Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Rejected-Technical | - | Rejected-Technical DSC NAME DIFFERENT FROM CONT. CARD |
Tender Value
₹4.8 L
EMD Value
₹9,680
Closing Date
5 Jan 2026, 4:00 pmClosed
Er Imtiaz Ahmed Mir (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2025_PWDJK_299398_1
e-NIT No.134 of 2025-26 Dated 29-12-2025
Open Tender
Civil Works
Percentage
30 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹9,680
14 Jan 2026
30 Dec 2025
6 Jan 2026
30 Dec 2025
5 Jan 2026
30 Dec 2025
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_971263.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .