| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.1 LAdmitted-Fee/PreQual/Technical/Finance | -11.20% | ₹15.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹16.9 L+₹1.9 L (12.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹16.9 L+₹1.9 L (12.6%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹16.9 L+₹1.9 L (12.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹16.9 L+₹1.9 L (12.6%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹16.9 L+₹1.9 L (12.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹16.9 L+₹1.9 L (12.6%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹16.9 L+₹1.9 L (12.6%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹16.9 L+₹1.9 L (12.6%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16.9 L
EMD Value
₹16,949
Closing Date
20 Aug 2026, 5:00 pmClosed
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
CONSTRUCTION OF MARKET COMPLEX INFRONT OF MUNICIPALITY GATE IN W.N-11
2026_ORULB_138352_2
BM_12_2026_27
Open Tender
Civil Works - Others
Percentage
60 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,949
Yes
21 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single under reamed 250 mm dia pile foundation with RCC M20 using 12mm size HGCB Stone chips incluiding cost of boring but excluding cost of MS/Tor steel and labour charges for cutting, bending and binding of steel. a) 250mm dia 4.0 mtr U/R depth pile | 22 | Nos | 3,301.7 | ₹72,637.4 |
| 2 | Earth Work in excavation of foundation in ordinary soil within 50met. Initial lead and 1.5met. Initial lift including rough dressing and levelling the bed including all labour T&P etc. complete as directed by the Engineer - in Charge. | 12.39 | Cum | 206.06 | ₹2,552.22 |
| 3 | Filling in foundation and plinth with sand well watered,rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. | 48.59 | Cum | 1,399.33 | ₹67,995.63 |
| 4 | Cement concrete (1:3:6) using 4cm size hard granite hand broken metal with all cost conveyance,royalty,taxes etc all complete. | 8.69 | Cum | 6,440.2 | ₹55,965.74 |
| 5 | R.C.C. Work with M-20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement. | 28.01 | Cum | 6,677.8 | ₹1,87,074.39 |
| 6 | Supplying, fitting, fixing & placing uncoating bar reinforcement complete as per drawing & technical specification complete. | 26.82 | Qntl | 9,359.67 | ₹2,50,998.27 |
| 7 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. a) Pile cap & G Beam(foundation & plinth) | 55.28 | sqm | 248.67 | ₹13,745.23 |
| 8 | b) Column & Beam | 67.55 | sqm | 1,204.5 | ₹81,357.95 |
| 9 | C) Lintel | 21.8 | sqm | 574 | ₹12,513.2 |
| 10 | D) Stair case | 8.98 | sqm | 1,047.14 | ₹9,400.7 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_605574.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .