| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC NO 51 TOWN HALL 3RD STREET ARAKKONAM TAMIL NADU 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹29.4 L+₹1.8 L (6.66%)Rejected-AOC 2 RC ENTERPRISES NEAR AGRASEN BHAWAN BHATAPARA CHHATTISGARH LINK ROAD BALODA BAZAR RAIPUR CHHATTISGARH 493118 | BALODA BAZAR | CHHATTISGARH | 493118 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹32.5 L+₹4.9 L (17.7%)Rejected-AOC 47A C3 OLD DAMU NAGAR PULIAKULAM COIMBATORE 641 045 | COIMBATORE | COIMBATORE | TAMIL NADU | 641045 | L3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
1 Jun 2021, 6:00 pmClosed
CWE NAVY CHENNAI
Commander Works Engineers Navy Military Engineer Services INS Adyar Old Building Fort St George Rajaji Salai Chennai 600 009
REPAIRS/ MAINTENANCE TO CENTRAL AC PLANT FOR SONABUOY STORAGE ACCN, EHB, MAGAZINE B AND C AND RAJALIKA AT INS RAJALI ARAKKONAM
2021_MES_440347_1
87648 CWE/NAVY/ARK/ OF 2021- 22
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
ARAKKONAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE MAINT ARAKKONAM
₹74,000
Yes
26 Jun 2021
4 May 2021
3 Jun 2021
4 May 2021
1 Jun 2021
18 May 2021
5 May 2021 - 14 May 2021
Amount
Material & Labour for gas charging by vacuumising complete system of Central type AC plant of capacity 110 TR x3 with double stage vaccum pump of (-) 2 Kg/sqcm vaccum pressure after repairs to compressor or Repair in Refrigeration System, Charging the Dry nitrogen gas & hold up to 24 hrs and rectifing the leakage, if any, by bracing/welding/ replacing the "O" ring & Gland packing of service valve including topping up the compressor oil and charging the Gas upto desired pressure all as specified , instructed & directed. Note :- i) Once the Gas is charged in it, it should hold in the system for minimum six months. If any gas leaked from the system the contractor has to charge the gas upto required level at free of cost and No extra cost on this account shall be claimed. ii) Compressor oil and Refrigerant gas shall be measured and paid separately under relevant item as supply only. iii) Labour charge for replacement of compressor oil and refrigerant gas is deemed to be included in the quoted rate. iv) Leakage test on each complete unit shall be measured separately.
Material & Labour for descaling the condenser coil of Central type AC plant capacity 110 TR by circulating descaling chemical through cooling tower re-circulating pump set up to 2 to 3 hours and opening the end cover of condenser and manually cleaning the inner tubes with nylon brush until complete scale gets removed and flushed out with fresh water, reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower, make up water tank etc... as required including commissioning in all respect complete all as specified and directed.
Description all as per Sl item No. 2 here-in-before above but for Chiller of Central AC plant of capacity 110 TR complete all as specified and directed.
Material & Labour for dismantling unserviceable Butterfly valves any type, 200 mm dia, including supply and fixing new Butterfly valve 200 mm dia , alongwith replacement of bolts , nuts , washers and rubber gaskets etc... complete all as specified and directed.
Description all as per Sl item No. 4 above but for 200 mm dia MS pipe all as specified and directed.
Maintenance and repairs to compressor of Central type AC plant capacity 110TR including fault finding and rectification of microprocessor based control panel including its calibration, replacing defective parts as required to keep the compressor operational, checking and testing for satisfactory operation complete all as specified and directed. Note :- i) Repair/ servicing work to be carried out only by service person of OEM or his authorised agency. ii) Contractor must submit service report from OEM/his authorised service agency after carying out repairs by them.
Material & Labour for dismantling unserviceable / worntout "V" belts, any type / model and supply & fix new "V" Belt of following specifications including necessary testing complete all as specified and directed:- Make :- FENNER / DUNLOP / V GRIP
V- Belt of size A-83
V- Belt of size A-57
Taking down the centrifugal pump set,12 to 15 HP , 3 phase, 415 volts, 50 Hz ( condenser & chilled water re-circulating pump set) for servicing /overhauling by replacing unserviceable bush & bearings, gland packing , studs, gasket etc... including machining work to shaft reassemble the pump set and painting with two coats of synthetic enamel paint, erecting testing and commissioning complete all as specified and directed.
Description all as per Sl item No. 8 herein before but of capacity 10 HP
Description all as per Sl item No. 8 herein before but of capacity 7.5 HP
Taking down the condenser water recirculating pumpset along with MS frame from the existing foundation and supply newly fabricated MS frame of same type and size as per existing specification including necessary welding & fixing including painting with two coats of synthetic enamel paint and including connecting inlet & Outlet as well as other electrical connections of pump etc... for smooth funtioning complete all as specified and directed.
Taking down the unserviceable centrifugal motor and dismantling including taking out damaged/burnt out winding from motor, cleaning the slots with CTC and rewinding the same with new super enamelled copper winding wire of existing gauge and turns, oiling and greasing assembling and installing back into position for making motor fully functional and testing for satisfactory running complete all as specified and directed for the following capacities:-
Supply only Compressor oil (grade as per manufacturer recommendation)
Supply only Refrigerant gas (Non-CFC) R-134A
Supply only Refrigerant gas (Non-CFC) R-407 C Note for item no 13 to 15:- Labour charges are deemed to be included in the quoted rate of relevant repair items
Material & Labour for Servicing and cleaning of following Air Handling Units ( AHU's ) including humidification pumps of Central type A/ C including taking down and cleaning of air filters by caustic soda and flushing with water and refixing in original position and cleaning of fire dampers , blowers , spray nozzles , condensate water tray including greasing of blower bearing / blower motor , tightening belt, providing necessary bolts, nuts and testing for proper functioning complete all as specified and as directed. Note :- (i) Servicing of AHU to be carried out twice in the entire contract period and Each job will be measured and paid separately. (ii) Spares required for replacement, if any, shall be measured and paid separately under relevant items as supply and fixing.
a) AHU at Sonabuoy complex
b) AHU at Magazine "B" & "C"
Supply & Replace the MS lov - joy (Male & Female) coupling, complete with star rubber disc, as per sample, for condenser recirculating pump & chilled water pump all as specified and directed.
Supply & Replace the star nylon disc for lov - joy, as per sample, for condenser recirculating pump & chilled water pump all as specified and directed.
Supply and fix expansion valve suitable for 110 TR central AC plant all as specified and directed. Make: Voltas
Supply and replace oil pressure cutout all as specified and directed. Make: indfoss/danfoss
Supply and replace water pressure cutout all as specified and directed. Make : indfoss/danfoss
Supply and replace pressure gauge/Temperature gauge all as specified and directed. Make: scientific/fiebeg
Supply & replace temperature sensor for water entering & leaving from condenser / chiller A/C plant/ AHU room complete all as specified and directed.
Supply and replace single phase preventer 415 V, 3 Ph complete all as specified and directed. Make: L&T/Siemens/ABB/Crompton Greaves/GE
Supply & Replace HP /LP pressure cut out switch complete all as specified and directed.
Supply & Replace HP pressure switch
Supply & Replace LP pressure switch
Supply and replace microprocessing unit PCB set as per recommendation of manufacturer for functioning of Central Air conditioning plant complete all a specified and directed.
Taking down/ dismantling the defective hot water generator for servicing /overhauling including replacing unserviceable accessories, and carrying out painting with two coats of synthetic enamel paint and re-erecting including all connections, testing complete all as specified and directed.
Material and Labour for taking down unserviceable electrical contactors / relays / disconnectors/ Timer / fuse unit , any type /capacity / model from electrical control panels including supply and fixing items of following specifications all as specified and as directed :-
Contactor Set for 3 pole contactor AC, 415V, 70 Amps as existing . Make: L&T/Siemens/BCH
contractor set for 3 pole contractor AC3, 110 Amps are existing Make: BCH / L & T / Siemens
Over load relay (direct mounting) of Range 63 - 80Amps Make: BCH / L & T / Siemens
Over load relay of Range 100 - 160 Amps Make: BCH / L & T / Siemens
Contactor set for 3 pole AC,415V ,32 Amps as existing. Make: BCH / L & T / Siemens
Contactor set for 3 pole AC,415V ,25 Amps as existing. Make: BCH / L & T / Siemens
Material and labour for taking down the burnout / defective scroll type compressor from 12.5TR unit and replace the factory made compressor including re-fixing and charging with dry Nitrogen gas, leakage/pressure testing, arresting the leakage by brazing and vacumming, gas charging, testing and commissioning complete all as specified and directed. Note :- Leak test , Vacuuming & Refrigerant gas shall be measured separately under relavant items.
Material and Labour for carry out the leak test complete system of central AC Plant 12.5TR x 3 Nos. by charging the dry nitrogen gas & holding up to 24 hrs and rectifying the leakage if any by bracing / welding / replacing the 'Ö' ring etc... and Vacuumising complete system of Air-conditioning plant with double stage vaccum pump of (-) 2 Kg/Sqcm vaccum pressure after repairs to line / replacement of compressor or Repair in Refrigeration System, including charging the refrigerant Gas upto desired pressure all as specified & directed. Note :- i) Once the Gas charged in it, it should hold in the system for minimum six months, if any gas leaked from the system the contractor has to charge the gas upto required level at free of cost and No extra cost on this account shall be claimed. ii) Refrigerant gas shall be measured and paid separately under relevant item as supply only. iii) Labour charge for replacement of refrigerant gas is deemed to be included in the quoted rate. iv) leakage test on each complete unit shall be measured separately.
Supply and replace Air filter, 5 Micron washable type suitable for AHU of Central Air conditioning plant all as specified and directed.
Material and Labour for dismantling unserviceable NRV 150mm bore dia supply and fix new valve 150mm bore dia including replacement of bolts, nuts washers and rubber gaskets complete all as specified as directed Make: LP/Leader/Kirlosker
Material and Labour for dismantling unservicable water strainer any type up to 150mm bore dia supply and fix new water strainer 150mm bore dia, both flanged "U" type and suitable for existing location including replacement of bolts, nuts washers and rubber gaskets complete all as specified as directed
Supply and replacement of MCCB adjustable type of following capacity / specifications, 440V, 50 Hz with extended terminal & spreader link complete all as specified as directed Make: Legrand / L & T/ Siemens / ABB / Schneider
(a) MCCB 4 pole, 36KA, 250Amp
(b) MCCB 4 pole, 16KA 63Amp
(c) MCCB 4 pole, 16KA 40Amp
Supply and replacement of sprinkler assembly for cooling tower suitable for 110 TR capacity complete all as specified as directed
supply and replacement of Drift eliminators assembly for cooling tower suitable for 110TR capacity complete all as specified as directed
supply and replacement of PVC mesh for cooling tower complete all as specified and directed
Dismantling and taking down the defective reciprocating open type compressor from the central type AC plant 45TR Capacity of Make: Voltas, Model No. 5H60 by disconnecting suction and discharge valves after pumping down the system and other controls, dismantling the compressor for overhauling, servicing, cleaning all the internal parts and check for damage / wear and tear of any part and replace if required/ accessories as listed in Schedule 'A', re-assembling the compressor in all respect, re-fixing and reconnecting all disconnected lines including pressure testing as per the OEM recommendation / specification, conducting vacuum test, checking for leakage, arrest if any & commissioning for proper function of all instruments like pressure gauge, pressure switches, solenoid valve, expansion valve etc., replace if required, complete as specified and as directed.
Note for Sl Item No 40 here-in-before:- (i) Unserviceable parts / accessories required to be replaced will be measured and paid for under relevant items. (ii) Unserviceable parts / accessories listed in schedule 'A' will be replaced only after the approval of Engineer-in-charge. (iii) Labour charges for removing unserviceable parts / accessories and replacement with new one shall be deemed to be included in the unit rate. (iv) Any minor spares / parts /accessories not covered in the Schedule 'A' but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (v) Leak test, gas & oil charging shall be measured under relevant items. (vi) Renewal of control wiring in the system/panel with suitable size copper cable as per site requirement is deemed to be included in the unit rate quoted.
Material and Labour for gas charging by vacuumising the complete system of central type air-conditioning plant of capacity 45/50 TR with double stage vacuum pump of (-) 2 Kg/cm2 vacuum pressure after repairs to compressor or repair in refrigeration system, charging the dry nitrogen gas & hold up to 24 hrs and rectifying the leakage, if any, by replacing the 'O' ring & gland packing of service valve including top up the compressor oil and charging the gas all as specified, instructed & directed. Note : (i) Once the gas charged in it, it should hold in the system for minimum six months, if any gas leaked from the system the contractor has to charge the gas for free of cost. No extra cost on this account is admissible. (ii) Refrigerant gas R-22 required shall be measured and paid for under relevant items.
Central type AC plant of capacity 50 TR at Engine Holding Building.
Central type AC plant of capacity 45 TR at Auditorium.
Material and Labour for servicing of oil pump including supply and replacing all un-serviceable parts of following compressors:-
Make : VOLTAS compressor, Model - 5H60 , Capacity-45 TR at Auditorium.
Make : BLUE STAR compressor, Model - 403677, Capacity-50 TR at Engine Holding Bay.
Material and Labour for descaling the shell and tube condenser coil of Central AC plant of capacity 45/50 TR by circulating descaling chemical through re-circulating pump set up to 2 to 3 hours and open the end cover of condenser and manually cleaned the inner tubes with nylon brush until complete scale is removed and flush out with fresh water, reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower, make up water tank etc... as required including commissioning in all respect for the followings plants :-
Central type AC plant of capacity 50 TR at Engine holding Building.
Central type AC plant of capacity 45 TR at Auditorium.
Description all as per Sl item No. 43 here-in-before but for chiller of following capacity AC plants :-
Central type AC plant of capacity 50 TR at Engine holding Building.
Central type AC plant of capacity 45 TR at Auditorium.
Material & Labour for dismantling unserviceable Butterfly valves any type, 100 mm dia, including supply and fixing new Butterfly valve 100 mm dia , alongwith replacement of bolts , nuts , washers and rubber gaskets etc... complete all as specified and directed. Make: LP/Leader/Kirlosker/Sant
Material & Labour for dismantling unserviceable Butterfly valves any type, 150 mm dia, including supply and fixing new Butterfly valve 150 mm dia , alongwith replacement of bolts , nuts , washers and rubber gaskets etc... complete all as specified and directed. Make: LP/Leader/Kirlosker/Sant
Material & Labour for dismantling unserviceable Non Return Valve, 100 mm bore dia, including supply and fixing new valve 100 mm dia , butterfly type alongwith replacement of bolts , nuts , washers and rubber gaskets etc... complete all as specified and directed. Make: LP/Leader/Kirlosker/Sant
Supply and Fix including welding in its original position 100mm dia MS pipe line medium grade including all specials / joints and taking down old corroded pipe complete all as specified and as directed Make : JINDAL / TATA / PRAKASH
Taking down the existing corroded MS pipe of 150mm dia condenser water recirculating pipe line and supply and fix including welding in its original position MS pipe medium grade 150mm
Supply and fix MS flange 150 mm dia including Bolts ,Nuts, gasket etc... and taking down old corroded one complete all as specified and directed
Material and Labour for dismantling unserviceable water strainer any type upto 100mm bore dia, supply and fix new water strainer 100 mm bore dia, both flanged "U" type and suitable for existing location butterfly type, including replacement of bolts, nuts, washers and rubber gaskets complete all as specified and directed.
Material & Labour for dismantling unserviceable / worntout "V" belts, any type / model and supply & fix new "V" Belt of following specifications including necessary testing complete all as specified and directed:- Make : FENNER / DUNLOP / V GRIP
V - Belt of size C-127
V - Belt of size C-122
V - Belt of size A-82
V - Belt of size A-57
V - Belt of size B-93
V - Belt of size B-74
Taking down the centrifugal pump set,12 to 15 HP , 3 phase, 415 volts, 50 Hz ( condenser & chilled water re-circulating pump set) for servicing /overhauling by replacing unserviceable bush & bearings, gland packing , studs, gasket etc... including machining work to shaft reassemble the pump set and painting with two coats of synthetic enamel paint, erecting testing and commissioning complete all as specified and directed.
Description all as per Sl item No. 53 herein before but of capacity 10 HP
Description all as per Sl item No. 53 herein before but of capacity 7.5 HP
Material and Labour for taking down unserviceable electrical contactors / relays / disconnectors/ Timer / fuse unit , any type /capacity / model from electrical control panels including supply and fixing items of following specifications all as specified and as directed :-
Contactor 3 pole with 1NO+1NC, 415 V of capacity AC3, 110 Amps with with 415 volt coil, Type AC -3 complete set as existing Make: L&T/Siemens/BCH as approved by GE
Contactor Set for 3 pole contactor AC3, 415V, 32 Amps as existing . Make: L&T/Siemens/BCH as approved by GE
Contactor Set for 3 pole contactor AC3, 415V, 16 Amps as existing . Make: L&T/Siemens/BCH as approved by GE
Contactor Set for 3 pole contactor AC3, 415V, 110 Amps as existing . Make: L&T/Siemens/BCH as approved by GE
Contactor Set for 3 pole contactor AC3, 415V, 70 Amps as existing . Make:L&T/Siemens/BCH as approved by GE
Over load relay (direct mounting) of range 13.2 - 20 Amps Make : BCH, Cat Part No : MC305ANA3L or equivalent make of L&T/Siemens/BCH / GE as approved by GE
Power contactor set for 3 pole contactor AC3, 25 Amps, MNX 25 as existing Make :L&T/Siemens/BCH as approved by GE
Taking down the existing unserviceable MCCB from the panel supply and fix new MCCB, adjustable type of following capacity / specification, 415V, 50Hz with extended terminal & spreader link Make: Legrand / L & T / siemens / ABB/Schneider
(a) MCCB 4 pole, 25KA, 32Amp
(b) MCCB 4 pole, 25KA 63Amp
(c) MCCB 4 pole, 35KA 100Amp
(c) MCCB 4 pole, 35KA 125Amp
Material and Labour for dismantling and removing the unserviceable thrust bearings from the Air Handling Units (AHU) of the central type AC plants and replacing with new thrust bearing No - 6306 of same type / model, assembling back, reinstalling, connecting and testing all as specified and as directed.
Material and Labour for servicing of follwoing Air Handling Units (AHU's) with humidification pumps of central type AC by cleaning air filters, fire dampers, blowers, spray nozzles, condensate water tray, greasing of blower bearing/ blower motor, tightening all bolts, nuts and testing for proper functioning all as specified and as directed:-
(a) AHU Model AHU-9 CWC/ 6R/130, 1500 Cfm with electric motor 10 HP Make : Blue Star, Location : Auditorium Building
(b) AHU Model AHU-3 with chilled water cooling coil, Model : CWC/32/4R/130, 3600 Cfm with electric motor. Make : Blue Star, Location : Engine Holding Bay Note : Servicing of AHU to be carried out twice in the entire contract period and each job will be measured and paid separately.
Supply & replace the MS lov-joy (Male & female) coupling complete with star rubber disc as per sample for condenser recirculating pump & chilled water pump complete all as specified and directed.
Supply & replace the lov-joy star rubber disc as per sample for condenser recirculating pump & chilled water pump complete all as specified and directed.
Taking down the condenser water recirculating pumpset along with MS frame from the existing foundation. Supply, fabricate MS frame of same size including welding and fixing 7.5 HP pump set, 3 phase, 415 volts, 50 Hz ( condenser/ chilled water re-circulating pump set) and connecting inlet and outlet, electrical connections etc... for smooth functioning all as specified and as directed.
Supply and replace pilot control valve complete all as specified and directed Make : Sporlan or equivalent as approved by GE
Supply and fix expansion valve suitable 45TR central AC plant compressor complete all as specified and directed Make: Voltas
Supply only following spares for compressor of make Voltas, Model 5H60
Supply only gasket set of compressor 45 TR Make: Voltas, Model 5H60
Supply only shaft seal assemply of compressor 45 TR Make: Voltas, Model 5H60 Note : Labour Charge for fixing items / spares in item No. 65 above is deemed to be included in the quoted rate of item No.40 here-in-before
Supply and replace compound gauge Make: Scientific/Fiebig
Supply and replace pressure gauge Make: Scientific/Fiebig
Supply and replace Compressor oil (Sheetal-68)
Supply and replace Refrigerant gas R-22 Note for item No. Labour charge is deemed to be included in the quoted rate of item No.41 here-in-before
Supply only single phase preventer, 415 volt AC, 3 Phase, 50 Hz. Make: L&T/Siemens/ABB/Crompton Greaves/GE as approved by GE
Supply and replace HP/ LP pressure cutout switch (dual pressure)
Supply only HP pressure switch
Supply and replace oil pressure cutout switch
Supply and replace water pressure cutout switch
Supply only LP pressure switch
Supply and replace temperature sensor for water entering & leaving from condenser/ chiller/ AC Plant Make : Blue star or equivalent as approved by GE Note for Sl item Nos. 65 to 74 here-in-before: The rates for fixing of the supply only items are deemed to be included under Sl item Nos. 40 & 41 here-in-before.
Material and Labour for dismantling and removing the unserviceable FRP casing & Basin from the existing cooling tower capacity 110TR of the central type A/C plant and replacing with following new FRP casing & Basin including testing all as specified and as directed by Engr-in-Charge Make : Delta
Supply and replacement of new fan blade assembly from the existing cooling tower capacity 110TR of the central type AC plant all as specified and as directed by Engr-in-Charge Make : Delta
Supply and replacement of sprinkler assembly for cooling tower suitable for 110 TR capacity complete all as specified as directed
Supply and replacement of PVC fills from the existing cooling tower capacity 110 TR of the central type AC plant all as specified and as directed by Engr-in-Charge Make: Delta
Supply and replacement of PVC branch pipes & Drift Eliminators from the existing cooling tower capacity 110TR of the central type AC plant all as specified and as directed by Engr-in-Charge Make : Delta
Supply and replacement of GI Header, TSS pipes, FS pipes & mesh from the existing cooling tower capacity 110TR of the central type AC plant all as specifed and as directed by Engr-in-Charge Make : Delta
Supply and replacement of GI Hardware from the existing cooling tower capacity 110TR of the central type AC plant all as specified and as directed by Engr-in-Charge Make : Delta
Material and labour including fabrication MS Hand rails, supporting structure, etc fabricated from structural steel section including nuts, bolts, washers, welding bending cold or hot, drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint including embeding in concrete and screwing etc all as specified and as directed
rc enterprises
KRISHNA ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .