Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance | ₹2.8 L | L1 | Accepted-Finance 1st lowest bidder |
| 2 | L2₹2.9 L+₹10,335 (3.67%)Rejected-Finance | ₹2.9 L+₹10,335 (3.67%) | L2 | Rejected-Finance 2nd lowest bidder |
| 3 | L3₹2.9 L+₹11,039 (3.92%)Rejected-Finance | ₹2.9 L+₹11,039 (3.92%) | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
₹2.8 L
EMD Value
₹5,800
Closing Date
16 Sept 2026, 11:00 amClosed
EE(BR V)
22 SURYA SEN STREET KOL-12
RESTORATION OF ASPHALTUM ROAD SURFACE WITH ANCILLARY WORKS AT EZRA STREET, PARSI CHARCH LANE ETC IN WARD NO-045
2026_KMC_1040790_1
KMC/EE(C)/Br-V/45/07/26-27/2ND
Open Tender
CIVIL WORKS
Percentage
45 days
WARD-45
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5,800
19 Sept 2026
7 Sept 2026
18 Sept 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.42 | %M3 | 11,927 | ₹5,009.34 |
| 2 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 300 | MTR | 8.17 | ₹2,451 |
| 3 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 360 | MTR | 8.17 | ₹2,941.2 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) | 11.47 | M3 | 4,761 | ₹54,591.29 |
| 5 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 360 | MTR | 18.24 | ₹6,566.4 |
| 6 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 290 | MTR | 21.34 | ₹6,188.6 |
| 7 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 362.2 | SQM | 188.23 | ₹68,176.91 |
| 8 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) | 362.2 | SQM | 11.07 | ₹4,009.55 |
| 9 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-divider / footpath) | 20 | EA | 292.48 | ₹5,849.6 |
| 10 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Night Time | 1,400.7 | SQM | 45 | ₹63,031.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.09 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.82 MB
BOQ_2556017.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .