| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹1.1 Cr+₹2.7 L (2.47%)Rejected-Finance | ₹1.1 Cr+₹2.7 L (2.47%) | L2 | Rejected-Finance L2 Tender |
| Sl No | Description | Qty | Unit | M/S.KCP CONSTRUCTIONS L2 | Sri Padhma Constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in soft rock not requirig blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. | 200.49 | Cu.m | 200 ₹40,098 | 196 ₹39,296.04 Lowest |
| 2.00 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION (OPEN FOUNDATION, RAFT FOUNDATION, CUT OFF WALL,FLEXIBLE &RIGID APRON)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 343.49 | Cu.m | 500 ₹1,71,745 | 490 ₹1,68,310.1 Lowest |
| 3.00 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION (OPEN FOUNDATION, RAFT FOUNDATION, CUT OFF WALL,FLEXIBLE &RIGID APRON)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 229.29 | Cu.m | 510 ₹1,16,937.9 | 490 ₹1,12,352.1 Lowest |
| 4.00 | Filling below the Raft / foundation concrete with clean coarse M-sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Raft. | 202.05 | Cu.m | 1,800 ₹3,63,690 | 1,736 ₹3,50,758.8 Lowest |
| 5.00 | Vibrated Cement Concrete of grade M 15 grade, using 40mm,20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for foundation concrete (below footing, below raft foundation, below retaining wall,Base course for Apron &Approach slab) | 20.21 | Cu.m | 5,300 ₹1,07,113 | 5,199 ₹1,05,071.79 Lowest |
| 6.00 | Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Cut off wall | 67.61 | Cu.m | 11,000 ₹7,43,710 | 10,425 ₹7,04,834.25 Lowest |
| 7.00 | Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Raft | 80.82 | Cu.m | 9,500 ₹7,67,790 | 9,354 ₹7,55,990.28 Lowest |
| 8.00 | Providing and making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh GabionBoxes as per IS 16014:2012, MORTH Clause 2500, of required size, Mesh Type 10 x 12 (D=100mm with tolerance of ± 2%) Zinc Coated, Mesh Wire diameter 3.0 mm, mechanically edged / selvedged with partitions at every 1m interval andshall have minimum 10 numbers of openings per meter ofmesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @3% by weight of Gabion boxes, filled withboulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-Charge | 116.4 | Cu.m | 3,500 ₹4,07,400 | 3,447 ₹4,01,230.8 Lowest |
| 9.00 | Vibrated RCC of grade M 30 grade using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Abutment and returns wall above sill | 53.07 | Cu.m | 12,000 ₹6,36,840 | 11,269 ₹5,98,045.83 Lowest |
| 10.00 | Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC dirtwall and bedblock | 4.62 | Cu.m | 11,000 ₹50,820 | 10,936 ₹50,524.32 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
31 Oct 2025, 3:00 pmClosed
The Project Director, DRDA, Chengalpattu
O/o The Project Director, DRDA, Chengalpattu
Construction of Submersible Bridge Near Adayar river at Jegadeesh Nagar at Annai Anjugam Nagar in Urapakkam Panchayat, Kattankulathur Block of Chengalpattu District under SCPAR Having Pkg No.01
2025_RDTN_605488_2
Rc.No.2628/2025/A14 dt.04.09.2025
Open Tender
Civil Works - Bridges
Item Rate
270 days
Kattankolathur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.2 L
O/o The Project Director, DRDA, Chengalpattu
19 Nov 2025
18 Oct 2025
31 Oct 2025
18 Oct 2025
31 Oct 2025
18 Oct 2025
24 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
TechinalBid01.pdf
Tender Documents • 0.45 MB
PriceBID01.pdf
Additional Documents • 0.79 MB
BOQ_735610.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .