| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹1.9 L+₹173 (0.09%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹1.9 L+₹212 (0.11%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹1.9 L
EMD Value
₹3,862
Closing Date
1 Oct 2026, 5:00 pmClosed
EE - I LDCD
O/O EE-I, LDCD Fuleswar Uluberia Howrah
Emergent restoration of left bank of Madaria khal at Kotalpara for a length of 20.00 m in connection with Flood Protection and mitigation work in GP-Sirajbati , Block -Amta - I, P.S. - Amta, Dist.-Howrah. (2nd Call)
2026_IWD_5076143_2
WBIW/EE-I/LDCD/e-SNIT-5/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
Amta
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,862
5 Oct 2026
29 Sept 2026
2 Oct 2026
29 Sept 2026
1 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 100 | Sqm | 5.96 | ₹596 |
| 2 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(i) 15.00 cm av. Diameter | 126 | Metre | 258.62 | ₹32,586.12 |
| 3 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
(i) 15.00 cm av. Diameter
1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.
2) For driving done by pile engine set (without staging) under specific instruction of Engineer-incharge, the rates will be enhanced by ` 4.00 per meter. | 105 | Metre | 129.91 | ₹13,640.55 |
| 4 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
((a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus. | 40 | Metre | 123.95 | ₹4,958 |
| 5 | Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @ 20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge. | 20 | Sqm | 520.82 | ₹10,416.4 |
| 6 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete.
Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.” | 1,706 | Each | 26.22 | ₹44,731.32 |
| 7 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). | 1,706 | Each | 14.3 | ₹24,395.8 |
| 8 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, leveling as per direction of the Engineer-in-charge within a lead of.
A) Beyond 4.00 km and upto 5.00 km
NB :- Measurement to be taken on the basis of stack measurement/pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.(For compensation for earth for land owned and arranged by conductor add Rs. 25.00 per m3 extra over rate of E/W for land owned/arranged by the department. Royalty charge on earth @ 29.00 per m3 & Cesses charges @Rs. 5.30 per m3(i.e. Rs. 15.00 per 100 cft) as per govt notification which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses.) | 166.46 | Cum | 371 | ₹61,756.66 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_5168694.xls
BOQ • 0.27 MB
Form2911.pdf
Tender Documents • 0.56 MB
2.pdf
Other Document • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .