The Chief Engineer / Distribution / KPMR
No.01. Kanchipuram Road Olimohammedpettai Kanchipuram 631502.
Construction of 1 No 33 KV bay, 2 Nos. 11 KV feeder bay and providing Transformer Plinth, Retaining Wall, Fire Protection Wall, Cable Duct and other alied civil works at Pillaiyarpalayam 33 / 11
2026_EB_692865_1
CE / D / KPMR / C.1008 / 2026 - 2027
Open Tender
Civil Works - Others
Works
120 days
Kanchipuram Region
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹49,100
Yes
11 Aug 2026
11 Aug 2026
8 Sept 2026
12 Aug 2026
7 Sept 2026
13 Aug 2026
13 Aug 2026 - 24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing juliflora jungle with uprooting including all labour lead lift etc., complete. | 140 | Sq.m | - | - |
| 2 | Dismantling the existing damaged / unwanted PCC and carefully stacking the retrieved materials if any useful for re-use and clearing the debris away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | 2 | Cu.m | - | - |
| 3 | Dismantling the existing damaged / unwanted RCC and carefully stacking the retrieved materials if any useful for re-use and clearing the debris away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | 2 | Cu.m | - | - |
| 4 | Dismantling the existing Brick wall / stone masonry in cement / lime mortar and clearing the debris away from the site including cost of all labour, lead, lift, etc., complete as directed by the Engineer at site. | 2 | Cu.m | - | - |
| 5 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in hard stiff clay, stiff black cotton soil, hard red earth, shale, murram, gravel, stony earth and earth mixed with small size boulders including cost of all labour, T&P etc., complete as directed by the Engineers at site. | 140 | Cu.m | - | - |
| 6 | Filling with M.Sand / Filling sand complying with standard specification for filling watering and compaction in layers for filling in foundation and basement including the cost of all labour, lead, lift, T&P etc., complete as directed by the Engineers at site. | 30 | Cu.m | - | - |
| 7 | Providing Cement Concrete 1 : 3 : 6 using 20 mm HBG metal for foundation, flooring with out form box including the cost of all materials, lead, lift, labour, T&P etc., complete as directed by the Engineers at site | 30 | Cu.m | - | - |
| 8 | Providing Cement Concrete 1 : 2 : 4 using 20 mm HBG metal for foundation, Plinth, flooring with out form box including the cost of all materials, lead, lift, labour, T&P etc., complete as directed by the Engineers at site. | 80 | Cu.m | - | - |
| 9 | Providing R .C .C . 1 : 2 : 4. using 12 to 20 mm HBG metal for Raft and Plinth Condrete with out form box including the cost of all materials, lead, lift, labour, Centring charges, T&P etc., complete as directed by the Engineers at site but excluding the cost of Steel reinforcement. | 120 | Cu.m | - | - |
| 10 | Providing Centering for Soffits for RCC using Silver Oak Scantlings & Planks, including the cost of all materials, lead, lift, labour, T&P etc., complete as directed by the Engineers at site. | 630 | Sq.m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_833108.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].