| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-Finance SALEM | SALEM | ₹12.5 L | L1 | Accepted-Finance Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical EMD condition not satisfiedand |
| 3 | Rejected-Technical | - | - | Rejected-Technical EMD condition not satisfiedand |
| 4 | Rejected-Technical | - | - | Rejected-Technical BQR condition not satisfied |
| Sl No | Description | Qty | Unit | Delta Roto Tech Private LimitedV L1 |
|---|---|---|---|---|
| 1.00 | STATOR REWINDING (6.6 KV) GVPICharges towards dismantling the motor, threading out the rotor from the stator core pack, stripping out of old windings, cleaning the slots, conducting hot spot test find out the core damages, removing the stator core pack from the stator yoke by hydraulic press using special jigs and fixtures, rewinding the stator using class 'F' enameled polymica covered electrolytic grade rectangular copper conductors for rewinding coil as per the Original shape and dimension by using special jigs and dies as detailed in Sl no.2), pre-staggering the coil with thermopreg, insulating the slot portions using samicapor insulating materials, applying corona protection tapes and stress grading tapes, inserting the coils in to the slots, banding the overhang portions in the surge ring, forming the end connection, fixing 12 Nos. RTDs, preheating, Global Vacuum Pressure Impregnating the winding with core pack in vacuum chamber using suitable poly epoxy resin, baking, testing, refiixing the core pack into the stator yoke with special jigs and fixtures in hydraulic press, providing flexible silicon cables, applying finishing varnishes including assembling, no load trial run and measuring all no load parameters .
Materials: class F” enameled polymica covered electrolytic grade rectangular copper conductors,samicapor insulating materials,corona protection tapes, stress grading tapes,12 Nos. RTDs,poly epoxy resin,flexible silicon cables, varnishes. | 1 | No | 8,38,001 ₹8,38,001 Lowest |
| 2.00 | STATOR CORE RESTACKING: Charges towards mounting the stator body in hydraulic press,removing the core pack from stator body with special tools and machineries after heating the stator yoke with special heating arrangements, segregating the damaged stator core from core pack, removing the old burnt core plate varnishes by chemical treatment, cleaning,removing the surface kinks. Varnishing the stampings in re-varnishing cum conveyor oven to cure the core plate varnish, staggering the core with special tools and machineries, locking and repositioning the core pack to the stator body by hydraulic press and finally conducting the flux loop test to ascertain the restacked core healthiness, cleaning and polishing the slots ready to feeding. Materials:New Stator core plate,core plate varnish | 1 | No | 46,000 ₹46,000 Lowest |
| 3.00 | ROTOR TESTING & SERVICE: Charges towards threading out the rotor from the stator core pack,cleaning the rotor winding throughly using high pressure water, drying out the winding, conducting non -destructive test to the rotor bars and end rings,to ascertain the healthiness of the windings,visual inspecting the rotor in all eletrical and mechanical parts, preheating, varnishing and backing in oven,applying finishing varnishes to the rotor, checking the shaft trueness,measuring the bearing fitting tolerance both in housing and rotor shaft.
Material:Varnish | 1 | No | 60,000 ₹60,000 Lowest |
| 4.00 | ROTOR-RE-BARRING: Charges towards mounting the rotor in the lathe, machining both side end ring, stripping out the bars in bar removing machine using special tools and machineries, machining the rotor bars & 2 Nos. end rings made out of electrical conductivity grade copper using copper bars & copper end rings, inserting the rotor bars using special tools and machineries, positioning, locking, machining both side rotor bars for proper bedding of bars and end rings, brazing the bars and end rings using silver brazing rods, flux & oxy-acetylene gas and thermal protection materials, conducting the healthiness of the brazed joints before and after machining the excessive materials, cleaning, dip varnishing the rotor with class F varnish, baking, applying finishing varnishes to the overhang portions (if required) | 1 | No | 95,000 ₹95,000 Lowest |
| 5.00 | ROTOR CORE REPLACEMENT : Charges towards machining the core locks, removing the core pack from rotor shaft with special tools and machineries after heating the rotor core pack with special heating arrangements, procuring the newstampings with exact to the original dimensions with suitable grade material, staggering the core with special tools and machineries, locking and repositioning the core pack to the rotor shaft by hydraulic press and finally conducting the flux loop test to ascertain the stacked core healthiness, checking the rotor shaft trueness, cleaning and polishing the slots ready to feeding(if required) | 1 | No | 80,000 ₹80,000 Lowest |
| 6.00 | Charges towards dynamically balancing the rotor to grade G2.5 at rated RPM | 1 | No | 15,000 ₹15,000 Lowest |
| 7.00 | Rectification of cooling fan with dynamic balancing work | 1 | No | 21,000 ₹21,000 Lowest |
| 8.00 | cooling fan cover rectification work | 1 | No | 28,000 ₹28,000 Lowest |
| 9.00 | Rectification work for stator cover | 1 | No | 15,000 ₹15,000 Lowest |
| 10.00 | Providing ERW heat exchanger tubes which have existing pipe quality and dimention including removing the old damaged cooling tubes and cleaning the holes and refixing the new tubes and locking for 6.6KV, 230KW, 1486rpm, Kirloskar make ASDP motor. (Released old tubes to be devoluted at NCTPS-I stores)-371 Nos. | 1 | No | 1,20,000 ₹1,20,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹23,100
Closing Date
17 Sept 2025, 2:00 pmClosed
SE/ES/NCTPS-I
Superintending Engineer Electrical System NCTPS I Chennai 120
NCTPS I ES Circle EM II Dn S Dn II Repair and rewinding of 1 no failed HT ASDP motor released from location 2B1 Kirloskar make 6 6KV 230KW 1486 RPM Frame Size KD 400 Sl No 3940207 2
2025_EB_600550_1
CE/NCTPS-I/SE/ES/WC-26/2025-26
Open Tender
Power/Energy Projects/Products
Works
90 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹23,100
Yes
20 Nov 2025
4 Sept 2025
18 Sept 2025
4 Sept 2025
17 Sept 2025
4 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .