| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹43.6 L+₹0.04 (<0.01%)Accepted-AOC | ₹43.6 L+₹0.04 (<0.01%) | 2 | Accepted-AOC Balaji Constructions have agreed with all the terms and condition of agreement and sighed the agreement form. |
| 2 | 1₹43.6 LRejected-Finance KAMALPUR P O BAIHATA P S KAMALPUR DIST KAMRUP | KAMRUP | ASSAM | 781030 | ₹43.6 L | 1 | Rejected-Finance Bid rejected |
| 3 | 2₹43.6 L+₹0.04 (<0.01%)Rejected-Finance VILL NIZ KAURBAHA P O BARGHULI P S TAMULPUR BAKSA BTAD ASSAM PIN 781367 | BAKSA | ASSAM | 781367 | ₹43.6 L+₹0.04 (<0.01%) | 2 | Rejected-Finance Work Awarded to Balaji Constructions |
| 4 | 2₹43.6 L+₹0.04 (<0.01%)Rejected-Finance | ₹43.6 L+₹0.04 (<0.01%) | 2 | Rejected-Finance Work Awarded to Balaji Constructions |
| 5 | 2₹43.6 L+₹0.04 (<0.01%)Rejected-Finance | ₹43.6 L+₹0.04 (<0.01%) | 2 | Rejected-Finance Work Awarded to Balaji Constructions |
Tender Value
₹48.4 L
EMD Value
₹96,846
Closing Date
27 Mar 2024, 1:00 pmClosed
EE, Boko Chaygaon Division (irrigation), Boko
o/o EE, Boko Chaygaon Division (irrigation), Boko
Restoration work at Singra FIS under SOPD-G for the year 2023-24
2024_ID_36904_1
NIT 10 of 2023-24
Open Tender
Civil Works
Item Rate
60 days
Boko LAC
Please refer Tender documents.
6 documents required · 6 mandatory
₹969
Yes
₹96,846
Yes
20 Jun 2024
5 Mar 2024
27 Mar 2024
5 Mar 2024
27 Mar 2024
5 Mar 2024
Amount
Raising and Strengthening of Canal from Ch.1250.00m to Ch.1980.00m at RC2, Ch.150.00 to Ch.170.00 at LBMC,Ch.700.00 to Ch.800.00 at RC1,Ch.750.00 to Ch.800.00 at RC2 and Ch.2500.00 to Ch.2600.00 at RBMC of Singra FIS
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed. (A) In ordinary Soil
Restoration of CC Bed at D/S of Headworks
Labour for dismantling of old CC work and stacking the spoils at suitable place including local carriage, complete as directed
Collection of hard river gravel, chips of size 6 mm to 20 mm free from dust and dirt from quarry including loading and unloading etc, complete as directed.
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as directed.
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Restoration of HP Culvert at Ch. 770.00 of Canal RC2
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. (i) Without dewatering
CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supply of Hume pipe NP3 of dia 1200 mm
Supply of Coleer
Labour for fitting and fixing hume Pipe in proper position with collers including joining the joints in cement mortar in prop. 1:3 and curing as per direction of the department including necessary carrying the same from dodown. ( For 90 cm to 120 cm dia)
Construction of Outlet
Earth work in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation shoringetc removing the surplus spoils by head load to a safe distance from the working place and depositing the required spoils in uniform layers dressing watering breaking clods not more than 10mm cube with compensation complete as directed ( Including bailing out stagnant rain water where necessary.) A. All types of soil except mixed with gravel and boulder. (I) For normal lead of 30M. and lift of 1.5 M.
CC work in proportion 1:4:8 in foundation / abutment /piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with broken stone aggregate of size 13 mm to 25 mm including curing with timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supply of Hume pipe NP3 of dia 150 mm.
Supply of Coller (for 150mm dia pipe)
Labour for fitting and fixing hume pipe in position with collars including joiningthe cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directed. (i) For 30 cm to 60 cm dia
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after competition of C.C. & R.C.C. works etc, complete as directed (Measurement to be taken at the face area timbered) (Abutment/Return wall/ Piers/ Pedestal etc) (ii) With 38 mm thick wood plank.
12mm cement plastering including clearing surface and curing complete as directed. i) In Prop.1:3.
Construction of cattle cart crossing at Ch.850.00 (RC2),Ch.900.00(LBMC) and Ch.880.00(RBMC)
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) (i) With 19 mm thick plyboard
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed..
BALAJI CONSTRUCTIONS
Ponkaj Deka
JOGESH KALITA
Padmini Construction
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .