| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | ₹18.0 L | L1 | Accepted-AOC Found L-1 quoted bidder. |
| 2 | L3₹18.2 LRejected-Finance FLAT NO 2B SWARANA PALACE GAMHARIYA SERAIKELA KHARSAWAN 832108 JHARKHAND | GAMHARIYA | SERAIKELA KHARSAWAN | JHARKHAND | 832108 | ₹18.2 L | L3 | Rejected-Finance Quoted rate is higher than estimated cost. |
| 3 | L3₹18.2 LRejected-Finance AMETHIA NAGAR NAMKUM RANCHI | RANCHI | JHARKHAND | 829205 | ₹18.2 L | L3 | Rejected-Finance Quoted rate is higher than estimated cost. |
Tender Value
₹18.0 L
EMD Value
₹36,100
Closing Date
7 Apr 2026, 3:00 pmClosed
DGM, TC, JSR
DGM, TC, JSR Office, Grid Campus, DVC More, Near Sudha Diary, JSR
AMC for of 132 kV DC Adityapur Ramchandrapur Transmission Line 132 kV SC Adityapur Rajkharsawan Transmission Line and 132 kV SC Adityapur Chandil Transmission Line under TSD Adityapur 1.
2026_JSEB_111982_1
885/PR/JUSNL/2025-26
Open Tender
Electrical Works
365 days
Adityapur-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹36,100
Yes
15 Apr 2026
24 Mar 2026
8 Apr 2026
24 Mar 2026
7 Apr 2026
24 Mar 2026
Routine monthly petrolling of 132kV D/C Adityapur-Ramchandrapur Transmission Line and 132 KV S/C Adityapur-Rajkharsawa Transmission Line & 132 KV S/C Adityapur-Chandil Transmission Line including tree prunning, backfilling of earth erosion of tower leg & cleaning of tower leg, repositioning of earth wire, checking tightening & of fasteners, nuts & bolts etc. & vehicle with fuel & driver required for the work (12 times x 62.3 Km = 747.6Km)
(i)132 KV D/C Adityapur-Ramchandrapur Transmission Line from Loc.No.- 01 to 36 (i.e 8.3 Km).
(ii)132 KV S/C Adityapur-Rajkharsawa Transmission Line from Loc. no. 01 to 112 (i.e 35 Km)
(iii) 132 KV S/C Adityapur-Chandil Transmission Line from Loc.No.-01 to 50 (i.e 19 Km).
Breakdown & scheduled maintainence of Transmission Line
(i) Upto 25 jumper
(ii) Beyond 25 jumper to 50 jumper
(iii) Beyond 50 jumper
(i)Upto First 50kM
(ii)50kM<Distance<500kM
Measurement of earth footing Resistance of Transmission Line Towers in the presence of Manager/Jr. Manager.
Sub-Total
Contractors Profit on Sl. No. 1
Overhead Expendinture for T&P etc on Sl. No. 1
Total
Total + GST
Labour Cess @1% on (Total + GST)
Grand Total
Say Rs.
stage.html
html • 0.04 MB
techsummary_151202.pdf
finsummary_151202.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
885ADPtenderdocuments.pdf
Tender Documents • 0.96 MB
ADP_Priceparrt.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid