Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | ₹6.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.4 LRejected-AOC | ₹6.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K SEKAR L2 | S SATHISHKUMAR L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF GIRLS TOILET FOR PUE SCHOOL AT OZHUGUR VILLAGE H/O OZHUGUR PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT | |||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full 1 depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 15.65 | Cum | 263.78 ₹4,128.16 | 263.7 ₹4,126.91 |
| 3.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. | 4.4 | Cum | 5,507.13 ₹24,231.37 | 5,507.1 ₹24,231.24 |
| 4.00 | Filling basement with excavated earth in layers of not more than 15cm thick well rammed, watered and consolidated complying with standard specifications etc, complete. | 17.16 | Cum | 45.85 ₹786.79 | 45.8 ₹785.93 |
| 5.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 15.94 | Cum | 6,162.67 ₹98,232.96 | 6,162.6 ₹98,231.84 |
| 6.00 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) | 13.52 | Sqm | 537.5 ₹7,267 | 537 ₹7,260.24 |
| 7.00 | Column | 33.84 | Sqm | 1,095 ₹37,054.80 | 1,094 ₹37,020.96 |
| 8.00 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinfo 5 cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 0.36 | MT | 92,005.94 ₹33,122.14 | 91,900.94 ₹33,084.34 |
| 9.00 | Rainforcement Cement Concrete 1:1 1/2:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the as directed by the departmental officers complete complying with standard | 5.95 | Cum | 9,430.41 ₹56,110.94 | 9,430.41 ₹56,110.94 |
| 10.00 | Supplying and delevery of Zinc sheet including cost and conveyance of all charges | 15.81 | Sqm | 1,080.2 ₹17,077.96 | 1,080.2 ₹17,077.96 |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
20 Nov 2025, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
CONSTRUCTION OF GIRLS TOILET FOR PUE SCHOOL AT OZHUGUR VILLAGE H/O OZHUGUR PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRICT
2025_RDTN_623368_1
A2/719/2025
Open Tender
Civil Works
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹6,500
Yes
6 Mar 2026
14 Nov 2025
20 Nov 2025
14 Nov 2025
20 Nov 2025
14 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_745383.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid