Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC BELAWAN PAHADA MIRZAPUR | ₹11.0 L | L1 | Accepted-AOC accept |
| 2 | L2₹13.5 LRejected-Finance BHEVAR KARMANPUR AAMGHAT MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | ₹13.5 L | L2 | Rejected-Finance RATE |
Tender Value
₹17 L
EMD Value
₹1.7 L
Closing Date
18 Feb 2026, 12:00 pmClosed
EE CD2 PWD MIRZAPUR
EE CD2 PWD MIRZAPUR
SR
2026_CEMRZ_1114566_2
189/2A dt 17-01-2026
Open Tender
Civil Works
60 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
Yes
₹1.7 L
Yes
EE CD2 PWD MIRZAPUR
23 Mar 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
11 Feb 2026
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted. as per drawings and technical specifications Clause 802, 803, 1202 & 1203.
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.
Plain/ Cement Concrete in Super stucture complete as per Drawing and Technical Specifications. M-20 above Parapet wall & wing wall
Plain/Reinforced Cement Concrete in Super stucture complete as per Drawing and Technical Specifications. M-25 for Bed Block.
Plain/Reinforced Cement Concrete in Super stucture complete as per Drawing and Technical Specifications. M-25 for Slab.
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm die AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foci. Complete as per drawing and Technical Specifications
350 MM DIA HUME PIPE CULVERT Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted. as per drawings and technical specifications Clause 802, 803, 1202 & 1203.
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.
Supply of 350mm dia NP3 hume pipe.
Laying of 350mm dia NP3 hume pipe.
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_2066993.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid