| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.4 CrAccepted-AOC 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | ₹14.4 Cr | L-1 | Accepted-AOC Rates found L-1 |
| 2 | L-2₹23.7 CrRejected-AOC | ₹23.7 Cr | L-2 | Rejected-AOC Rates found L-2 |
| 3 | Rejected-Technical R O VILLAGE GOPAL CHOWK PO MAHADEV TEHSIL SUNDERNAGAR DISTRICT MANDI HP 175018 | MANDI | HIMACHAL PRADESH | 175018 | - | - | Rejected-Technical Not qualified by TBOO |
| 4 | Rejected-Technical HIMACHAL PRADESH HP | KINNAUR | HIMACHAL PRADESH | 172101 | - | - | Rejected-Technical Not qualified by TBOO |
Tender Value
Refer Docs
Closing Date
21 Apr 2021, 12:00 pmClosed
Chief Engineer Project Deepak
HQ CE Project Deepak Shimla HP
D AND C OF 40 M AND 70 M SINGLE SPAN MAJOR PMT BR WITHSTEEL TRUSS TYPE SUPERSTRUCTURE THROUGH TYPE ON OPEN FOUNDATION INCLUDING SSI OVER SISSU NALLAH AT KM 84PT900 AND OVER SHONGDONG NALLAH AT KM 154PT875 RESPECTIVELY BOTH ON MANALI SARCHU ROAD UNDER
2021_BRO_624918_1
CE (P) DPK-29 of 2020-21
Open Tender
Civil Works - Bridges
540 days
KM 84PT900 AND KM 154PT875 ON MANALI SARCHU ROAD
As per tender document
16 documents required · 16 mandatory
₹0
Exempted
Shimla HP
9 Aug 2021
31 Mar 2021
22 Apr 2021
31 Mar 2021
21 Apr 2021
8 Apr 2021
31 Mar 2021 - 17 Apr 2021
7 Apr 2021
Amount
Execution of Bridge
SSI, Design including proof checking and Construction of 40 Mtr long single span major permanent bridge with Steel Truss type Superstructure (Through Type) on open foundation over Sissu Nallah at 84.900 Km on Manali Sarchu road under Deepak Project in Himachal Pradesh State as per NIT drawing and based on hydraulic data, ground data, Sub soil data, special conditions and particular specifications of the tender documents. Construction work includes all preparatory work, Erection of staging/shuttering, abutments, return wall, placing of POT & POT Cum PTFE bearings, launching of steel superstructure and casting RCC decking, wearing coat having non skid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, footpaths, kerbs, RCC hand rails, drainage spout, load testing of superstructure of bridge, service arrangement for utility, painting of all exposed steel works, protective works, temporary river training works and diversion, and all other items of works required and necessary for the complete construction of the bridge including curing but excluding works on approaches and approach slab.
SSI, Design including proof checking and Construction of 70 Mtr long single span major permanent bridge with Steel Truss type Superstructure (Through Type) on open foundation over Shongdong Nallah at 154.875 Km on Manali Sarchu road under Deepak Project in Himachal Pradesh State as per NIT drawing and based on hydraulic data, ground data, Sub soil data, special conditions and particular specifications of the tender documents. Construction work includes all preparatory work, Erection of staging/shuttering, abutments, return wall, placing of POT & POT Cum PTFE bearings, launching of steel superstructure and casting RCC decking, wearing coat having non skid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, footpaths, kerbs, RCC hand rails, drainage spout, load testing of superstructure of bridge, service arrangement for utility, painting of all exposed steel works, protective works, temporary river training works and diversion, and all other items of works required and necessary for the complete construction of the bridge including but excluding works on approaches and approach slab.
M/S P & R Infraprojects Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf