Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.6 L+₹3,000 (1.85%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹1,800
Closing Date
26 Dec 2024, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Replacement of worn out centre disc and end disc by a new one suitable for RM-54 Ring granulator A at Secondary Crusher House-I
2024_EB_509941_1
CE/SE/MI/TTPS/158/2024-2025
Open Tender
Miscellaneous Works
Works
15 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,800
Yes
20 Mar 2025
11 Dec 2024
27 Dec 2024
11 Dec 2024
26 Dec 2024
11 Dec 2024
Charges for replacement of worn out centre disc and end disc suitable for RM-54 ring granulator A at Secondary Crusher House - I - Including drawal of materials from central stores / TTPS and unloading at secondary crusher house - I - Removing the flange coupling bolts, crusher top cover, chute liner, receiving chute front cover, plummer block bed bolts on both sides etc., and shifting to screen floor - Removal of rotor shaft assembly from its position and shifting in screen floor – Removal of flange coupling, disc spacer, both end of bearing from plummer block, worn out centre disc and end disc in the existing rotor assembly - Cleaning the entire length of rotor shaft at ground floor and all the related spare materials - Shifting to assembling work spot - Assembling the spares like new centre disc, new end disc, disc spacer, frame seal sleeve, suspension bar in the spare rotor shaft and well tightened the both end lock nut - Lifting the assembled crusher rotor shaft from screen floor to crusher floor - Complete cleaning of bearing seating area in the plummer block and rotor shaft, assembling of both end bearing, sleeve, distance sleeve, labyrinth with plummer block etc. After assembling of bearing with plummer block then checking the bearing clearance and free rotation of plummer block on both sides - Oil heating the rotor shaft flange coupling and then assembled in drive end side of rotor shaft - Shifting the new bearing assembled rotor shaft from screen floor to crusher floor and positioning with proper location of crusher A rotor seating area - After proper seating of rotor shaft assemble all the plummer block fixing bolts are provided - Alignment of rotor shaft assembly with respect to jack shaft driven pulley and rotor freeness and bearing clearance checked and well tightened - After completion of all works then assembling of crusher liners, top cover and other released items - Finally connecting the flange coupling bolt and conducting trial running of crusher A - including hire charges for T&P's and all other consumables, etc., complete.
S.GOPALA KRISHNAN CONTRACTOR (BID ID -1214115)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .