Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.1 LAdmitted-Fee/PreQual/Technical/Finance | -16.00% | ₹20.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.3 L+₹21,571.88 (1.07%)Admitted-Fee/PreQual/Technical/Finance | -15.10% | ₹20.3 L+₹21,571.88 (1.07%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹21.7 L+₹1.5 L (7.62%)Admitted-Fee/PreQual/Technical/Finance | -9.60% | ₹21.7 L+₹1.5 L (7.62%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.0 L
EMD Value
₹24,000
Closing Date
13 Aug 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV..C.NO.E1/4441/2026 RESTORATION OF METRO WATER (CMWSSB/C.E. (P)-II/SE(P0-III) B.T. ROAD CUT PORTION AT KALLATHUDEDU MAIN STREET IN DIVISION-181, UNIT-41, ZONE-14.
2026_CoC_690948_1
Z.O.XIV..C.NO.E1/4441/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹24,000
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Excavation And Deposting on Bank With In...mall Size Boulders And Hard Gravelly Soil (SS 20A) | 364 | CUM | 156.4 | ₹56,929.6 |
| 2 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 286 | CUM | 2,709.1 | ₹7,74,802.6 |
| 3 | Providing And Laying. In Position, Standardised Co...The Department For The Excess Usage of Materials). | 78 | CUM | 9,539.34 | ₹7,44,068.52 |
| 4 | Providing and laying Tack coat over the existing b...e as per Clause 503 of MoRT&H Specifications Rev.5 | 1,820 | CUM | 30.83 | ₹56,110.6 |
| 5 | Providing and laying Bituminous Concrete to 30 mm ...ble Only If The Work Is Carried Out During Night). | 1,820 | SQM | 379.03 | ₹6,89,834.6 |
| 6 | Carting away the surplus earth and debris to a lea...Corporation Land as directed during the execution. | 364 | SQM | 206.4 | ₹75,129.6 |
stage.html
html • 0.02 MB
finance_830752.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_830752.xls
BOQ • 0.31 MB
4441.pdf
Tender Documents • 1.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .