| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance Below Rate, Accepted |
| 2 | L2₹8.6 L+₹7,643.67 (0.90%)Rejected-Finance H NO 12 13 NANDWANI NAGAR SONEPAT 131001 | SONEPAT | SONIPAT | HARYANA | 131001 | ₹8.6 L+₹7,643.67 (0.90%) | L2 | Rejected-Finance Above Rate, Rejected |
| 3 | L3₹8.7 L+₹12,956.96 (1.52%)Rejected-Finance | ₹8.7 L+₹12,956.96 (1.52%) | L3 | Rejected-Finance Above Rate, Rejected |
| 4 | L4₹9.1 L+₹59,564.70 (6.99%)Rejected-Finance NEAR OBC BANK JHAJJAR 124103 | JHAJJAR | JHAJJAR | HARYANA | 124103 | ₹9.1 L+₹59,564.70 (6.99%) | L4 | Rejected-Finance Above Rate, Rejected |
| 5 | L5₹9.4 L+₹90,605.46 (10.6%)Rejected-Finance SHIV MANDIR H NO 19 NEAR SHIV MANDIR 124103 | JHAJJAR | HARYANA | 124103 | ₹9.4 L+₹90,605.46 (10.6%) | L5 | Rejected-Finance Above Rate, Rejected |
Tender Value
₹9.3 L
EMD Value
₹22,000
Closing Date
24 Aug 2026, 6:00 pmClosed
Pankaj Saini
Municipal Council Jhajjar
Construction of Shed in Adarsh Gaushala gurukul Jhajjar, Ward No.1 (MP-LADS)
2026_HRY_541200_1
20267EDCBB02 59AA 4604 9DDF 7D3BF848F94D323ULB
Open Tender
Civil Works
Works
60 days
Jhajjar
2 documents required · 2 mandatory
₹1,000
₹22,000
Yes
1 Sept 2026
15 Aug 2026
25 Aug 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] | 401.35 | Sqm | 31 | ₹12,441.85 |
| 2 | [13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate] | 5,537 | Kg. | 105 | ₹5,81,385 |
| 3 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 56.49 | cum | 83 | ₹4,688.67 |
| 4 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 17.28 | cum | 78 | ₹1,347.84 |
| 5 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 2 | cum | 2,442 | ₹4,884 |
| 6 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 12 | cum | 4,374 | ₹52,488 |
| 7 | [6.33.1]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 1. Mild steel and Medium Tensile steel bars [Through Rate] | 1,000 | Kg. | 66 | ₹66,000 |
| 8 | [9.22.3]Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 3. 0.63 mm thick with zinc coating not less than 275 gm/ m² [Through Rate] | 254.16 | Sqm | 822 | ₹2,08,919.52 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_620587.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .