.
Replacement of condenser coil with new one-above 180 ltrs. Upto 400 litres
Replacement of defective thermostat with new one for all capacity
Replacement of defective relay with new one for all capacity
Replacement of thermostat knob for all capacity
Filter/Strainer with capillary for all capacity
Dryer for all capacity
OLP for all capacity
Relay for all capacity
Panel Gasket for 165 ltr. Capacity
Panel Gasket above 165 ltrs. Upto 400 ltr. Capacity
Part B-3(ii) DEEP FREEZERS/ BOD INCUBATOR/ BOTTLE COOLER
Gas filling any capacity
Compressor repairing charges of any capacity
Rewinding of fan motor
Replacing of defective relay with new one for all capacity.
Replacing thermostat with new one for all capacity
Filter/Strainer with capillary
O.L.P. for any capacity
Part B-3(iii) Air Conditioner -1.0 Te
Compressor replacement with reconditioned one
Fan motor repair
Thermostat
Starting capacitor
Running capacitor
Relay
Fan motor capacitor
Blower wheel
Strainer(copper) with capillary
Knob set
Filter Pad
New wiring kit
Front Grill (plastic)
Water tank
Condenser coil
Cooling coil
Gas filling (complete job welding/ including brazing)
Overload protector (OLP)
Air Conditioner -1.5 Te
Compressor replacement with reconditioned one
Fan motor repair
Thermostat
Starting capacitor
Running capacitor
Relay
Fan motor capacitor
Blower wheel
Strainer(copper) with capillary
Knob set
Filter Pad
New wiring kit
Front Grill (plastic)
Water tank
Condenser coil
Cooling coil
Gas filling (complete job welding/ including brazing)
Overload protector (OLP)
Air Conditioner -2.0 Te
Compressor replacement with reconditioned one
Fan motor repair
Thermostat
Starting capacitor
Running capacitor
Relay
Fan motor capacitor
Blower wheel
Strainer(copper) with capillary
Knob set
Filter Pad
New wiring kit
Front Grill (plastic)
Water tank
Condenser coil
Cooling coil
Gas filling (complete job welding/ including brazing)
Overload protector (OLP)
Part B-3(iv) WATER COOLER
Compressor replacement with reconditioned one
Fan motor replacement
Fan motor repair
Thermostat
Starting capacitor
Running capacitor
Relay
Overload Protector
Fan motor capacitor
Fan blade complete
Strainer (copper) with capillary
New wiring kit
Tank rubber gasket
Condenser coil
Cooling coil
Tap valve
Float valve with float
Gas filling complete job welding/including brazing etc.
Part B-3 (v) DESERT COOLER
Fan motor rewinding and repairing
Water pump replacement with new one Submersible Type
Pump motor rewinding/repairing
Cleaning and painting of complete cooler
Replacement of suction filter parts with new one
Front Grill (Plastic)
Speed Regulator
On-off switches
Fan motor capacitor
PVC hose for water distribution
Water distribution cap (Plastic)
Water discharging elbows (Plastic)
New wiring kit
Electronic speed regulator make Anchor
NOTES TO ANNEXURE 1) All the consumables and non consumable material are to be supplied by NFL for Part-A except refrigerant gas R-12/134a, R-22 and Nitrogen Gas, which shall be supplied by contractor at no additional charges. 2) Vacuum Pump, Gas transfer pump, Condensing unit and empty mafron gas cylinders are also to be arranged by the contractor as and when required without any delay or additional charges. 3) For Part B-1 & B-2, the rates are inclusive of all material required for completion of job and no additional payment shall be made to the contractor. 4a) For Part B-3 (I) to (v), the rates are inclusive of all material required for completion of job and no additional payment shall be made to the contractor. b) Rates have been taken for the machines presently not in maintenance schedule and shall be added later on. c) These items are not to be operated in normal conditions. d) Gas filling include checking & repair of leaking points in gas circuit and shall b carried out by the contractor at no additional cost. 5) For any clarification regarding job execution, refer to the Job Specifications & Scope of work.
Part B-3(vi) REPAIR JOBS & REFRIGERANT GAS
Repair of Crank Shaft of FRICK Make 606 compressor by grinding of connecting rod segments, re-metalling of Big End Bearings with white metal matching to connecting rod segments size, Re-metalling of Main Body Bush with white metal and shaft by spray welding process as per actual size given & cleaning of oil ports.
Repair of Crank Shaft of FRICK Make 303 compressor by grinding of connecting rod segments, re-metalling of Big End Bearings with white metal matching to connecting rod segments size, Re-metalling of Main Body Bush with white metal and shaft by spray welding process as per actual size given & cleaning of oil ports.
Supply of Refrigerant Gas R-12
Supply of Refrigerant Gas R-22
Supply of Refrigerant Gas 134a
Kumar Air Conditioning Engineers
Blue Star Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .