Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | L1 | Accepted-Finance Quoted lesser than estimate rate | |
| 2 | L2₹3.0 L+₹355.96 (0.12%)Rejected-Finance | L2 | Rejected-Finance Quoted higher than estimate rate |
| Sl No | Description | Qty | Unit | B Sabari Contractor L1 | G Selvam L2 |
|---|---|---|---|---|---|
| 1.00Construction of Culvert at Near PDS in Katteri Panchayat in Arni Block under General Fund scheme 2025-2026 | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B | 54 | Cum | 263 ₹14,202 Lowest | 265 ₹14,310 |
| 1.02 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. | 4.5 | Cum | 5,494 ₹24,723 Lowest | 5,495 ₹24,727.5 |
| 1.03 | Centering and shuttering for sides including cost and convayance and labour charges etc complete.(Below GL) | 38.34 | Sqm | 547 ₹20,971.98 Lowest | 548 ₹21,010.32 |
| 1.04 | Centering and shuttering for sides including cost and convayance and labour charges etc complete.(Below AL) | 19.98 | Sqm | 1,094 ₹21,858.12 Lowest | 1,100 ₹21,978 |
| 1.05 | Cement Concrete Pavement with C.C.1:3:6 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete | 18.91 | Cum | 5,769 ₹1,09,091.79 Lowest | 5,770 ₹1,09,110.7 |
| 1.06 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete | 1.86 | Cum | 6,799 ₹12,646.14 Lowest | 6,800 ₹12,648 |
| 1.07 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 | 0.2 | Cum | 91,944 ₹18,388.8 Lowest | 91,945 ₹18,389 |
| 1.08 | Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. | 3.09 | Cum | 9,239 ₹28,548.51 Lowest | 9,242 ₹28,557.78 |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 45,077 ₹45,077 Lowest | 45,132 ₹45,132 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
17 Nov 2025, 3:00 pmClosed
The Block Development Officer (B.Pt), Arni Block
The Block Development Office (B.Pt), Arni Block
Construction of Culvert at Near PDS in Katteri Panchayat in Arni Block under General Fund scheme 2025-2026
2025_RDTN_622126_1
Roc.No.565/2025/A6 Date.01.09.2025 ARNI207
Open Tender
Civil Works - Bridges
Item Rate
90 days
Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
27 Nov 2025
11 Nov 2025
17 Nov 2025
11 Nov 2025
17 Nov 2025
11 Nov 2025
Amount
Construction of Culvert at Near PDS in Katteri Panchayat in Arni Block under General Fund scheme 2025-2026
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Centering and shuttering for sides including cost and convayance and labour charges etc complete.(Below GL)
Centering and shuttering for sides including cost and convayance and labour charges etc complete.(Below AL)
Cement Concrete Pavement with C.C.1:3:6 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G Selvam (BID ID -1513449)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tenderdocument.pdf
Tender Documents • 0.31 MB
BOQ_743833.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .