| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹10.0 L+₹13,694 (1.39%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹12.9 L+₹3.1 L (31.2%)Rejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹18.1 L+₹8.3 L (84.2%)Rejected-Finance | L4 | Rejected-Finance Being L4 |
Tender Value
₹18.9 L
EMD Value
₹38,000
Closing Date
25 Jul 2020, 6:00 pmClosed
GE (East) Allahabad
Stanley Road, Teliyarganj, Allahabad
MANNING AND OPERATION OF 33 KV SUB STATION AT OLD CANTT ALLAHABAD.
2020_MES_356400_1
8395/E8
Open Tender
Civil Works
Item Rate
334 days
Allahabad
As Per NIT
6 documents required · 6 mandatory
₹500
Yes
GE (East) Allahabad
₹38,000
Yes
19 Aug 2020
27 Jun 2020
1 Aug 2020
27 Jun 2020
25 Jul 2020
11 Jul 2020
Amount
Manning & Operation of HT main receiving station (MRS) having 33 KV including duty attending complaint in station for continuous duration of 8 hours in First shift from 0600 hours to 1400 hours by deploying one highly skilled Electrician and one Helper including Sunday & holidays complete including routine preventive maintenance / checks and attending breakdown at substations including supply and use of consumable like lubricant oil, grease, cotton waste etc. complete all as specified & as directed. The installation comprises of following equipments for maintenance & operration:- (a) 33 KV metering equipment, GOD's busbars, insulators (b) 33 KV VCB's of make Crompton Greaves - 03 Nos. (c) 33 KV/11 KV step down outdoor type transformers of make : Kirloskar - 1.6 MVA - 02 Nos. (d) 33 KV/11 KV step down outdoor type transformers of make : Schneider - 2.0 MVA - 01 No (e) 11 KV VCB's of Incoming/Outgoing - 08 Nos. (f) Bus coupler of make 'T' square - 02 Nos. (g) LT panel consisting of MCCBs, metering equipments and indicators - 01 No.
Ditto all as per Serial Item No. 1 here in before but Second shift from 1400 hours to 2200 hours by deploying one highly skilled Electrician and one Helper complete --- ditto --.
Ditto all as per Serial Item No. 1 here in before but Third shift from 2200 hours to 0600 hours by deploying one highly skilled Electrician and one Helper complete --- ditto --.
Note for Srl No.01 to 03:- Notes: - (i) Necessary log sheets, maint register / attendance register be supplied and maint by the contractor and same shall be pruduced to Engineer-in-Charge.. (ii) Electricity required for operation & maintenance shall be issued by department to contractor 'free of cost'. (iii) The contractor shall employ the skilled operator / Electrician / Mechnic having “ITI certificate” from the Govt / Govt Recognized College having minimum 02 Years experience of operator / Electrician / Mechnic trads mark for maintaining electric installation. (iv) Contractor will ensure that 'life Insurance certificates of each Employees / opertors' against any mis-happening will be produced before commencement of work to the Engineer-in-Charge. In case of any death of the operator contractor will solely be responsible and any claim what so ever on this account shall not be admissible.
Note Contd/..:- (v) In case contractor fails to employ the duty personnel in any of the shift he shall be liable to bear the recovery @ Rs. 1500/- per shift per person and no payment shall be made for that shift. (vi) The contractor will deploy one experience supervisor for supervision and taking instructions from AGE regarding the activity of issue of required store and the cost of deployment of supervisor is deemed to be included in the rate quoted by the contractor. (vii) All the item retrieved shall be returned to AGE (E/M) Old Cantt store which shall be entered in demolition register. (viii). The contractor shall provide set of proper tool box, set of electrical universal tool kit, bamboo / steel laders, torck light / emergency light and search light etc. to each electrician / tradman. He will also provide the safety wear (uniform, shoe, belt, helmet etc.) to all the men deputed on duty and they will wear the same on duty.
Note Contd/..:- (ix) Cleaning of the surounding area such as triming of bushes, removing of grass of the Complaints Cell shall be deemed to include in unit quoted rates. (x) The contractor shall employ the electrician / mechnic / tradesman and will submit police verification of his character and antecedents within 30 days of comencement of work. (xi) All operator / electrician / mechnic / tradesman shall be well equipped with tool kit, hand gloves, safety gear as directed by Engineer-in-charge.
(xii) Necessary log sheet / attendance register and other routine records as instructed by Engineer-in-Charge shall be supplied and maintained by the contractor. (xiii) Minor parts / materials required for replacing due to defectiveness shall be included in unit quoted rates & any claim will not entertained on this account on later stage. (xiv) Fixing & taking down charges of materials measured shall be deemed to include in unit quoted rates and any claim will not be entertaind on this account at later stage. (xv) The contractor shall strictly adhere / payment not less than minimum fare wage as fixed by Labour ministries time to time and payment shall be made only through cheque / online to employee aadhar linked bank account and produce proof of payment to Engineer-in-Charge. (xvi) The contractor shall strictly adhere the EPF policy as applicable and submit EPF slip for verification of the Engineer-in-Charge. (xvii) The quoted rates deemed to be included the GST as applicable. (xviii) The expence incurred due to insurance & EPF sheme for the staff deployed by the contractor for manning & operation shall also be deemed including in the quoted rates of BoQ. Nothing extra shall be admissible in this regard.
M/S MAISUR CONSTRUCTION COMPANY PRIVATE LIMITED
M/S SS Tarders
airstack india
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .