Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAccepted-Finance | ₹29.7 L | L1 | Accepted-Finance accept |
| 2 | L2₹30.0 L+₹29,727.87 (1.00%)Accepted-Finance | ₹30.0 L+₹29,727.87 (1.00%) | L2 | Accepted-Finance accept |
| 3 | L3₹30.3 L+₹59,455.75 (2.00%)Accepted-Finance | ₹30.3 L+₹59,455.75 (2.00%) | L3 | Accepted-Finance accept |
| 4 | Not Admitted-Fee/PreQual/Technical SHIRGAON RATNAGIRI | SHIRGAON | RATNAGIRI | MAHARASHTRA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹35,016
Closing Date
21 May 2026, 5:00 pmClosed
Executive Engineer RWS ZP Ratnagir
Dr.Babasaheb Ambedkar Bhawan Malnaka Ratnagiri
Repairs to RCCStorage Bandhara at Horambewadi, Gp. Panval Tal.Dist. Ratnagiri.
2026_RATNA_1303000_7
RWSD E TENDER/12/OPEN/26-27
Open Tender
Civil Works - Water Works
Percentage
90 days
Ratnagiri
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,000
₹35,016
Yes
29 Jun 2026
14 May 2026
23 May 2026
14 May 2026
21 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No.1:- Providing road arrangement and site clearance for loading and unloading the material for .. | 1 | L/s | 10,000 | ₹10,000 |
| 2 | Item No.2:- Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-spliting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc | 203.46 | Cum | 409 | ₹83,215.14 |
| 3 | As per R.A No.1 | 1 | Cum | - | - |
| 4 | Item No.3:- Excavation in hard rock of all toughness by Breaker including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-spliting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc | 278.21 | Cum | 526 | ₹1,46,338.46 |
| 5 | As per R.A No.2 | 1 | Cum | - | - |
| 6 | Item No.4 :- Providing and laying in situ C.C. of grade M - 10 of trap / granite / gneiss / quartzite graded metal for foundation And Bedding with concrete Mixer including Placing compacting, curing etc.complete with initial lead of 1 kmand all lifts as directed (40 M.S.A.) | 16.44 | Cum | 5,778.86 | ₹95,004.46 |
| 7 | As per R.A No.3 | 1 | Cum | - | - |
| 8 | Item No.5 :- Providing and laying in situ C.C. of grade M - 200 (1:1.5:3) of trap / granite / gneiss / quartzite graded metal, compacting, curing etc.complete with initial lead of 50 m. and lift 1.50 m. (40 M.S.A.) | 263.08 | Cum | 7,394 | ₹19,45,213.52 |
| 9 | As Per R.A No. 4 | 1 | Cum | - | - |
| 10 | Item No.6 :- Providing and fixing in position mild steel reinforcement Including cutting, bending, bending including cost of reinforcement, binding wire etc. | 3.95 | MT | 75,737.1 | ₹2,99,161.55 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tendernotice_2.pdf
PDF • 2.18 MB
B1.pdf
Tender Documents • 1.41 MB
BOQ_2237148.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .