Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.2 LAccepted-AOC | 1 | Accepted-AOC Lowest Tender | |
| 2 | Rejected-Technical | - | Rejected-Technical Not fullfill the eligibility criteria as per NIT | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
₹5.7 L
EMD Value
₹11,350
Closing Date
14 Sept 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (Civil)
O/o the Deputy Chief Engineer, ALHW, Kavaratti
Maintenance of jetty at Eastern side and Western side of Minicoy Island
2020_ALHW_578606_1
DCE/KVT/DB/T-19/2020-21 Dated 20.08.2020
Open Tender
Civil Works
Item Rate
75 days
Mininicoy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,350
Yes
11 Nov 2020
24 Aug 2020
15 Sept 2020
24 Aug 2020
14 Sept 2020
25 Aug 2020
75 days
Amount
Demolishing / breaking of damaged portion of hand rail, handrail post and Kerb wall etc. of the jetty straightening the rods and bending the same so as to keep fit to bond new rods dismantled materials to be shifted to shore and dumping as directed, cost of all labour charges minor tools, scafolding charges etc.
RCC 1:0.9:1.8 (One cement point nine M sand one point eight granite jelly of 20mm and down size) hand rails and karb wall excluding fabrication charges which will be paid separately, cost of cement, sand, Jelly and all other materials which will be supplied by the departmental on free of cost, including cost of screening and washing of both the aggregates, providing all shuttering centering, propping wherever required, cost of all shuttering materials, mixing concrete, conveying and placing consolidation with vibrator, curing transportation charges of all other materials to work site, hire charges, running expenses of concrete mixer machine and vibrator etc.
Fabrication and fixing of MS.rod for Hand rail, Hand rail post and kerb wall excluding cost of M.s rod which will be supplied by the department store at Minicoy and including cost all labour charges, transportation, cost of binding wire and minor tools etc. complete.
Providing wearing coat wherever necessary with Cement concrete 1:2:4 excluding cost cement, jelly and M sand which will be supplied by the department on free of cost but including cost of all labour charges, minor tools nominal shuttering and centering charges, transportation charges of all materials to work site etc., complete
Applying one coat wall primer on the concrete surface of jetty including cleaning the surface cost of all labour charges minor tools cost of materials etc., complete.
Western side jetty
Eastern side jetty
Painting two coats with ready mixed acrylic plastic emulsion paint (extra) antifunges paint on the surface, hand rails & Hand rail post, lamp post etc., including the cost of labour charges, cost of painting brush, cost of paint and thinner and other materials etc. complete.
Western side jetty
Eastern side jetty
Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufactures specifications including appropriate priming coat, preparation of surface, etc. complete. ( Steel Work) 2 times in year.
Western side jetty (gate, bollard etc.,)
Eastern side jetty (gate, bollard etc.,)
Fabrication of Entrance gate of jetty size 6M X2.10M with using GI pipe including cost of all materials like 2 1/2" GI class "C" pipe, 1 sqm inch TATA tube of 4 mm thick, suitable hinges, locking arrangements etc., cost of all labour charges, welding charges, transportation charges of all materials to work site, etc., complete.
Providing and fixing Twin type bollards of 10T/20T capacity on the old jetty including demolishing the existing concrete at required location as per the direction of Engineer-in-charge including cost of transportation of bollards from LHW store to site, fixing the same in position and providing bolts and nuts in concrete. Welding charges for fixing bolts and nuts with main reinforcement rods leveling the same etc., but excluding cost of bollard, bolts and nuts washer which will be provided free of cost at LHW, store service of Crane, Forklift etc., will be provided with POL & operator if available on free of cost.
Fixing of truck tyre fender for berthing side of the western side jetty as directed by the Engineer in charge including cost of all labour charges minor tools but excluding cost of materials etc., complete.
Collection, transportation and fixing of giant tyre fender on berthing face of eastern side jetty as and when required as directed by the Engineer in charge including cost of all tools, all labour charges but excluding cost of all materials like giant tyre, chain "D" shackle, and forklift supplied by the department of free of cost etc., complete.
Lifting giant tyre fender of various size from sea bed spread along premises of Eastern side jetty berthing face of draught about 9 M to 15 M / western side jetty of depth of 2 to 3 m and shifting to the stack yard with in a KM excluding hire charges of Fork Lift /JCB crane which will be provided by the department on free of cost subject to availability but including all diving equipments, tackles, safety measures, transportation charges, all labour charges etc., complete as per the direction of Engineer-In- Chagre.
Western side jetty
Eastern side jetty
Re arranging the dislocated giant tyre fenders of the berthing face of eastern side jetty due to regular berthing of cargo and passenger ships by removing D shackles lifting and placing the giant tyre over the berthing jetty, re arranging the G.I. chains attending minor repairs for the chain by Cutting / adding pieces changing damaged D shackles with new placing the tyre back on the berthing face as directed by EIC locking to the U bolt with D shackles including cost of all labour charges minor tools but excluding cost of chain, D shackle wire ropes, hire charges of crane etc., complete which will be supplied by the department free of cost etc., complete.
Locking 2/3 gaint tyre fender together with chain / wire rope firmly to one another through the eyelets and providing clamps to the wire ropes after lifting to the required level whenever required including cost of all labour charges minor tools, etc., but excluding cost of all materials which will be supplied by the department free of cost.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .