Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 CrAccepted-AOC | ₹19.3 Cr | L1 | Accepted-AOC office order attached |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹20.5 Cr
EMD Value
₹41 L
Closing Date
15 May 2026, 12:00 pmClosed
EE CD BUILDING PWD VARANASI
SE PMGSY CIRCLE PWD VARANASI
Construction of Chief Minister Model Composite School Pre Primary to Class 12 at Pindara Paragana Colasala Tahsil Pindara District Varanasi
2026_CEPMP_1146728_1
516/34Bhawan PMGSY Circle/26 Date 30.04.2026
Open Tender
Civil Works - Buildings
Percentage
EE CD BUILDING PWD VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹41 L
SE PMGSY CIRCLE PWD VARANASI
6 Jul 2026
9 May 2026
15 May 2026
9 May 2026
15 May 2026
9 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means {Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. . (Including all taxes, T&P and labour cess but excluding GST) | - | CUM. | 127 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. (Including all taxes, T&P and labour cess but excluding GST) | - | CUM. | 135 | - |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides offoundation etc. complete for all lift. | - | CUM. | 140 | - |
| 4 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In grill, gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 110.4 | Kg | 123 | ₹13,579.2 |
| 5 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (Including all taxes, T&P and labour cess but excluding GST) | 2,510 | SQM. | 13 | ₹32,630 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). (Including all taxes, T&P and labour cess but excluding GST) | - | CUM. | 4,868 | - |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Including all taxes, T&P and labour cess but excluding GST) | - | CUM. | 1,518 | - |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra Concrete of M30 grade with minimum cement content of 350 kg /cum All works upto plinth level a) Footing (Including all taxes, T&P and labour cess but excluding GST) | - | CUM. | 6,900 | - |
| 9 | Same as item no. 8 but All works above plinth & up to floor V level. Concrete of M25 grade with minimum cement content of 330 kg /cum (Including all taxes, T&P and labour cess but excluding GST) | - | CUM. | 7,047 | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (Including all taxes, T&P and labour cess but excluding GST) | - | CUM. | 8,222 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
CBDCompo.pdf
Tender Documents • 33.19 MB
BOQ_2144595.xls
BOQ • 6.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .