Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 CrQualified HYDERABAD HYDERABAD TELANGANA 500051 UDYAM TS 20 0003387 36AANCS5257K1ZQ R M MII STATUS AS VERIFIED | MEDCHAL MALKAJGIRI | TELANGANA | 500051 | ₹14.5 Cr | L1 | Qualified MSE, MII, Category: General |
| 2 | L2₹14.5 CrQualified S 22 3RD FLOOR TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD RANGAREDDI TELANGANA 500037 | MEDCHAL MALKAJGIRI | TELANGANA | 500037 | ₹14.5 Cr | L2 | Qualified MII |
| 3 | Disqualified 8 99 6 P NO 16 PEERZADIGUDA NARAPALLY HYDERABAD HYDERABAD TELANGANA 500039 | MEDCHAL MALKAJGIRI | TELANGANA | 500039 | - | - | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
17 Sept 2025, 10:00 amClosed
Composite Long Rod Insulators (POWERGRID) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6553504 Dated : 02-09-2025 Bid Document 1/13 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Primary product category Composite Long Rod Insulators (POWERGRID) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 21 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Manager Corporate Office Gurgaon
POWER GRID Corporation OF INDIA Limited
POWER GRID Corporation OF INDIA Limited
Ministry of Power (Manikala Poorna Chandra Rao) Splitting
8202981
GEM/2025/B/6553504
Two Packet Bid
Composite Long Rod Insulators (POWERGRID)
180 days
628902, POWERGRID CORPORATION OF INDIA LIMITED, 765/400 kV Substation Ettayapuram, Tuticorin District
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
Exempted
2 Sept 2025
2 Sept 2025
17 Sept 2025
Composite Long Rod Insulators (POWERGRID) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6553504 Dated : 02-09-2025 Bid Document 1/13 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Primary product category Composite Long Rod Insulators (POWERGRID) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 21 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Manager Corporate Office Gurgaon
POWER GRID Corporation OF INDIA Limited
POWER GRID Corporation OF INDIA Limited
Ministry of Power (Manikala Poorna Chandra Rao) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8202981.pdf
GEM_BID
technical_specification_clr_insulator_2024-11-06-17-34-41_c16f2f26a735a081339c35fbccee6f46.pdf
SPECIFICATION
drawing_2024-11-06-17-38-26_6f307b95d8b9a9dda1e57a5333814d21.pdf
OTHER
1755594093.pdf
OTHER
BuyerATC_ecc9103c-6854-49a7-bcba1756729385816_buyerbangalore15.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER