Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-AOC 28 1 THURAIYUR PUTHUCHINNAKAVUR METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹5.6 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹5.6 LRejected-Finance | ₹5.6 L | 2 | Rejected-Finance Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Exempted only for PEMD not for MSME |
| Sl No | Description | Qty | Unit | SRI SELVALAKSHMI ENTERPRISES L1 | M/s A.Chelladurai & Co L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing Light Jungle and disposing away from site including cost of T&Ps, labour, lead, lift, etc., complete. | 117 | m² | 9 ₹1,053 | 5 ₹585 |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B. | 56.2 | m3 | 163 ₹9,160.60 | 250 ₹14,050 |
| 3.00 | Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete. | 7.1 | m3 | 1,918 ₹13,617.80 | 1,800 ₹12,780 |
| 4.00 | Plain cement concrete in CC 1:3:6, using 40mm HBG metal without form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 7.1 | m3 | 6,833 ₹48,514.30 | 5,800 ₹41,180 |
| 5.00 | Plain cement concrete in CC 1:2:4, using 10 - 20mm HBG metal with form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 28.1 | m3 | 7,812 ₹2.2 L | 6,400 ₹1.8 L |
| 6.00 | Supplying and fixing in position GI angle 75x75x6mm and 65x65x6mm for corner/ intermediate fence post with 2nos. of 30mm length cleats of size 45x45x6mm angle and back support of 50x6mm GI flats, including cost of all materials, transporting, labour charges, welding charges, cutting charges, lead and lift etc., complete and placing in position as directed by Site Engineer. | 1,476 | kgs | 80 ₹1.2 L | 110 ₹1.6 L |
| 7.00 | Supplying and fixing of Chain link fencing 2"x2" using 10 gauge GI Wire of approved quality including cost of all materials, labour charges, lead, lift, etc., complete as per standard specification. | 210.6 | m² | 300 ₹63,180 | 300 ₹63,180 |
| 8.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹42,581.06 | 9 ₹42,657.75 |
| 9.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹42,581.06 | 9 ₹42,657.75 |
| 10.00 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | Lumpsum | - | - |
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
20 Jan 2026, 2:00 pmClosed
SE/CEDC/North/CBE
O/o The Superintending Engineer/CEDC/North, Tatabad, Coimbatore
Carrying out improvement works to the EE O M office rear side of Mettupalayam 110 22 KV SS
2026_EB_639818_1
SE/CEDC/N/CBE/C/No.28/2025-26
Open Tender
Civil Works
120 days
Mettupalayam SS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,900
Yes
11 Mar 2026
6 Jan 2026
21 Jan 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
Clearing Light Jungle and disposing away from site including cost of T&Ps, labour, lead, lift, etc., complete.
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B.
Filling with m.sand for foundation including cost of sand, filling charges, with all leads and lifts, watering, consolidation etc., complete.
Plain cement concrete in CC 1:3:6, using 40mm HBG metal without form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Plain cement concrete in CC 1:2:4, using 10 - 20mm HBG metal with form work including cost of all materials, labour charges, consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Supplying and fixing in position GI angle 75x75x6mm and 65x65x6mm for corner/ intermediate fence post with 2nos. of 30mm length cleats of size 45x45x6mm angle and back support of 50x6mm GI flats, including cost of all materials, transporting, labour charges, welding charges, cutting charges, lead and lift etc., complete and placing in position as directed by Site Engineer.
Supplying and fixing of Chain link fencing 2"x2" using 10 gauge GI Wire of approved quality including cost of all materials, labour charges, lead, lift, etc., complete as per standard specification.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_766054.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid