| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹350.3 CrRejected-Finance P AND C TOWERS 2ND FLOOR 140 PERUNDURAI ROAD ERODE 638 011 | ERODE | TAMIL NADU | 638011 | L1 | Rejected-Finance Abnormal Low rate. | |
| 2 | L2₹356.4 Cr+₹6.1 Cr (1.74%)Rejected-Finance SF NO 454 RAGHUPATHYNAICKENPALAYAM RAILWAY COLONY POONDURAI MAIN ROAD ERODE | ERODE | ERODE | TAMIL NADU | L2 | Rejected-Finance L2 | |
| 3 | L3₹363.3 Cr+₹13.0 Cr (3.72%)Rejected-Finance NO 4 GROUND FLOOR ALAYAM SPACE ANANDHA ROAD ALWARPET CHENNAI 600 018 | CHENNAI | TAMIL NADU | 600018 | L3 | Rejected-Finance L3 | |
| 4 | L4₹382.1 Cr+₹31.8 Cr (9.09%)Rejected-Finance PRA HOUSE NEHRU PARK ROAD SURAJPUR SURAJPUR CHHATTISGARH 497229 | SURAJPUR | CHHATTISGARH | 497229 | L4 | Rejected-Finance L4 | |
| 5 | L5₹423.0 Cr+₹72.7 Cr (20.8%)Rejected-Finance 175 2 SOUTH STATE BANK NAGAR CHETTIPALAYAM ERODE 638 002 | ERODE | ERODE | TAMIL NADU | 638002 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | P and C Projects Private Limited L1 | RPP infra Projects limited L2 | Barbrik Project Limited L4 | RAMALINGAM CONSTRUCTION COMPANY PRIVATE LIMITED L5 | KCP INFRA LIMITED L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00LANDSCAPE | ||||||||
| 1.00EARTH WORK | ||||||||
| 1.00 | Base work preparation: Organic Bio pesticides spray to kill the weeds after kill the weeds add watering and losing the soil with out damage any trees and palms roots and removals of all unwanted materials up to 1' 6" to 3'.0" depth this work done only manually & All unwanted materials except good soil shifted by vender by his own cost including shifting the debris out side premises | 10,152 | sq.m | 70 ₹7,10,640 Lowest | 292 ₹29,64,384 | 245 ₹24,87,240 | 635 ₹64,46,520 | 279 ₹28,32,408 |
| 1.00 | Supply of red Soil: Supply & stacking of red earth at site to the departmental gauge for pre-measurements which is of light textured, crystalline, porous and friable and not of generally acidic or neutral but not of alkaline and should be fertile, including seignior age charges, cost of transportation, loading, unloading, stacking and inclusive of all taxes etc., complete. ( Note: 80 % of volume of measurements only consider per load the joint measurement will taken with Pmc Incharge)
REDSOIL ( 80%) | 8,122 | Cu.m | 1,920 ₹1,55,94,240 Lowest | 3,124 ₹2,53,73,128 | 2,449 ₹1,98,90,778 | 3,000 ₹2,43,66,000 | 2,990 ₹2,42,84,780 |
| 1.00 | COCOPEAT: Supply of Coir Pith including cost of transportation, loading, unloading, stacking etc., complete. ( Note: 80% of Volume of measurements only consider per load the joint measurements will taken with PMC INCHARGE)
COCOPEAT (10%)- 503.36 cum | 4,06,082 | Kg | 10 ₹40,60,820 | 8 ₹32,48,656 Lowest | 24 ₹97,45,968 | 100 ₹4,06,08,200 | 8 ₹32,48,656 Lowest |
| 1.00 | Farm yard manure: Supply of well decomposed Farm yard Manure in a powdery form, devoid of soil sand, stones, plastics and other materials, highly nutrient and which supports plant growth. (Note: 80% of Volume of measurements only consider per load the joint measurement will taken with PMC INCHARGE)
FARM YARD MANURE-10% (Mixing with Neem cake 1 lorry load manure mix with 25bags of neem cake per loads) | 1,015 | Cu.m | 1,440 ₹14,61,600 Lowest | 1,999 ₹20,28,985 | 3,674 ₹37,29,110 | 2,675 ₹27,15,125 | 1,914 ₹19,42,710 |
| 1.01 | Mixing of red soil alone with cocopeat and farm yead manure as per the above specifications shifting as well back filling to be landscape areas & mixing will be done by JCB (MEPZ Will provide by stock yard to dump the all materials) once landscape work completed they have to clean it and hand over to MEPZ
MIXING OF RED SOIL COCOPEAT AND MANURE | 10,152 | Cu.m | 480 ₹48,72,960 | 97 ₹9,84,744 | 110 ₹11,16,720 | 107 ₹10,86,264 | 92 ₹9,33,984 Lowest |
| 1.01EARTH WORK FOR GRASS PAVERS | ||||||||
| 1.01 | Supply of red Soil: Supply & stacking of red earth at site to the departmental gauge for pre-measurements which is of light textured, crystalline, porous and friable and not of generally acidic or neutral but not of alkaline and should be fertile, including seignior age charges, cost of transportation, loading, unloading, stacking and inclusive of all taxes etc., complete.
REDSOIL- 80% (Follow S No 2 Base preparation) | 261 | Cu.m | 1,920 ₹5,01,120 Lowest | 3,124 ₹8,15,364 | 2,449 ₹6,39,189 | 2,675 ₹6,98,175 | 2,990 ₹7,80,390 |
| 1.01 | COCOPEAT: Supply of Coir Pith including cost of transportation, loading, unloading, stacking etc., complete.
COCOPEAT- 10%- 26.32 CUM (Follow S No 3 Base preparation) | 13,042 | Kg | 10 ₹1,30,420 | 8 ₹1,04,336 Lowest | 24 ₹3,13,008 | 107 ₹13,95,494 | 8 ₹1,04,336 Lowest |
Tender Value
₹457.6 Cr
EMD Value
₹4.7 Cr
Closing Date
31 Oct 2025, 3:00 pmClosed
Dy. Chief Engineer
WAPCOS Limited (Madras Special Economic Zone Project Office), MEPZ-SEZ, Tambaram, Chennai- 600 045
Revamping of Trunk Infrastructure Facilities at MEPZ Special Economic Zone, Tambaram, Chennai
2025_MSEZA_879589_1
WAP/ENVT/MEPZ/2025/ET/07
Open Tender
Construction Works
Item Rate
730 days
MEPZ SEZ, Tambaram, Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,600
Payable To WAPCOS Limited
₹4.7 Cr
MEPZ Administrative Building
10 Feb 2026
30 Sept 2025
3 Nov 2025
30 Sept 2025
31 Oct 2025
30 Sept 2025
30 Sept 2025 - 14 Oct 2025
14 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | LANDSCAPE | - | - | - | - |
| 0.999 | EARTH WORK | - | - | - | - |
| 0.000 | Base work preparation: Organic Bio pesticides spray to kill the weeds after kill the weeds add watering and losing the soil with out damage any trees and palms roots and removals of all unwanted materials up to 1' 6" to 3'.0" depth this work done only manually & All unwanted materials except good soil shifted by vender by his own cost including shifting the debris out side premises | 10,152 | sq.m | - | - |
| 0.999 | Supply of red Soil: Supply & stacking of red earth at site to the departmental gauge for pre-measurements which is of light textured, crystalline, porous and friable and not of generally acidic or neutral but not of alkaline and should be fertile, including seignior age charges, cost of transportation, loading, unloading, stacking and inclusive of all taxes etc., complete. ( Note: 80 % of volume of measurements only consider per load the joint measurement will taken with Pmc Incharge)
REDSOIL ( 80%) | 8,122 | Cu.m | - | - |
| 0.000 | COCOPEAT: Supply of Coir Pith including cost of transportation, loading, unloading, stacking etc., complete. ( Note: 80% of Volume of measurements only consider per load the joint measurements will taken with PMC INCHARGE)
COCOPEAT (10%)- 503.36 cum | 4,06,082 | Kg | - | - |
| 0.999 | Farm yard manure: Supply of well decomposed Farm yard Manure in a powdery form, devoid of soil sand, stones, plastics and other materials, highly nutrient and which supports plant growth. (Note: 80% of Volume of measurements only consider per load the joint measurement will taken with PMC INCHARGE)
FARM YARD MANURE-10% (Mixing with Neem cake 1 lorry load manure mix with 25bags of neem cake per loads) | 1,015 | Cu.m | - | - |
| 0.000 | Mixing of red soil alone with cocopeat and farm yead manure as per the above specifications shifting as well back filling to be landscape areas & mixing will be done by JCB (MEPZ Will provide by stock yard to dump the all materials) once landscape work completed they have to clean it and hand over to MEPZ
MIXING OF RED SOIL COCOPEAT AND MANURE | 10,152 | Cu.m | - | - |
| 0.999 | EARTH WORK FOR GRASS PAVERS | - | - | - | - |
| 0.000 | Supply of red Soil: Supply & stacking of red earth at site to the departmental gauge for pre-measurements which is of light textured, crystalline, porous and friable and not of generally acidic or neutral but not of alkaline and should be fertile, including seignior age charges, cost of transportation, loading, unloading, stacking and inclusive of all taxes etc., complete.
REDSOIL- 80% (Follow S No 2 Base preparation) | 261 | Cu.m | - | - |
| 0.999 | COCOPEAT: Supply of Coir Pith including cost of transportation, loading, unloading, stacking etc., complete.
COCOPEAT- 10%- 26.32 CUM (Follow S No 3 Base preparation) | 13,042 | Kg | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_924553.xls
BOQ • 2.20 MB
NITTrunk.pdf
Tender Documents • 6.28 MB
Corrigendum1.pdf
PDF • 0.01 MB
Corrigendum2.pdf
PDF • 0.07 MB
PrebidMinutes.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .