Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAccepted-Finance | ₹47.9 L | L1 | Accepted-Finance Rs. 4790171.16 |
| 2 | L2₹54.4 L+₹6.5 L (13.7%)Rejected-Finance H NO 3 B M J COMPOUND NEAR BENARA FACTORY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | ₹54.4 L+₹6.5 L (13.7%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹59.1 L+₹11.2 L (23.4%)Rejected-Finance 0 | ₹59.1 L+₹11.2 L (23.4%) | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹66.5 L+₹18.6 L (38.9%)Rejected-Finance 33 73 LATAKUNJ AJMER ROAD BALUGANJ AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | ₹66.5 L+₹18.6 L (38.9%) | L4 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹73.8 L
EMD Value
₹5.7 L
Closing Date
18 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
New Construction work of Garhi Thakur Das Road (Rohta Nahar Patri) to Peetars Inter College Unit-2 Tak Road
2026_CEAGR_1124010_3
1240(1)/14M-AC/2025-26 dated 28-02-2026
Open Tender
Civil Works
Percentage
180 days
Agra
New Construction work
2 documents required · 2 mandatory
₹2,360
₹5.7 L
Yes
Agra
25 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A (PC WORK)
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1. with all lifts and leads,1000M spreading, grading to required slope and compacting to meet requirement of Tables300.1 and 300.2 as per Technical Specification clause 301.5 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 4,480 | Cum | 56.9 | ₹2,54,912 |
| - | Construction of embankment with approved materials obtained from roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 As 'per SOR Ch. 5 S. No.19 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 4,540 | Cum | 58 | ₹2,63,320 |
| - | By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Sr No. 4.1 Ref No. 401. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 570 | Cum | 2,660 | ₹15,16,200 |
| - | Providing, laying, spreading and compacting stone aggregates of 45-63 mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 315 | Cum | 3,245 | ₹10,22,175 |
| - | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 315 | Cum | 3,310 | ₹10,42,650 |
| - | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 Sr No. 5.1 Ref No. 502 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 4,240 | Sqm | 38 | ₹1,61,120 |
| - | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 5.2 Ref No. 503 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Sqm | 14 | - |
| - | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Sqm | 161 | - |
| - | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Sqm | 57 | - |
| - | Brick edging on both side of the road of M-150 bricks 8cm (3") wide and 12cm(4½") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 1.12 | Km. | 86,000 | ₹96,320 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_2095307.xls
BOQ • 0.31 MB
3T2garhithakurdas.pdf
Tender Documents • 5.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .